Arklow - GEWE 3.6 MW Offshore Project Lessons Learned

Slides:



Advertisements
Similar presentations
Offshore Wind 2004 From Vindeby to Nysted A Manufacturer’s Experience Henrik Stiesdal Bonus Energy A/S.
Advertisements

“Energy from the Sea – BioFuels, Currents, Tides & Wind” Panel Contribution by Dr Tony Raven Director, Research & Innovation Services University of Southampton.
© ABB Group May 1, 2015 | Slide 1 Large scale integration of Offshore Wind Power Design Considerations Peter Sandeberg /ABB, EOW 2009,
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
SLIM® and Bio-SLIM® The “Life starts at 36”-project:
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
ABB LCC ECS - 1 © 2004  Industrial IT Power Management System Scope & Value Proposition Lead Competence Center Electrical Control Systems.
Deep Water Offshore Wind Energy By Paul D. Sclavounos Horns Rev Wind Farm (Denmark) - Rated Power 160 MW – Water Depth 10-15m.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
October 30, 2007 © SKF Group Slide 0. Wind energy market from the perspective of a major sub-supplier Presented at EWEC 2009 Stefan Karlsson Global Segment.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
VetroEnergo AS Wind Power at the Kola Peninsula Presentation at Bellona Conference 1-2. April 2008 Lars Helge Helvig, Norsk Vind Energi AS.
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Georgia’s Off-shore Wind Opportunities Presented by Bill Bulpitt and Rita Kilpatrick for Tybee Island City Council March 27, 2008.
Alstom Wind Madrid, 20 th May 2010 Félix Urrea, VP Operations EMEA.
NAVITAS Techno-financial Project software for renewable energy Michael O’Connor HMRC.
Fossil Gulch Wind Park Presented By Jeff Duff Vice President, Airstreams LLC Welcome.
Information Technology Division Executive Office for Administration and Finance Springfield Data Center Program Energy Strategy Meeting 9/29/2009.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
Potential hazards and risks in the offshore wind park development process in Poland Stefan Simon, CEO Green Energy World.
Mechanical and Industrial EngineeringWind Energy Center University of Massachusetts Hull Offshore Wind Project: Next Steps J. F. Manwell, Prof. and Director.
OWEMES OWEMES 2009: Brindisi (21 – 23 May, 2009) Structure of the presentation:  Part One: Introduction on TPWind  Part Two:SRA / MDS  Part Three:
Cost trends for Offshore Wind - and a look at the resources David Milborrow
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
EUROPE’S ENERGY EXPORTER Neart na Mara. source EWEA.
Supply Opportunities in Canada’s Wind Energy Market Stephen Rach CanWEA Toronto, Ontario October 6, 2010.
National Wind Institute TEXAS TECH UNIVERSITY NAWEA Presentation by Dr. Andy Swift and Dr. Chris Pattison Texas Tech University Wind Science & Engineering.
Lessons Learnt from European Offshore Wind: 1999 to 2011 – a broad brush perspective Sebastian Chivers, Senior Vice President June 22, 2011 – Virginia.
AquaRET 2 LEONARDO DA VINCI - Transfer of Innovation AquaRET 2 Online Survey results Bilbao, 05/10/2010 E. Mavrou Environmental Scientist, MSc CRES - Greece.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
 Large Blade Testing Facility LARGE WIND TURBINES Rahul Yarala Executive Director, Wind Technology Testing Center May 12, 2011.
DOE Peer Review May 10, 2006 Golden, CO Walt Musial Leader-Offshore Projects National Renewable Energy Laboratory Offshore Wind.
SUPPLY CHAIN EVENT GLENOUTHER RENEWABLE ENERGY PARK FENWICK HOTEL, 10 TH SEPT 2015.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
Dan Finch Moray Offshore Renewables Ltd. DELIVERING ROUND 3 Inverness 2nd February 2010 MORAY FIRTH OFFSHORE RENEWABLES Ltd.
Progress Stage 1 Report – priority locations – Industry View (February 2010) Stage 2 – deliverability – planning and funding (June 2010) –Engagement –
Wind Energy: Technology, Markets, and Economics ECO 680 Dr. Gomis Porqueras.
FUTURE FOR OFFSHORE WIND ENERGY IN SPAIN Wind Energy Department
GBT - part of Econcern’s Wind Holding BV - works closely with Darwind BV and Steelworks BV. GBT forms an essential part of the value chain that will provide.
NAVITUS BAY UPDATE Sean Matthews Project Engineer 20 March 2013.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
Job number/BT/ serial number/ page number 008 BA003 1 Some thoughts on the cost of wind energy Andrew Garrad Garrad Hassan and Partners Cost effectiveness.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Kyoko Abe 16 March Outlines Concept Technology Market Status Potentials Projection.
An Overview of the Technology and Economics of Offshore Wind Farms
Power to the Coast Project Presented by: Su Wei Tan Industrial Research Ltd.
Restricted © Siemens AG 2014 All rights reserved.siemens.com/answers Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference.
North Coast Wind Farm Tolano Environmental Consulting.
Energy System Investment Models Paul Rowley & Simon Watson CREST Loughborough University.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Challenges for Wind Farm Development in Bulgaria: The Environmental Aspect Case study: Saint Nikola Wind Farm, Kavarna April 2009.
The Risks around Renewables? March 2012 Campbell Dunford.
Planning and Realisation of Wind Farms
Wind Power development in Russia: Barriers and Constraints
Uniper Energy Services
Restructuring Roundtable June 16, 2017
SALES: HOW TO USE THIS PRESENTATION
Innovation and Offshore Renewables
Dirk Scheelje Executive Board Member
Closed Loop Wind Farm Control
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Your partner with over 70 years of experience
IWEA Offshore Wind Conference, Dublin
Presentation transcript:

