1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Helmholtz International Center for Oliver Boine-Frankenheim GSI mbH and TU Darmstadt/TEMF FAIR accelerator theory (FAIR-AT) division Helmholtz International.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Spectrometer compensation in IR2 and IR8 during the 450 GeV collision run September 11, 2006 LOC meeting Y. Papaphilippou Thanks to S. Fartoukh, W. Herr,
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
ALPHA Storage Ring Indiana University Xiaoying Pang.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
Name Event Date Name Event Date 1 Univ. “La Sapienza”, Rome, 20–24 March 2006 CERN F. Ruggiero Electron Cloud and Beam-Beam Effects in Particle Accelerators.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
RADWG-RADMONLHC Beam Loss Rates1 Beam Loss mechanisms Where? Beam loss in cycle – when? Totals per fill: before and during physics Totals per annum Comparison.
The Large Hadron Collider Contents: 1. The machine II. The beam III. The interaction regions IV. First LHC beam [R. Alemany] [CERN AB/OP] [Engineer In.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
With a lot of help from Reine Versteegen, John Jowett, Richard Jacobson, Burkhard Schmidt, Gilda Scioli, Werner Herr CERN-LHC * IP5 IP1 IP8 Spectrometer.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Overview of Collective Effects in MEIC Rui Li MEIC Collaboration Meeting Oct. 6-8, 2015.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
F. Willeke, Snowmass Luminosity Limitations of e-p Colliders Extrapolation from HERA Experience Examples for IR Layout LINAC-Ring Limitations HERA.
Ion effects in low emittance rings Giovanni Rumolo Thanks to R. Nagaoka, A. Oeftiger In CLIC Workshop 3-8 February, 2014, CERN.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Criteria for dynamic aperture limits and impact of the multipolar errors: summary of the simulations with beam-beam for levelling scenarios at 5 and 7.5x10.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
E. Todesco, Milano Bicocca January-February 2016 Unit 2 Magnets for circular accelerators: the interaction regions Ezio Todesco European Organization for.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Beam dynamics in crab collision K. Ohmi (KEK) IR2005, 3-4, Oct FNAL Thanks to K. Akai, K. Hosoyama, K. Oide, T. Sen, F. Zimmermann.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Operating IP8 at high luminosity in the HL-LHC era
MDI and head-on collision option for electron-positron Higgs factories
LHeC interaction region
Large Booster and Collider Ring
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Beam-beam Effects in Hadron Colliders
Electron cloud and collective effects in the FCC-ee Interaction Region
Spectrometer Operation in IP2 & 8
Follow-up of HL-LHC Annual meeting
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
HL-LHC operations with LHCb at high luminosity
Accelerator R&D Results from the B-factory
CLIC damping rings working plan towards the CDR
Collimators: Operations - Baseline Assumptions
Thanks to S. Fartoukh, W. Herr, B. Jeanneret, M. Giovannozzi
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
MEIC New Baseline: Luminosity Performance and Upgrade Path
HE-JLEIC: Boosting Luminosity at High Energy
MEIC New Baseline: Performance and Accelerator R&D
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision Scheme n Electron Cloud n Impedances n Official Schedule

2 Layout of the LHC

3 Layout of IR8 Dispersion SuppressorTripletMatching

4 A few definitions Beam transverse density, proportional to the beam-beam parameter Proportional to the beam current Inversely proportional to  * Beam-Beam Parameter:

5 A few definitions Head-on + Long range Beam-Beam Tune Shift Parameter: n Spread of the transverse oscillation frequencies n High order transverse resonances and a tune shift n It is limited by the space between dangerous resonances n Difficult to compensate for: all particles do not have the same tune shift Independent of  * n Its nominal value is

6 Crossing Angle n Avoid unwanted bunch collisions n Must be larger than the divergence of the beam envelope n Limited by the excursions of the beam trajectories (aperture limitations in the triplet) n In the expression for the luminosity there is a reduction factor for the crossing angle (0.1)

7 Beam Separation and crossing scheme n Spectrometer magnet compensation: 3 correction magnets to make local bump n Horizontal crossing n Vertical separation when not in collision Spectrometer Correctors End of triplet Correctors D2 D1 IP

8 Beam Separation and crossing scheme n Limitations by Aperture n Accomodate spectrometer -> 11.22m shift towards IP7 n Beam Separation 2 mm  tot =  spec +  ext  tot =345  rad / 75  rad depending on spectrometer polarity  spec =135  rad positive or negative  ext =210  rad constant n Crossing scheme only one direction n Ramping of spectrometer magnet important to permit both polarities of spectrometer (limitations at injection)

