16th December 2003 G. Blair, RHUL1 The Laser System at PETRA Wire G. A. Blair, Royal Holloway Univ. London ACFA Workshop, Mumbai 16 th December 2003 Accelerator-Related.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
LC-ABD P.J. Phillips, W.A. Gillespie (University of Dundee) S. P. Jamison (ASTeC, Daresbury Laboratory) A.M. Macleod (University of Abertay) Collaborators.
1 Electron Beam Polarimetry for EIC/eRHIC W. Lorenzon (Michigan) Introduction Polarimetry at HERA Lessons learned from HERA Polarimetry at EIC.
28th January 2004 G. Blair, RHUL1 Laser-wire Update G. A. Blair, Royal Holloway Univ. London LCUK, Oxford 28 th January 2004 Motivation for the projectMotivation.
Latest laser-wire results ● How does a Laser-Wire work? ● Latest ATF results ● Focusing optics ● Latest PETRA results University of Oxford: Nicolas Delerue,
Bunch Length Measurements at the Swiss Light Source (SLS) Linac at the PSI using Electro-Optical Sampling A.Winter, Aachen University and DESY Miniworkshop.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
IPBSM status and plan ATF project meeting M.Oroku.
Laser based Emittance Measurement for LINAC4 Project Overview & Current Status T. Hofmann, E. Bravin, U. Raich, F. Roncarolo, F.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
CLIC Workshop 07 CERN, October 2007 Instrumentation Working Group In conference room Bldg Grahame Blair & Thibaut Lefevre.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Laser Wire: :LBPM G A Blair EUROTeV Scientific Workshop, Uppsala 27 th August 2008 Introduction Emittance extraction Experimental programme Laser R&D Summary.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF LBBD-collaboration Laserwire update Adams Institute (Oxford/Royal Holloway) G.
1 The Longitudinal Polarimeter at HERA Electron Polarization at HERA Laser System & Calorimeter Statistical and Systematic Precision Laser Cavity Project.
Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.
8th January 2004 G. Blair, RHUL1 The Laser System at PETRA Wire G. A. Blair, Royal Holloway Univ. London ALCPG Workshop, SLAC 8 th January 2004 Systems+Instrumentation.
Development of a Gamma-Ray Beam Profile Monitor for the High-Intensity Gamma-Ray Source Thomas Regier, Department of Physics and Engineering Physics University.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
PULSE LASER WIRE Laser pulse storage in an optical cavity as a beam monitor & an X-ray source Kaori Takezawa Kyoto Univ. 2nd Mini-Workshop on Nano Project.
Coherent Diffraction Radiation experiment Konstantin Lekomtsev, Grahame Blair, Gary Boorman, Pavel Karataev, Maximilian Micheler John Adams Institute at.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
W. LorenzonEIC, 8 November The Longitudinal Polarimeter at HERA W. Lorenzon (Michigan) Collaboration Polarization at HERA Laser System & Calorimeter.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
Workshop for advanced THz and Compton X-ray generation
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
L ASER - WIRE U PDATE Commissioning of the PETRA3 Laser-wire Summary of first ATF-ext laser-wire Installation of ATF2 laser wire Grahame Blair CLIC Technical.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
3rd September 2004 G. Blair, RHUL1 Laser Wire Update G. A. Blair Royal Holloway Univ. London ECFA LC Workshop Durham 2 nd September 2004 Laser-wire at.
What did we learn from TTF1 FEL? P. Castro (DESY).
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
at Royal Holloway Univ. London
Testbeam plans for LEP instrumentation
Plans for Laser-wire System Grahame Blair 30th May 2005
Laserwire: high resolution non-invasive beam profiling
Beam Size Monitor Model
Laser-wire Measurement Precision
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

16th December 2003 G. Blair, RHUL1 The Laser System at PETRA Wire G. A. Blair, Royal Holloway Univ. London ACFA Workshop, Mumbai 16 th December 2003 Accelerator-Related Session Motivation for the projectMotivation for the project Laserwire at PETRALaserwire at PETRA -Environment at PETRA -Installation of Hardware -First measurements Conclusions and OutlookConclusions and Outlook

