1 2008 6/18 Yasuaki Ushio Hiroshima University The result of cavity compton experiment.

Slides:



Advertisements
Similar presentations
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Advertisements

A_RD_01 Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay French Labs. :
Abstract First phase A step-tunable external cavity laser with two Fabry-Pérot etalon filters is demonstrated. The angle of one etalon induces a step-tuning.
Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators.
Status of g ray generation at KEK-ATF ► Introduction ► Status of the cavity R&D ► Out Look French Labs. : LAL (Orsay) in Collaboration with CELIA (Laser.
Scint. Al Internal reflection External reflection ↑ ↑ ↑ Decay Detector Development for Giant Resonance Studies By: Gus Olson Mentor: Dr. D.H.Youngblood.
Lecture 38 Lasers Final Exam next week. LASER L ight A mplification by S timulated E mission of R adiation.
Status of g ray generation at KEK-ATF ► Introduction ► Status of the cavity R&D ► Out Look French Labs. : LAL (Orsay) in Collaboration with CELIA (Laser.
Polarization-preserving of laser beam in Fabry Perot Cavity Accelerator center, IHEP Li Xiaoping.
Installation of a Four-mirror Fabry-Perot cavity at ATF 1.Our setup/goal 2.Why 4 mirrors ? 3.The ATF 4-mirror cavity 4.The optical scheme 5.The laser/cavity.
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
Status of R&D of Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Out Look KEK, Hiroshima University LAL (Orsay) in Collaboration withCELIA.
Compton Status ►Introduction ►Recent activities ►Out Look Tohru Takahashi Hiroshima University May AWLC2014.
Update of R&D Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Recent activities ►Out Look KEK, Hiroshima University LAL (Orsay) in.
Status of R&D of Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Out Look KEK, Hiroshima University LAL (Orsay) in Collaboration withCELIA.
IPBSM status and plan ATF project meeting M.Oroku.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Feedback R&D for Optical Cavity Ryuta TANAKA (Hiroshima univ.) 19 th Feb 2013 SAPPHiRE DAY.
T.Takahashi Hiroshima γγ state of the art and research plan, what system tests can be done at ATF2, ESA T.Takahashi Hiroshima Univ. March GDE BDS/ACFA.
Possibilities of TOF measurements on NPI neutron generators Mitja Majerle Department of Nuclear Reactions Nuclear Physics Institute ASCR.
Status of the optical cavity R&D at ATF IWLC2010 Geneva 20-October-2010 T.Takahashi Hiroshima University for collaborators.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Status and Plan of Compton  -ray Generation at KEK-ATF Japanese Labs. : KEK, ATF group, Hiroshima University Tsunehiko OMORI (KEK) for 13 February 2014.
Compton Experiment at ATF LCWS10 28-March-2010 T. Takahashi (Hiroshima) / T. Omori (KEK) for collaborators.
Itoh Lab. M1 Masataka YASUDA
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
Itoh Laboratory Masataka Yasuda
PULSE LASER WIRE Laser pulse storage in an optical cavity as a beam monitor & an X-ray source Kaori Takezawa Kyoto Univ. 2nd Mini-Workshop on Nano Project.
MEG Run 2008 液体キセノンガンマ線検出器 東京大学 素粒子物理国際研究セン ター 西村 康宏、 他 MEG コラボレー ション 2008 年秋季物理学会@山形大学小白川キャンパス.
1.Stable radiation source 2.Wavelength selector 3.Transparent sample holder: cells/curvettes made of suitable material (Table 7- 2) 4.Radiation detector.
X-RAY LIGHT SOURCE BY INVERSE COMPTON SCATTERING OF CSR FLS Mar. 6 Miho Shimada High Energy Research Accelerator Organization, KEK.
T.Takahashi Hiroshima Optical Cavity R&D for Photon Colliders T.Takahashi Hiroshima Univ. 26 May 2008 NanoBeam 2008.
T.Takahashi Hiroshima Optical Cavity R&D around KEK-ATF T.Takahashi Hiroshima Univ. Nov LCWS08 at Chicago.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
27 Mar 2006 Kentaro MIKI for the PHENIX collaboration University of Tsukuba The Physical Society of Japan 61th Annual Meeting.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
T. Suehara, H. Yoda, T. Sanuki, Univ. of Tokyo, T. Kume, Y. Honda, T. Tauchi, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Status of ATF Fast Kicker Experiment
Numerical and experimental study of the mode tuning technique effects. Application to the cavity ring-down spectroscopy. J. Remy, G.M.W. Kroesen, W.W.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
T.Takahashi Hiroshima Photon Collider testbed at ATF2 ~a possible plan~ T.Takahashi Hiroshima Univ. May ATF2 meeting.
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
Compton Experiment at ATF DR 2009 Summary and Plan ATF2 Project Meeting 15-Dec-2009 T. Omori (KEK) for collaborators.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
SPring-8 レーザー電子光 ビームラインでの タギング検出器の性能評価 核物理研究センター 三部 勉 LEPS collaboration 日本物理学会 近畿大学 1.レーザー電子光 2.タギング検出器 3.実験セットアップ 4.エネルギー分解能 5.検出効率とバックグラウンドレート.
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
MEG 実験 2009 液体キセノン検出器の性能 II 西村康宏, 他 MEG コラボレーション 東京大学素粒子物理国際研究セン ター 第 65 回年次大会 岡山大学.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
AFAD 2014 Synchrotron Status of Compact X-ray Source at LUCX Kazuyuki Sakaue Waseda University Laser Undulator Compact X-ray source.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Update of R&D Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Recent activities ►Out Look KEK, Hiroshima University LAL (Orsay) in.
–11.03 Hawaii Multi bunch acceleration on LUCX system Ⅰ. LUCX project Ⅱ. Simulation results for Compton scattering Ⅲ. Calculation on beam loading.
1 Opto-Acoustic Imaging 台大電機系李百祺. 2 Conventional Ultrasonic Imaging Spatial resolution is mainly determined by frequency. Fabrication of high frequency.
UNIT-3 ADVANCES IN METROLOGY
Pol. positron generation scheme for ILC
ATF Intrabeam Scattering Results
Development of Optical Resonant Cavities for laser-Compton Scattering
Multi banch generation Experiment at ATF
Laboratory of High-Power & Semiconductor Lasers
R&D of Freedback-Free Optical Resonant Cavity
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Status and plans for crab crossing studies at JLEIC
Presentation transcript:

