Papyrus Australia Walkamin Conversion Facility Status update Nov 2009.

Slides:



Advertisements
Similar presentations
Lightweight Forming System and Roofs for Concrete Floors.
Advertisements

Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Berwickshire High School Presentation compiled 15 th October 2009.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
January 6. January 7 January 8 January 9 January 10.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Structural Engineering
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Reconstruction of K4 Boiler for Biomass Combustion.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
The art of Engineering ERZİNCAN - TR 4 x 2.960KWe ~ 12 MWe HFO-DIESEL POWER PLANT WARTSILA 8R 32D Type  KWe VASA  Duel Fuel ( Diesel Oil / H.Fuel.
© Papyrus Australia Ltd 2009 PAPYRUS AUSTRALIA LTD Paper, Veneers, Board & Fibre from Banana Tree Trunks Progress Update.
Building With Superior Walls Introducing The Superior Advantage.
Single Loop Analogue addressable fire control Panel
California Energy Commission James Madigan April 27, 2015.
Lakes Creek Road Waste Transfer Station Construction highlights.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Distribution Guide. Company Profile  Founded by inventor Peter Sing in 1992, Sing Core originally manufactured its patented quarter sawn Sing Logs ®,
Open Source Learning Management Systems (OSLMS) Partnership Grant Meeting: October 19, 2010.
Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013.
Design Development Code analysis Partition types.
Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
Analysis following the update of the GSE Investment Database February 2010.
Current Situation ENERGY SUPPLY: Dramatically increasing prices since years Naturally limited oil, gas and coal supplies constantly increasing energy consumption.
F ACILITIES, P LANNING, AND C ONSTRUCTION November 16, 2015 – Monthly Construction Report Report.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
04 th Sept 2012 Competitor Survey ~ Loading Bay Condition (Series 1) ~ 18 th Aug 2012.
Payroll Office Year End Deadlines December 28, 2015 – 1 pm * Last day to request an On Demand Check * Overpayment repayments by personal check net calculations)
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Building Committee Presentation March 03, MAIN ENTRANCE.
STREET SIDE OF CURRENT BUILDING
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
LARP Vertical Test Facility
PAT MEETING HISD JACK YATES HIGH SCHOOL February 16, 2017 PAT MEETING.
AARNA Progress Report-January 2017
STREET SIDE OF CURRENT BUILDING
Woodland Public Schools
Pinole-Hercules Water Pollution Control Plant Upgrade Project
CONCRETE FORMWORK Formwork.
Library Remodel Update
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
دانشگاه شهیدرجایی تهران
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
Sustainable Inter-Regional Bike Tourism (SIBIT)
FACILITIES, PLANNING, AND CONSTRUCTION
تعهدات مشتری در کنوانسیون بیع بین المللی
Lafayette New Terminal Program Update
Building & Property Committee 12 December 2018
NC 160/Steele Creek Road Widening Update
Deep geothermal energy at Mol: The Balmatt-project
Revision of the ESA95 Regulation
Emission trading system with pollutants in Slovakia
2015 January February March April May June July August September
Presentation transcript:

Papyrus Australia Walkamin Conversion Facility Status update Nov 2009

Entrance to Mt Uncle Plantation, Walkamin

New Lady Finger Plantation near the Papyrus facility

Concrete foundation / floor being poured December 2008

Steel work being erected January 2009

Internal view of new shed January 2009

Road front view of new facility at Walkamin January 2009

Gas storage area view from back of the facility January 2009

Veneer dryer install in progress February 2009

Veneer dryer installation nearing completion February 2009

Beta veneering Unit in Situ March 2009

Beta veneering Unit being commissioned March 2009

Oil transfer thermal heating unit being installed March 2009

Trunk Billetiser / conveying system installation March 2009

Veneer exiting the BVU into the factory during commissioning May 2009

Veneer being conveyed and quality checked May 2009

Veneer ready for drying

Veneer tones post drying

Veneered coffee table on display during the Monaco Yacht show Sept 2009

Veneered Unit on display during the Monaco Yacht show Sept 2009

Veneered TV Unit on display during the Monaco Yacht show Sept 2009

Jaguar Airbag panel on display during the Monaco Yacht show Sept 2009

Banana fibre board product displayed during the Monaco Yacht show Sept 2009

Banana fibre board model boat filled with accelerant and set alight until it self extinguished (the burn time was approx 20mins) – it remained afloat and intact with only internal surface charring

Dried veneers with its deep tones and contrasting stripe engineered through process control

Thank you for your attention