Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop 26-28 February 2007, Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
ERLP / ALICE: a bit of history Yuri Saveliev. ... how all this started SRS DIAMOND ERLP 4GLS... to greener pastures.... Oh yes ! We get there Hmmmm.
Advertisements

Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ALICE : Superconductive Energy Recovery Linac (ERL)
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Bruno Muratori STFC, Daresbury Laboratory Commissioning EMMA 02/07/09 PRISM workshop – Imperial College.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Modelling of the ALICE Injector Julian McKenzie ASTeC STFC Daresbury Laboratory IOP Particle Accelerators and Beams Group Status and Challenges of Simulation.
ALICE Commissioning Part II : Injector Yuri Saveliev Seminar on 14-15/07/2008 Gun to Booster Booster to FCUP-01 The rest of the Injector.
Transverse emittance Two different techniques were used to measure the transverse emittance. The multislit mask in the injector 9 MeV Quadrupole scan for.
Low Emittance RF Gun Developments for PAL-XFEL
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
1 ALICE and EMMA Yuri Saveliev … and many others at DL and beyond ASTeC, STFC Daresbury Laboratory IOP Particle Accelerators and Beams Annual Conference.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Christopher Gerth DL/RAL Joint Workshop 28-29/4/04 Modelling of the ERLP injector system Christopher Gerth ASTeC, Daresbury Laboratory.
Electron Source Design Dr Tim Noakes ASTeC, STFC Daresbury Laboratory.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
An Electron source for PERLE
Beam Commissioning Adam Bartnik.
EAAC, Isola d’Elba, September 2017, WG1
Feng Zhou LCLS-II AP meeting 02/23/2017
Sara Thorin, MAX IV Laboratory
Have a chance to operate your own beam at CERN
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
DC Injector and Space Charge Simulation Status
17/10/2016 Reserch Activity Report 6D Phase Space Electron Beam Analysis And Optimization For Rf Linac Based Inverse Compton Scattering Radiation Sources.
Experimental Overview
Thermal emittance measurement Gun Spectrometer
Magnetized Bunched Electron Beam from DC High Voltage Photogun
The Cornell High Brightness Injector
Cornell Injector Performance
Magnetized Electron Beam for Ion Cooling at JLEIC
Injector: What is needed to improve the beam quality?
R. Suleiman and M. Poelker October 12, 2018
R. Suleiman and M. Poelker September 29, 2016
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Injector Commissioning C
Selected simulations for XFEL photo injector
Linac/BC1 Commissioning P
VELA – CLARA AP (Draft) Goals Software Goals
High Level Physics Applications for LCLS Commissioning
Modified Beam Parameter Range
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
LCLS Commissioning Parameters
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Injector for the Electron Cooler
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory

ERLP Injector parameters DC gun voltage 350kV Bunch charge 0-80pC Bunch repetition frequency81.25Mhz Train length  s Train PRF1-20Hz Average current in train 6.5mA 80pC) Laser pulse duration ~6ps (~25ps with pulse stretcher) Laser pulse energy 0-40nJ Laser spot position on cathodevariable Laser beam diameter on cathode 2-6mm FWHM (variable) Buncher input RF power ~2kW (~70kV peak voltage) RF kicker power ~200W

ERLP diagnostic beamline

ERLP Diagnostic beamline schematic NOTES:1) Section “B” position coincides with the position of the 1 st cell of booster 2) Everything downstream SOL-02 will be replaced by the booster

Diagnostic beamline: what we can measure Bunch charge(Faraday cup) Electron energy (HV PSU voltage] Laser beam position/size on cathode (direct viewing, virtual cathode) Cathode QE (QE scanner, FC) Beam steering (YAGs, BPM) Transverse beam size and profile(YAGs) Transverse emittance (V & H slits, pepper pot, YAGs, FC) [both X and Y; transverse phase space] Energy spread / spectrum(dipole, YAG, slit, FC-02) [with buncher – correlated and uncorrelated energy spread] Bunch length / longitudinal profile(RF transverse kicker, YAG) [longitudinal phase space]