/18 Yasuaki Ushio Hiroshima University The result of cavity compton experiment

2 Contents Set up at KEK – ATF Procedure of measurement Result of the experiment Summary

3 Set up at KEK-ATF 1 Optical cavity slit aperture ~0.26mrad e - e - beam 15.6m   detector set up   ray In our set up, the minimum solid angle of gamma to be detected was determined to this slit aperture 0.26mrad. This value determined to one of gamma minimum energy. A gamma energy was from 16MeV to 28MeV.

4 Set up at KEK-ATF 2  ray Pure CsI scintillator lead shield  15mm UV-pass filter light guide PMT UV-pass filter : Only pass the ultraviolet light. Pure CsI : The maximum emission wavelength : 315nm Emission decay time : 10-16ns Emission decay time is enough to be faster than the data taking time and electron frequency. electron frequency : 2.16MHz ~ 463 nsdata taking time : 100ns 300mm slit aperture ~0.26mrad ee --   detector set up   ray beam

5 Set up at KEK-ATF 3 accuracy ~ 0.8  m electron beam Horizontal Vertical Optical cavity Cavity position is moved

6 The appearance of light resonance signal Reflected light Transmitted light In this time, the optical cavity was resonated state Transmitted light Mirror reflectivity : 99.6% Mode locked laser (Photo diode) PD time (ms) Continued to change the length of the external cavity. 1ms