16th December 2003 G. Blair, RHUL2 Motivation Maximise Luminosity performance of Linear ColliderMaximise Luminosity performance of Linear Collider Control of transverse beam size and emittance in the Beam Delivery System (BDS) and at the Interaction Point (IP)Control of transverse beam size and emittance in the Beam Delivery System (BDS) and at the Interaction Point (IP) Conventional techniques (wirescanner) at their operational limitConventional techniques (wirescanner) at their operational limit Development of standard diagnostic tool for LC and LC Test Facility operation based on optical scattering structures  Laserwire, Laser-InterferometerDevelopment of standard diagnostic tool for LC and LC Test Facility operation based on optical scattering structures  Laserwire, Laser-Interferometer FeaturesFeatures -Resolution error smaller than 10% -Fast (intra-train) scanning -Non-destructive for electron beam -Resistant to high power electron beam

16th December 2003 G. Blair, RHUL3 Trans.+Long. Profiles Trans:  m Long: ~200  m Trans: nm

16th December 2003 G. Blair, RHUL4 LC Layout and Parameters CLICNLC/GLCTESLABDS  x / m  y / m 3.4 to to to 50 1 to 5 20 to to 25 IP  x / n m  y / n m

16th December 2003 G. Blair, RHUL5 Optical Scattering Structures Scanning of finely focused laser beam through electron beam Detection of Compton photons (or degraded electrons) as function of relative laser beam position Challenges -Produce scattering structure smaller than beam size -Provide fast scanning mechanism -Achieve efficient signal detection / background suppression

16th December 2003 G. Blair, RHUL6 Laserwire for PETRA Energy Bunch Length Charge/bunch Hor. beam size Ver. beam size E/GeV  z /ps nC  x /m  y /m 4.5 to 12 ~100 1 to to 100 ~100 Positron Electron Tandem Ring Accelerator Injector for HERA, upgrade to synchrotron light source  Long free straight section  Easy installation of hardware due to existing access pipe and hut outside tunnel area Q-switch Nd:YAG with SHG From CERN LEP polarimeter  Trans Mode: large M 2 ~9  Long Mode: stability ± 20%, beating  ps substructure  Homegrown timing unit for external triggeringWavelengthEnergyPulselengthReprate Beam size Divergencel/nmE/mJdt/ns f rep /Hz  x,y /mm /mrad 1064/532250/901030~70.7 Laser parameter PETRA parameter

16th December 2003 G. Blair, RHUL7 Laserwire for PETRA

16th December 2003 G. Blair, RHUL8 Signal and Backgrounds Signal: Compton scatteringSignal: Compton scattering Background sources:Background sources: -Synchrotron radiation -Cosmic rays -Bremsstrahlung Simulation with Geant4 plusSimulation with Geant4 plus tool kits with realistic setup tool kits with realistic setup

16th December 2003 G. Blair, RHUL9 Setup at PETRA

16th December 2003 G. Blair, RHUL10 Installation at PETRA

16th December 2003 G. Blair, RHUL11 Installation at PETRA

16th December 2003 G. Blair, RHUL12 Lab Measurements at RHUL

16th December 2003 G. Blair, RHUL13 Installation at PETRA

16th December 2003 G. Blair, RHUL14 Detector Requirements for detector materialRequirements for detector material -short decay time (avoid pile up) -short radiation length -small Moliere radius Cuboid detector crystals made of PbWO4Cuboid detector crystals made of PbWO4 3x3 matrix of 18x18x150 mm crystals3x3 matrix of 18x18x150 mm crystals Energy resolution better than 5%Energy resolution better than 5%

16th December 2003 G. Blair, RHUL15 Detector Calibration Detector studies with DESY II testbeamDetector studies with DESY II testbeam Beamline with electrons with energy from 450 MeV to 6 GeVBeamline with electrons with energy from 450 MeV to 6 GeV Ten detector crystals were calibrated using a single PMTTen detector crystals were calibrated using a single PMT Combination of nine crystals in matrixCombination of nine crystals in matrix ResolutionResolution -High intrinsic resolution -Full matrix less good

16th December 2003 G. Blair, RHUL16 First Photons Laser onLaser off Photodiode at IP Q-switch Calorimeter

16th December 2003 G. Blair, RHUL17 First Beam Profile Scans Positron beam in PETRAPositron beam in PETRA Beam energy: 7 GeVBeam energy: 7 GeV Bunch pattern: 14 x 1 bunch evenly filledBunch pattern: 14 x 1 bunch evenly filled Average current: 12 mAAverage current: 12 mA -Bunch charge = avg. current / (reprate * Nbunches) = 6.5 nC Laser energy measured: 40 mJ (specs 90 mJ), P L = 4 MWLaser energy measured: 40 mJ (specs 90 mJ), P L = 4 MW Optimization: qswitch delay, timing of ADC sample pointOptimization: qswitch delay, timing of ADC sample point Vertical and horizontal orbit bumps to steer positron beamVertical and horizontal orbit bumps to steer positron beam -Closed symmetric bumps using four steerers -Bump length: 50 m, max offset: 10 mm Operation of fast piezo scannerOperation of fast piezo scanner