Arklow - GEWE 3.6 MW Offshore Project Lessons Learned John Stephens Global Development Manager GE Energy

Global Offshore Update A $ Multi-B industry over the next 10 years. Remarkable growth 15 – 20 % CAGR Can be sited closer to urban populations Proximity of local grid connection to urban centers. Less turbulence and WTG Fatigue Higher capacity factors – 50% Cost of electricity approaching 6¢/kWh Favourable regulatory support. Installed MW Offshore Europe Americas Onshore Global Growth US 2003 Installed <100 MW Planned >8 GW Europe 2003 Installed base 260 MW Planned >11 GW. Installed base for Wind Power

GE Wind Energy – Arklow Project Site Specifics 8.5 m/s wind speed at 73,5 m 10 km from shore 3.5 – 6.4 m water depth Breaking waves & high currents Dense sand & gravel Co-Development project of Airtricity & GE Wind Energy

Arklow Background 25.2 MW Demonstration project of GE Wind Energy’s 3.6 MW Offshore Wind Turbine Generator Project located 10 kms off the coast of Arklow, Ireland in the Irish Sea 7 x 3.6 MW WTGs constructed by GEWE in 2003 GEWE co-developed project with Irish Green energy company, Airtricity GEWE has built and will own and operate turbines for approximately 2 years, then transfer (BOOT) 45 miles south of Dublin During Ownership period GEWE will ensure acceptance of: Basic reliability of design Necessary operating hours to prove new technology Warranty provisions and weather exclusions adequate for financing Optimization of O&M – Cost effective and safe

Arklow Update All 7 Wind turbines Pre-Commissioned 3 Wind turbines commissioned & under final testing - expect to generate electricity by 8th March 2004 Remaining turbines 50% commissioned All undersea cabling connected & tested Land-based switch house commissioned Meteorological mast foundation and tower fully installed, monitoring & measurement equipment being installed Asset Management team in place Develop World class O&M Document lessons learned and implement solutions Completing evaluation of how to optimize access Completing comprehensive maintenance plan with major EHS focus Validating plan to jump to 4 MW Wind Turbine

Arklow Lessons Learned Construction Complete detailed logistics planning early in execution phase Complete geo-technical analysis early Develop design sufficiently to minimize changes Coordinate order placement w/ legal, accounting & tax constraints Acknowledge EHS risk & convert to competitive advantage Access…access…access Contractual Partner with offshore contractors having skills to take installation risk Engineering & Supply Chain must be completed ahead of construction window Manage undersea cable like a separate project New major components should be managed in a similar fashion to product NPI

Arklow EHS Grid Connection Environment & Safety Management Systems GEWE personnel closely liased with ESB to ensure Arklow Safety Management system interfaced with local Electricity Grid safety boundary documents. Leverage GE Safe Systems of Work from other GE Energy businesses to suite local legislative requirements Environment & Safety Management Systems GE’s global EHS systems recognized as world leaders. Risk management approach from Corporate level through to a Site’s business plan. Developing access systems to maximise availability and to suite local conditions. All offshore personnel are required to attend the BOSIET course(Basic Offshore Survival).

Arklow – Objectives and Plans Environment, Health & Safety GEWE will be a leader in the Offshore Wind Industry for EHS programs Active involvement and assessment of all activities from construction to access to O&M Established environmental monitoring and reporting program Operations & Maintenance (O&M) Using 2 year ownership period to develop expertise Asset Management, Services & Engineering organizations working closely to optimize

Arklow – Objectives and Plans Availability Tiger Team Multi-discipline team formed to drive reliability Manage Arklow turbines with high availability objective Establishing remote monitoring of Arklow turbines through monitoring center in Germany Assess design and develop redundancy to allow long maintenance intervals. Long term goal is once per year Access Evaluating options to optimize access methods considering EHS, availability impact and cost Recognize EHS risks and looking to set standards Looking to leverage best practices from other offshore industries

Thank you!