Diagnostic beamline: what we need to do Strategic goals: - gun characterisation at various bunch charges Q; - gun optimisation at Q=80pC (or the highest Q available) needed for:(i) matching computer simulations and experiment; (ii) projecting the injector behaviour to nominal bunch charge Beam related tasks … - HV gun electrodes conditioning proper (done; 450kV) - laser pulse stretcher (done; ~25ps) - good laser transverse shape without the pinhole - QE >1% (done; =1.2%) - cathode lifetime - BPM, buncher and RF kicker characterisation (started) - ………

Diagnostic beamline: what we need to do Beam studies - beam steering/focusing at high Q - beam halo (if any) - solenoid scans (var Q) - transverse emittance at buncher and 1 st booster cell (var Q) - energy spread (correlated/uncorrelated) (var Q) - bunch length and longitudinal profile (var Q) - optimal settings for Q=80pC (or the highest available) Also … - keep an eye on QE and the cathode lifetime - effect of buncher operation on QE - optimisation of laser beam size (time permitted; unlikely though …)

Commissioning problems Period 1 (21 July – 5 October, 2006) - conditioning resistor failure - gun not conditioned properly for 350kV operation - gun instability in kV range of voltages - low and rapidly deteriorating QE (~0.5% max and ~0.1% most of the time) - gun vacuum/current leakage problems after one of the cathode activations beam studies: ~1 week at 250keV and ~1 week at 350keV Period 2 (7 January – 3 February, 2007) - strong field emission from the cathode (due to new wafer ?) - rapidly deteriorating QE (although high initially >1%) - highly non-uniform QE map (due to wafer heating problems) - mechanical failure inside the cathode ball (flap) beam studies: <2 weeks at <350keV

Quantum efficiency, bunch charge, lifetime Quantum efficiency: - maximum registered (machine): QE=1.2% - on a stand-alone test system, QE=3.5% has been achieved Bunch charge: - maximum registered: Q=9pC (with pinhole) Cathode lifetime: -no solid data yet, but the lifetime is not good enough anyway (field emission)

Dipole calibration Calibration made at 250keV because of Voltage instability at nominal 350keV Sensitivity with YAG-03 (Section D): 1.13mm/keV Scaling to other energies: Scaled to 350keV, the sensitivity is: 0.85mm/keV (Note: theory gives 0.86mm/keV)

Beam steering Beam steering is far from intuitive because of solenoids Solenoids: - Strong correctors :f=24cm at 300G => ~40mrad kick (!) at ~10mm offset - Rotate the beam by ~45 o (at ~300G field)

Transverse emittance 350keV; Slit HSLT-01 (“B”) and screen “C” laser spot diameter = 5.2mm (approximately ±2σ) Q=0.16pC ε = 0.9 mm.mrad (normalised) Q=0.06pC ε = 0.8 mm.mrad (normalised) But: both are overestimated due to image saturation !!!

Energy spread Only first rough estimates yet … At 300keV; Q<3pC :  E <0.5keV

Bunch length “Non-conventional” technique (use of dipole and buncher) Bunch length estimated to be ~23ps (full bunch length) at low bunch charges

ERLP diagnostics schematic

ERLP diagnostics: Gun to Booster Slit Vertical

ERLP diagnostics: Booster to Linac Twiss parameters Emittance Slit here ? Energy spread/spectrum Absolute energy Buncher gradient / phase(?) setting Bunch charge Setting achromatic condition (Q01-Q05) Twiss parameters Energy spread Setting achromatic condition (Q10, Q12)

ERLP diagnostics: Linac to Arc 1 Twiss parameters Emittance Dispersion correction Slit here ? Energy spread/spectrum Absolute energy Bunch charge (?)