16th December 2003 G. Blair, RHUL18 The Laser The laser has been given to us by B. Dehning from CERN. It has been used at LEP to measure beam polarizationThe laser has been given to us by B. Dehning from CERN. It has been used at LEP to measure beam polarization It’s a Nd:YAG Q-switched system, running with 30 HzIt’s a Nd:YAG Q-switched system, running with 30 Hz pulse energy measured: 40 mJ, power: 4 MWpulse energy measured: 40 mJ, power: 4 MW synchronization to PETRA beam by triggering the Q-switch Pockels-cellsynchronization to PETRA beam by triggering the Q-switch Pockels-cell transverse beam quality is modest (multimode)transverse beam quality is modest (multimode) measured spot size at IP: σ L = (80 ± 10) μmmeasured spot size at IP: σ L = (80 ± 10) μm

16th December 2003 G. Blair, RHUL19 Measurement of the longitudinal Profile The longitudinal profile has been measured with a streak camera: FESCA 200 from HamamatsuThe longitudinal profile has been measured with a streak camera: FESCA 200 from Hamamatsu largest window of the camera: 500 ps with a resolution of 5 ps (fwhh)largest window of the camera: 500 ps with a resolution of 5 ps (fwhh) The camera was triggered with the laser via a fast photo diodeThe camera was triggered with the laser via a fast photo diode Problem: stability of the trigger probably not better than 0.5 nsProblem: stability of the trigger probably not better than 0.5 ns

16th December 2003 G. Blair, RHUL20 Averaged Profile Measured averaged profile: fits to gaussian with a width of 12.5 ns (as expected)Measured averaged profile: fits to gaussian with a width of 12.5 ns (as expected)

16th December 2003 G. Blair, RHUL21 Structure in the Longitudinal Profile Example of a single shot measurement of the profile 500 ps window, resolution 5 psExample of a single shot measurement of the profile 500 ps window, resolution 5 ps 60 ps 66 ps

16th December 2003 G. Blair, RHUL22 Unfortunately, the structure is not stable The longitudinal structure is due to longitudinal mode beating – this was expectedThe longitudinal structure is due to longitudinal mode beating – this was expected The beating changes from shot to shotThe beating changes from shot to shot 30 ps 79 ps

16th December 2003 G. Blair, RHUL23 Laser Transverse Profile Units – number of CCD pixels

16th December 2003 G. Blair, RHUL24 Laser Summary As expected for a this type of laser, the longitudinal profile shows substructure due to mode beating As expected for a this type of laser, the longitudinal profile shows substructure due to mode beating The spikes have a width of 30 to 60 ps and a distance of 60 to 80 ps The spikes have a width of 30 to 60 ps and a distance of 60 to 80 ps Unfortunately, the structure is not stable and changes from shot to shotUnfortunately, the structure is not stable and changes from shot to shot To overcome this, the laser has to be equipped with a frequency stabilized seed laser or eventually with an Etalon To overcome this, the laser has to be equipped with a frequency stabilized seed laser or eventually with an Etalon Hot spots a problemHot spots a problem

16th December 2003 G. Blair, RHUL25 Orbit Scan First scan with signal on scopeFirst scan with signal on scope Then sampling of peak using ADCThen sampling of peak using ADC Moving beam orbit up and down with vertical orbit bumpMoving beam orbit up and down with vertical orbit bump 5k counts at each orbit position5k counts at each orbit position 3 min for each spectrum3 min for each spectrum 40 min for complete scan40 min for complete scan Background with 20k countsBackground with 20k counts -Mainly synchrotron radiation and bremsstrahlung -Rate changed by factor 10 Signal rate expected at peakSignal rate expected at peak -200 γs x 380 MeV avg Energy

16th December 2003 G. Blair, RHUL26 Result Orbit Scan Gaussian approximation of beam shapeGaussian approximation of beam shape σ m = (0.175 ± stat ± sys ) mm σ m = (0.175 ± stat ± sys ) mm Vertical beam size σ e = sqrt(σ m - σ L ) laser σ L = (40 ± 10) μm σ e = (170 ± 23 ± 37) μm Result of fit sensitive to background modelling Systematic error dominated by vertical orbit jitter More measurements and understaning of bkg sources necessary