9 Beam Separation and crossing scheme  =1m 10mm 1mm 0.5mm

10 Optics IR8 Beam Size  =Sqrt (  *  gamma)  =70  m,  =10m  =400  m  =160  m,  =50

11 Nominal Luminosity vs  * n Wanted luminosity range for LHCb cm -2 s -1 Tunability 1m <  * < 35m Luminosity requirements fulfilled dynamically by varying  * Limited to 35m % of Nominal 10 % of Nominal

12 Luminosity Lifetime n Scattering from residual gas ignored ( torr) n The beam-beam effect and the intrabeam scattering produce emittance increase but this is compensated by synchrotron radiation damping. The net result is a decrease of emittance. n We are left with the formula above giving a lifetime of 26 hours n Beam-gas induced lost rate into the pipe at the triplet under study Number of Interaction points Total cross section ( cm 2 )

13 Luminosity Life Time n No Beam-Beam Blow up n No synchrotron radiation damping  decreases  L  = 11hours n Synchrotron radiation (theory)  constant  L  = 25hours n Synchrotron radiation (theory)  decreases because of beam blow up (SppS Collider)  L  = 10hours n Run on Beam-beam limit

14 Collision scheme n Distance between IPs = 891 half buckets: collision scheme has to repeat from one IP to the other n “Holes” (empty buckets) due to injection kickers SPS and LHC, dump Kicker LHC n There are 2808 filled buckets out of 3564 according to following scheme: {[(72b+8e)*3+30e]*2+[(72b+8e)*4+31e]}*3{[(72b+8e)*3+30e]*3+81e} n “Pacman” bunches: do not encounter bunches of the other beam in one or several parasitic collision points n “Superpacman” bunches: as “pacman” but not even at the collision point

15 Filling scheme

16 Horizontal orbit offsets Horizontal offset at IP1, in IP8 the situation is similar, need to scale so that the spread 1/10 of the beam size Zooming up Effects coming from the very start of train where there is a “big hole” Effects coming from the “small holes”

17 Collision scheme n IP8 shifted by 3 half buckets which means 124 extra superpacman bunches in IP8 n Double bunch spacing no encounters in IP8 n Triple spacing means less luminosity (bunch current has to be increased by 3 1/2 to keep luminosity constant) Bunch offsets within  at collision point, small effects IP8

18 Longitudinal Impedance n Longitudinal impedance can cause longitudinal instabilities of the beam n The geometry of an element is crucial n All elements in the machine are optimized to give a minimum contribution to the impedance budget. n Longitudinal impedance budget is very tight n No feedback system in the LHC for longitudinal instabilities n A longitudinal feedback system is technically very difficult and expensive n The evaluation of the LHCb experimental beam pipe longitudinal impedance is done by Nikhef. Has to fit into total budget of the LHC! Examples of critical geometries Sharp edges not good

19 Transverse Impedance n A transverse feedback system is required in the LHC to cure the effect of transverse impedance (resistive wall instability). n Aluminum, copper and beryllium are good materials (stainless steel not so good). n Transverse impedance should not exceed budget because of emittance conservation (feedback capabilities are limited)

20 Higher Order Modes n Depends on the geometry of the object n Frequencey spectrum of loss factor should not overlap, bunch spectrum n Different positioning of the vertex detector gives different resonance conditions n All positions of the detector have to be evaluated n Heating up change resonance conditions, cooling down etc. Pumping effect. Different situations should be carefully evaluated

21 Electron Cloud n Photons, protons, electrons from gas ionization n Critical dimensions of chamber n Heat Load n Vacuum

22 Electron Cloud Scale different SEY=1.2 Boxes open, xb=12cm, yb=3cm SEY=2.8 Boxes closed, xb=6mm, yb=6mm

23 Official Schedule n First Beam 01/02/2006 First Collisions 01/04/2006 L  *=0.5 = cm -2 s -1 n Shut Down 01/05-31/07/2006 Physics Run 01/08/ /02/2007 L  *=0.5 >= cm -2 s -1

24 People who Contributed n Optics: Oliver Brüning n Crossing Scheme: Werner Herr, Oliver Brüning n Electron Cloud: Frank Zimmermann, Oliver Brüning n Impedance: Daniel Brandt, Oliver Brüning n Lattice files: Elena Wildner n Aperture: Bernard Jeanneret n Beam-Beam: H.Grote

25 LHC general parameters

26 Transverse Parameters

27 Longitudinal Parameters