L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch.

Slides:



Advertisements
Similar presentations
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
Advertisements

Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Carbon Injector for FFAG
ESS DTL beam commissioning
Beam Dynamics Layout of the FAIR Proton Injector Gianluigi Clemente, Lars Groening GSI, Darmstadt, Germany Urlich Ratzinger, R.Tiede, H.Podlech University.
FFAG-ERIT Accelerator (NEDO project) 17/04/07 Kota Okabe (Fukui Univ.) for FFAG-DDS group.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
REFERENCES [1] C.Y. Tan, FNAL Beams-doc-3646-v16, 2011 [2] V.N. Aseev, TRACK, the beam dynamics code, PAC05 [3] S. Kurennoy, LA-UR TRANSMISSION.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
The Development of the Bunch Length Detector (BLD) KIM Joon Yeon, KIM Do Gyun, BHANG Hyoung Chan, KIM Jong Won 1, YUN Chong Cheoul 2 Seoul National University,
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
FFAG-Workshop Dec Kumatori Japan Diagnostics for FFAG- accelerator Takahisa ITAHASHI Department of Physics, Osaka Univ. Toyonaka, Osaka, ,Japan.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities P. Forck, T. Giacomini,
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
IPM EM Simulations 9 th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators April.
RF source, volume and caesiated extraction simulations (e-dump)
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities Peter Forck, JUAS.
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities Peter Forck (GSI),
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
6 July 2010 | TU Darmstadt | Fachbereich 18 | Institut Theorie Elektromagnetischer Felder | Sabrina Appel | 1 Micro bunch evolution and „turbulent beams“
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
In-pulse-average: Search for multiples of t rf and t DAQ which “coincide”: 1891 t DAQ = ns ~ =41 t rf Calculate sample mean over blocks of.
ESS | Non-Invasive Beam Profile Measurements| | C. Böhme Non-Invasive Beam Profile Measurement Overview of evaluated methods.
ESS Front End diagnostic
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities P. Forck: et al:
ESS Workshop “Bunch Shape Measurements” Bunch Length Detector Based on X-Ray Produced Photoelectrons Peter Ostroumov February 11, 2013.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
IPM Simulations at Fermilab 3-4 March 2016 Randy Thurman-Keup.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
EUROTeV Diagnostics WP5
NICA injection complex status
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
S.M. Polozov & Ko., NRNU MEPhI
HIAF Electron Cooling System &
Progress in the Multi-Ion Injector Linac Design
Andrei Shishlo ORNL SNS Project Florence, Italy November 2015
Beam-beam effects in eRHIC and MeRHIC
Physics design on Injector-1 RFQ
LINAC 4 source & LEBT measurement results
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
commissioning and measurements
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Multi-Ion Injector Linac Design – Progress Summary
Pulsed electron beam cooling experiments: data & preliminary results
Presentation transcript:

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 1 A Bunch Shape Monitor for high current LINACs B. Zwicker, P. Forck, P. Kowina, C. Dorn Gesellschaft für Schwerionenforschung GSI, Darmstadt Bunch Shape Workshop, Lund, February 11 th 2013

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 2 Overview High current LINACs at GSI and FAIR Motive for a BSM Non-intercepting Bunch Shape Monitor Performance and Problems Outlook

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 3 UNILAC Beam Transport SIS18 High Current LINACS UNILAC accelerates various ions (p - U) RF 36 MHz or 108 MHz E kin up to 11.4 MeV/u Rep. Rate 50 Hz Pulse length max. 5 ms Max. 20 mA current (pulsed) Low beta < 0.16

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 4 p-LINAC primary injector for SIS 100 RF 352 MHz E kin up to 70 MeV Rep. Rate 5 Hz Pules length 0.1 ms High currents up to 70 mA beta < 0.38 p-LINAC SIS18 SIS 100 SourceRFQCH-DTL 60 m 70 MeV 3 MeV95 keV to SIS18 Re-Buncher High Current LINACs

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 5 Motive for a BSM UNILAC For optimal matching of the different UNILAC sections the bunch profile should be known (partly KONUS) Experience how to reach high performance helps, too Several times non-gaussian profiles have been observed p-LINAC The p-LINAC operates up to 70 MeV with a compact not common design (KONUS) Due to KONUS beam dynamics, the logitudianal bunch profile is very crucial Simulation failures far less tolerable

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 6 Motive A tungsten wire will melt (3695 K) or even vaporize (11.4 MeV/u, U 73+, I = 2mA, f= 5Hz)

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 7 Motive A tungsten wire will melt (3695 K) or even vaporize A carbon (3750 K) wire shows similar behavior Work function determinates temperature (Thermionic Emission) (11.4 MeV/u, U 73+, I = 2mA, f= 5Hz)

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 8 Motive A tungsten wire will melt (3695 K) or even vaporize A carbon (3750 K) wire shows similar behavior Work function determinates temperature (Thermionic Emission) (11.4 MeV/u, U 73+, I = 2mA, f= 5Hz) Therefore the non-intercepting Bunch Shape Monitor with residual gas has been developed at GSI

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 9 Non-intercepting Bunch Shape Monitor BSM Schema Residual gas works as secondary electron source SE are extracted with 30 kV through a slit An energy sensitive analyser ensures usage of SE created by the bunch An rf-deflector transforms the time information (time of flight) in a spatial distribution Readout by MCP + Phosphor + CCD