16th December 2003 G. Blair, RHUL27 Fast Scanner Operation Next scan with remote controlled fast scannerNext scan with remote controlled fast scanner Orbit position stableOrbit position stable Scan range: ± 2.5 mradScan range: ± 2.5 mrad -Scan line = range * f lens = mm (± 20%) mm (± 20%) Change amplitude of scanner power supply (1-100V)Change amplitude of scanner power supply (1-100V) Take 5k countsTake 5k counts Record laser IP image with CCDRecord laser IP image with CCD Move laser beamMove laser beam Take 5k counts...Take 5k counts...

16th December 2003 G. Blair, RHUL28 Data and Analysis Seven scan points recordedSeven scan points recorded 5 min / point5 min / point 40 min for full scan40 min for full scan Positron beam position stable within ± 40 μmPositron beam position stable within ± 40 μm Moving low energy pedestalMoving low energy pedestal No background modelNo background model Orbit stable  bkg const.Orbit stable  bkg const. Simple pedestal cut insteadSimple pedestal cut instead Sufficient background rejectionSufficient background rejection

16th December 2003 G. Blair, RHUL29 New Setting Positron beam in PETRAPositron beam in PETRA Beam energy: 7 GeVBeam energy: 7 GeV Posittron beam optics not as in October scans!Posittron beam optics not as in October scans! Bunch pattern: 14 x 1 bunch evenly filledBunch pattern: 14 x 1 bunch evenly filled Low current: 7.1 mA, first bunch mALow current: 7.1 mA, first bunch mA -Bunch charge = avg. current / (reprate * Nbunches) = 3.9 nC High current: 40.5 mA, first bunch mAHigh current: 40.5 mA, first bunch mA -Bunch charge = 22.3 nC Vertical and horizontal orbit bumps to steer positron beam into laser beamVertical and horizontal orbit bumps to steer positron beam into laser beam -Closed symmetric bumps using four steerers Scanning of laser beam using the fast piezo scannerScanning of laser beam using the fast piezo scanner

16th December 2003 G. Blair, RHUL30 Results Data Slopy Gaussian approximation of beam shapeSlopy Gaussian approximation of beam shape σ m =(68 ± 3 ± 20) μm at low current σ m =(68 ± 3 ± 20) μm at low current σ m =(80 ± 6 ± 20) μm at high current σ m =(80 ± 6 ± 20) μm at high current

16th December 2003 G. Blair, RHUL31 Conclusions and Outlook Laserwire at PETRA produced first compton photons and measure vertical beam size Next steps:Laserwire at PETRA produced first compton photons and measure vertical beam size Next steps: Full characterisation of laser: beam size, divergence, and power (stability) with slot scans and imaging techniquesFull characterisation of laser: beam size, divergence, and power (stability) with slot scans and imaging techniques Update all readout software, merge BPM and PMT softwareUpdate all readout software, merge BPM and PMT software Do more systematic scans with the fast scannerDo more systematic scans with the fast scanner Go to smaller spot sizes and reduce error barsGo to smaller spot sizes and reduce error bars Build second dimension scanner.Build second dimension scanner. Start designing a complete laser-wire emittance measurement system for the LC BDS.Start designing a complete laser-wire emittance measurement system for the LC BDS.

16th December 2003 G. Blair, RHUL32 Collaborators DESYDESY BESSY (Thanks to T. Kamps for many of these slides)BESSY (Thanks to T. Kamps for many of these slides) UK: RHUL, UCL, RAL, (Oxford).UK: RHUL, UCL, RAL, (Oxford). CERN: (Laser, plus collaboration)CERN: (Laser, plus collaboration) Close contact with: SLACSLAC KEKKEK

16th December 2003 G. Blair, RHUL33 People Thanks to PETRA and BKR shift crews ! Thanks to PETRA and BKR shift crews ! K Balewski, G Blair, S Boogert, G Boorman, J Bosser, J Carter, J Frisch, Y Honda, S Hutchins, T Kamps, T Lefevre, H C Lewin, F Poirier, I N Ross, M Ross, H Sakai, N Sasao, P Schmüser, S Schreiber, J Urukawa, M Wendt, K Wittenburg,