Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Advertisements

n Headquarters:Raleigh, N.C. n Employees:17,355 n Customers:2.8 million n Primary Subsidiaries: CP&L, Florida Power, NCNG, Progress Telecom, SRS n Operating.
Overview History of the PDWG Three Steps to Renewable Water –Efficient Use –Sustainable Use –Reliable Use Conclusions.
Moving to the Next Level of Water Use Efficiency in Florida Janet G. Llewellyn, Director Division of Water Resource Management Florida Department of Environmental.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Durham – Where Great Things Happen City of Durham Jordan Lake Allocation Request Presentation to the Jordan Lake Partnership March 21, 2014.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
Shell and Prairie Creek Watershed Management Plan – Reasonable Assurance Documentation And Agricultural Reservoirs Southwest Florida Water Management District.
SFWMD Western Beltway Mitigation. Outline 1.Background 2.Mitigation Plan / Options 3.Future Projects / Available Funding Plants observed in Shingle Creek.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
SOUTHEASTERN WISCONSIN WATER SUPPLY ISSUES AND REGIONAL WATER SUPPLY PLANNING PROGRAM OVERVIEW Presentation for Ozaukee County Board of Supervisors and.
The Beginning Rapid Regional Growth Concerns about groundwater capacity Water quality issues Search for alternative solutions.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Presentation Title Here. Public Outreach Results  Consolidated Transit Development Plan (TDP)  Unique Polk County Communities  Listening Sessions 
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Broward County-wide Master Reuse Plan
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
 From a Regional Perspective Recent Growth Management Legislation.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Energizing Utilities to Embrace Demand Energizing Utilities to Embrace Demand Management South Florida Water Management District Water Summit December.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Central Florida Coordination Area South Florida, St. Johns River and Southwest Florida Water Management Districts.
Status of Regional Water Supply Plan Updates John Mulliken Director, Planning Division Water Supply Department Water Resources Advisory Commission January.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
Water Supply Facilities Work Plan Technical Assistance Workshop.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15.
1 Water Cooperative of Central Florida Utilities Department Orange County Board of County Commissioners July 26, 2011.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
Past, Present, Future Man power Equipment Area Serviced Expectations by users Ways to assist and cooperate.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Central Florida Water Initiative 6 recommendations for getting the water right.
Houston Area Water Corporation Northeast Water Purification Plant Houston Area Water Corporation Northeast Water Purification Plant October 13, 2000 CDM.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
CP-TXT Amendment to the Capital Improvements Element (Annual Update) September 25, 2007.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
SOUTHEAST FLORIDA UTILITY COUNCIL
Water Reclamation Plant Feasibility Study Update May 28, 2014
Redundancy and Emergency Interconnectivity (REI) Plan
For the Coosa North Georgia Region
Rob Pierce, Planning & Development Director
Water Supply Planning in the St
CP-TXT Amendment to the Capital Improvements Element & Public School Facilities Element (Annual Update) October 2008.
Central Florida Water Resources And the Disney Approach
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Sunrise Wastewater Reuse Program
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE east range communities REQUEST A $6 million request for State Funding in 2019 to build a comprehensive.
August 30, 2019 Robert Beltran, PE , BCEE
Why Potable Reuse in Florida?
Presentation transcript:

eld Polk County Southeast Regional Wellfield

Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)  17 municipalities  6 individual County Utility Service Areas  Traditional Groundwater Source Limited by Restrictions  Commitment from both SWFWMD & SFWMD ED’s to assist Polk in 3 ways  Comprehensive Water Supply Plan  Testing of the Lower Floridan in SE Polk  Inter district Coordination on Kissimmee River Water Supply Challenges

Hillsborough River Groundwater Basin 2 % of Polk No impacts allowed in UFA Regulatory Constraints

Stress Lakes 10% of Polk No impacts allowed in UFA & SA (0.044 Ft)

Regulatory Constraints Southern Water Use Caution Area 45% of Polk No impacts on the Most Impacted Area

Regulatory Constraints Proposed Kissimmee River Reservation 24% of Polk No impacts allowed in UFA & SA

Regulatory Constraints Green Swamp Area of Critical Concern 13% of Polk No impact in SA

Polk County Comprehensive Water Supply Plan SWFWMD & SFWMD Co-funded Focus was to Find Sources of Supply:  Identified Regional Projects  Tampa Bay Water  STOPR (Cypress Lakes)  SE Wellfield  Peace River / Land Use Transition  Associated Transmission Piping

MGD Water Demand Permitted Public Water Supply Projected Deficit MGD Project Water Demands – County Wide

Overall Implementation Plan Water Demand Permitted Water Supply Time Projected Water Demand

Southeast MGD Central 6-12 MGD Northeast 8-10 MGD

SFWMD/SWFWMD Cooperative Water Resource Development SFWMD & SWFWMD have shown a Polk Southeast Regional Wellfield in Regional Water supply Plans: 2010 SWFWMD Regonal Water Supply Plan 2009 Polk County Comprehensive Water Supply Plan 2007 Water Use Permits required use of Kissimmee River 2006 SWFWMD Regional Water Supply Plan 2005 SFWMD Kissimmee Basin Plan

SWFWMD New Water Supply Initiative Funds  Coordination with SWFWMD to Establish Co-operative Funding  Encumbrance of Funds from the reserves  Potential Partnership Agreements to secure funds and establish project financing

Southeast Wellfield Background 1.City of Auburndale 2.City of Eagle Lake 3.City of Frostproof 4.City of Haines City 5.City of Lake Alfred 6.City of Davenport 7.City of Lake Wales 8.City of Winter Haven 9.PCU- ERUSA 10.PCU NERUSA 11.PCU SERUSA 12.Town of Dundee 13.Town of Lake Hamilton

Southeast Wellfield Background

Peace River Only (No Pipeline to Lake Wales) Quantit y (MGD) Total Capital Cost (millions) $/gal CS-11 + U.S. Agrichem10.0 $ CS-11 + U.S. Agrichem + 2 nd Intake12.0 $ County Line + U.S. Agrichem12.0 $  Potential for 30 MGD  3 Phases of Development  Hard Water and High Sulfate Levels  May require advanced treatment

Southeast Regional Wellfield Critical Path 2011 to 2012 SWFWMD Partnership Agreement & SFWMD Permitting 2012 to 2013 Municipal Partnership Agreements 2013 to 2016 Preliminary Route Analysis, Distribution System & Facility Design, Construction of SWFWMD Lower Floridan Wells 2017 to 2019 Land & Right-of-Way Acquisition 2020 to 2022 Final Design & Construction of Wells 2 to Construction of Wells Construction & Raw Water System 2023 to 2025 Construction of 10 MGD Facility & Distribution System MGD Operational MGD Operational MGD Operational

QUESTIONS?