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 10 The E-field box : E-field box E-field up to -30 kV Field forming side electrodes → 430 V/mm High field for fast extraction Non-intercepting Bunch Shape Monitor

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 11 The E-field and analyzer: Energy analyzer for source volume restriction: Radius ρ=30 mm, 90 0 bending, ±5.5 kV Remote controlled aperture: 0.1 to 2 mm point-to-point focusing for ±0.25mm and ±0.5mm aperture (remote cont.) ⇒ ±0.2 mm vert. prolongation, comparable to wire Non-intercepting Bunch Shape Monitor

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 12 f0f0 36 MHz108 MHz length800 mm P max 100 W30 W Q0Q t max 6 ms α max Common U Σ < 7 kV as einzel lens Different U Δ < 1 kV as steerer length 18 cm Non-intercepting Bunch Shape Monitor electron beam electron beam Rf-deflector The rf-deflector produced by INR Troitzk: Parallel wire λ/4-resonator:

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 13 Image devices Micro Channel Plate amplifies incoming electrons Picture taken by a CCD-Camera shows spatial distribution Pseudocolors give high contrast 200 mm Non-intercepting Bunch Shape Monitor MCP Ø70mm suppression grid MCP CCD- Camera 70 mm dV

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 14 Phase calibration In order to determ the time width of the profile a phase calibration has to be done At least two measurements have to be executed with a different phase of the rf-amplitude By knowing the exact delay and by measuring the displacement one obtains the span corresponding to one pixel Valid only in the strict linear range of the sine function 61 pixel Exp: A delay of ps and a displacement of 61 points leads to 9.18 ps / pixel Non-intercepting Bunch Shape Monitor

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 15 Non-intercepting Bunch Shape Monitor CCD-Camera Beamtube rf-deflector MCP E-Fieldbox Analyser 1 m

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 16 Performance and Problems 16 pixel Profile Resolution Min electrostatic lens (rf-deflector) focus about 16 pixel Depending on the rf-deflector amplitude a resolution of 144 ps has been achieved ( 9.2 ps/pixel at 36 MHz, corresponding 2° phase resolution) Usage of new apertures control should further improve the resolution For higher frequencies resolution should increase in the absolute value

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 17 Performance and Problems Beam parameters: U 28+, I = 200 μA, T= 180 μs Projection of spatial distribution provides the bunch profile (averaged over 64 pulses) Through the given rf-deflector amplitude the picture resolution is up to 9.6 ps / pixel projection spatial distribution projection 780 ps

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 18 Performance and Problems Single gap resonator Proof of principle: To confirm the validity of the obtained profile it is recommended to change the bunch profile in a well- known manner By using the single gap resonators one can be pretty sure whether the bunch is stretched or focused If the BSM is working it should be sensitive for the bunch manipulations

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs ps normal 440 ps bunched debunched 480 ps Performance and Problems Proof of principle: The BSM was able to measure profiles from normal to focus and finally stretched under equal conditions (parameters: U 36+, I = 100 μA, T= 180 μs, but non-constant rf-amplitude) W = 28 dBmW = 29 dBm W = 18 dBm

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 20 Performance and Problems Strong background, poor contrast for grey values Poor peak-to-noise ratio complicates data acquisition and limits resolution (where starts the actual signal?) low rf-power high rf-power

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 21 Performance and Problems Through subtracting a background-only picture from the pictures a detailed profile can be obtained time in ns High Background Low Background substracted original

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 22 Performance and Problems Signal quality behaves not as expected with the parameters Lower MCP voltage seems to improve the quality (saturation?) Higher difference between Phosphor and MCP also improves the quality original 4000 Peak-to-noise ratio Phosphor voltage ín V MCP in V

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 23 Performance and Problems The E-field created by space charge causes signal distortion due to additional momentum of the SE (image distortion)

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 24 Emittance Determination from Bunch Shape Monitor Variation of buncher: Bunch shape was determined, modified by a buncher Pick-up: No measurable influence Emittance determination possible Beam parameters: Ni 14+ at 11.4 MeV/u I=2 emA, 200 μs macro pulse Average: 4 macro pulses Pressure p=10 -5 mbar (no significant beam influence)

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 25 Performance and Problems Small beam currents show only a moderate effect High currents strongly influence the obtained profile

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 26 Outlook Commissioning BSM at UNILAC (done) Gain experience to improve overall performance Understand and eliminate disturbance und background Improve resolution (new aperture control, higher contrast, less image distortion) Evaluate BSM and give a reference for the p-LINAC

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 27 Conclusion LINAC performance depends on the bunch profile High current LINACs need a non-destructive device Several different profiles with a phase resolution up to 2° has been obtained BSM has not well understood background and image distortion Simulations and further investigations will take place

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 28 Thank You!

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 29 Performance and Problems High current measurement (2 mA) for U 73+ Steering by different voltage of rf-plates Steering does not affect background MCP might be saturated

L. Groening, Sept. 15th, 2003 GSI-Palaver, Dec. 10 th, 2003, A dedicated proton accelerator for p-physics at the future GSI facilities B. Zwicker, Bunch Shape Workshop, Lund Feb. 11 th 2013 A longitudinal Bunch Shape Monitor for high current LINACs 30 Performance and Problems