7 DAQ Schematic Continued to change the length of the external cavity. Only picked up the data when the cavity was resonated. 2.16MHz - e cavity Could pass Comparator Gate was opened for 100ns. T = 463ns PD

8 Procedure of measurement 1 ① Vertical scan Scanning to the laser vertical position and find the best position to observe gamma Vertical scan ② Horizontal scan Vertical was fixed to the best position. Scanning to the Horizontal. Moved accuracy ~ 0.8  m movable table See from upper direction. At horizontal, cavity was leaned at 12 degree Z e - e - When Vertical scan, Moved the cavity to Z direction Z

9 Procedure of measurement 2 We found the best collision point ③ Timing scan Vertical and Horizontal were fixed to the best position. And turned on the switch of phase locked loop. After that scanning phase. Timing scan - e beam 420mm T=2.8ns pulsed laser beam e -

10 Gamma Energy distribution 1 In calculation, the peak energy of a gamma is about 28MeV.In our set up, the acceptance of detector was 0.26mrad. One of gamma had 16~28 MeV energy. Our set up detected a lot of gamma at one time. So we estimated the number of gamma at the place of detector. detected in experiment 15.6m cavity slit aperture 0.26mrad  ray detector

11 Gamma Energy distribution 2 This graph shows the appearance of gamma energy distribution. one of gamma had 16~28 MeV energy. 1 gamma 2 gamma

12 The number of gamma 1 bunch : experiment  ~3.3 simulated by CAIN   ~ bunches : experiment  ~3.1 simulated by CAIN  ~ 20 In the case of 1 bunch, the number of gamma seems to consist comparing our experiment data with estimate by CAIN. However, the data of 20bunches were inconsistent.The reason of this,there was a possibility that not every electron bunches were collided. We estimated the number of gamma to use a simulation software “CAIN”. bunch distance : 2.8 ns Mirror reflectivity : 99.6% transmitted power stack power=

13 Summary ・ The data of 1 bunch appears to be consistent with simulation data by CAIN. ・ We observed the number of gamma about 3.3 per collision. ・ The data of multi bunch mode was inconsistent.There was a possibility that not every electron bunches were collided. ・ The optical cavity length will be fixed at a condition of synchronization with electron cycle. And will be detected to the largest number of gamma in our set up. Next Plan

14

15

16 Set up at KEK-ATF 1-R Mode lock laser Electron beamCSI γray e beam PD Transmitted light was detected 16~28MeV We could observe how stored it was. 420mm Collision angle 12 degree Mirror curvature : 210.5mm λ:1064nm Output : 28nJ/pulse=10W Distance of per pulse : 2.8ns = electron bunch distance (Internal cavity length : 420mm) Pulse length : 7ps Rate of reflection : 99.6% πR F = Finess By calculation F = 780 σ= 30 μm Mode lock laser

17 The number of gamma When we estimate the laser power in the cavity, we should use the data from transmitted light. Since the stack power estimate by input was considered inaccuracy. 1 bunch : γ~3.3 simulated by cain γ~ bunch : γ~3.1 simulated by cain γ ~ 20 We estimated the number of gamma to use a simulation software “cain”.

18 Set up at KEK-ATF 2  ray Pure CsI scintillator lead shield  15mm UV-pass filter light guide PMT UV-pass filter : Only pass the rapid time reaction element. Pure CsI : The maximum emission wavelength is about 305nm. The rapid time reaction element was enough to be faster than data taking time and electron frequency. electron frequency : 2.16MHz ~ 463 nsdata taking time : 100ns 300mm slit aperture ~0.26mrad ee --   detector set up   ray beam

レーザーと光学系 共振器長 420mm 圧電素子でミラーの 光軸方向の位置を変化 衝突角 12 度 透過光強度を検出 → 共振のモニター 反射率 99.6%

光学セットアップ