SEMI AUTONOMOUS PALM PRUNER Analyze Phase Presented by Group 26: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith.

Slides:



Advertisements
Similar presentations
Lecture 4: The Solow Growth Model
Advertisements

CIA4U0 Analyzing Current Economic Issues Chapter 9: An Introduction to Macroeconomics Topic 1: Defining Macroeconomics Topic 2: Gross Domestic Product:
Operations Management
Transport.tamu.edu OSU Parking Privatization Overview Texas A&M University Transportation Services.
11-1 Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacement Lease or buy Cost reduction.
McGraw-Hill/Irwin Introduction to QuickBooks Pro, 2004 © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 13 Budgeting, Forecasting,
Chapter 11 – Forecasting and Short-Term Financial Planning  Learning Objectives  Understand how sales forecasts are used to predict cash inflow  Understand.
Verify Phase Semi Autonomous Palm Pruner Presented by Group 26: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith.
Sources of Information for Manufacturing Facilities Design
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Semi-Autonomous Palm Pruner By Department of Industrial Engineering: Bill Carpenter Juan Rojas Sarah Trayner & Department of Mechanical Engineering: Obie.
Manufacturing Engineering Department Lecture 1 - Introduction
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Post-Harvest Marketing Alternatives. Introduction  The marketing time frame for crops can be divided into three parts – pre- harvest, harvest, and post-harvest.
Financing and Producing Goods. Investing in the Free Enterprise System.
Marginal efficiency of capital
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 4-1 The Theory of Economic Growth: The Solow Growth Model Reading: DeLong/Olney:
Improving Safety through Efficiency in the Construction Industry – Is it a Fallacy? Presented by: Todd Hohn Brian Roberts.
1 Planning Change. Planning for improved efficiency and effectiveness Utilise the resources in a better way Obtain additional resources that may help.
CTC 475 Review Cost Estimates Cost Estimates Balance Statement Balance Statement Snapshot in time Snapshot in time Income Statement Income Statement Over.
CFR 250/590 Introduction to GIS © Phil Hurvitz, intro_overview.ppt Introduction-Overview Why use a GIS? What can a GIS do? How does a GIS work?
How do suppliers decide what goods and services to offer?
Chapter 4 Process Design.
Increasing, Diminishing, and Negative Marginal Returns Labor (number of workers) Marginal Product of labor (beanbags per hour) –1 –2.
1.Pareto Analysis 2.Fish Diagram 3.Gantt Chart 4.PERT Diagram 5.Job/Worksite Analysis Guide.
Group 26 – Palm Harvester Members: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner.
Sponsor: Dr. K.C. Chang Tony Chen Ehsan Esmaeilzadeh Ali Jarvandi Ning Lin Ryan O’Neil Spring 2010.
Shri Vaishnav SM Institute of Management, Indore Department of Computer Science Minor Project : MCA 406 ( ) App For Transportation Presented by:
MY CAREER RESEARCH Name: karlyon klsho Date: 4/28/14 Hour: 2ed Class.
University of Palestine Dept. of Urban Planning Introduction to Planning ( EAGD 3304 ) M.A. Architect: Tayseer Mushtaha
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
PLUG IT IN 6 Project Management. 1.Project Management for Information Systems Projects 2.The Project Management Process 3.The Project Management Body.
Materials Planning & Control. Introduction With the development of ‘integrated materials management’ and ‘supply chain management’, material managers.
Process Layout Chapter 7 July 20, 2005.
Sample Cost/Benefit Analysis of adding Human Factors Tasks to a Software Development Project Adapted from: Mantei, Marilyn M. and Teorey, Toby J., “ Cost/Benefit.
Do Now According to some reports, supermarkets make a profit of three to six cents for every dollar of revenue. Where does the rest of the money go????
An Introduction to Transportation Systems
What is a Robot? It can be used in exploration? It can be used in construction. It can be used in industrial applications.
Analyze Phase SENIOR DESIGN TEAM 25: PALM HARVESTER.
Economics 13-4 Economic Growth pages ECONOMIC GROWTH ESSENTIAL QUESTIONS: What are two measures of economic growth? Why is economic growth important?
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 21 The Macroeconomic Environment.
Economics 1490 GROWTH AND CRISIS IN THE WORLD ECONOMY with Professor Dale W. Jorgenson Lecture 26: December 3, 2015 Outlook for World Economic Growth Harvard.
2.02 Utilize project-management skills to improve workflow and minimize costs.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
 Affinity diagram  Tree diagram  Fishbone diagram.
  Fur trade essay will be returned this Friday Feb 10 th  Final exam for grade 10 History on the 15 th  8 classes before the Midterm Exam Welcome Back.
Career Research Activity By: Edson Stewart. Introduction  All of our materials processing classes are revolved not only around developing skills but.
Stand Alone Group Members: Jaime Alvarez Austin Chamberlain Trey Smith Jung Hoon Kim.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
Measure Phase Automated Palm Pruner Presented by: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner.
CP Math Lesson 1-4 “Problem Solving”. Quiz Solve for ‘r’: 1. Solve for ‘w’: 2. Find ‘y’ when x = -3:
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Department of Applied Economics and Management Cornell University Ithaca, NY Dr. Wen-fei Uva Senior Extension Associate What is Your Profitability?
1 INTRODUCTION TO COMPUTER GRAPHICS. Computer Graphics The computer is an information processing machine. It is a tool for storing, manipulating and correlating.
ECONOMICS BELL WORK TUESDAY, MARCH 29 TH What is the setting of this cartoon? What type of business usually lists its costs this way?
2.02 Utilize project-management skills to improve workflow and minimize costs.
WRITING THE COMPARE/CONTRAST ESSAY. Compare/Contrast  Designed to show relationship between two subjects  Focuses on how the subject are the same and.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Economics- Using Economic Models Chapter 1, Lesson 3.
(section 2) Costs of Production
1.1 Nature of Business Activity
Wenliang Hou and Geoffrey T. Sanzenbacher
M6205 SYSTEM SIMULATION AND MODELLING TERM PROJECT
Predetermined Motion Time Systems (PMTS) BY okolie jude…………
MANAGEMENT ACCOUNTING The Activity-Based Costing System based on John G. Burch, Cost and Management Accounting Materials prepared by Ph. D. Zofia Krokosz-Krynke.
AP Macroeconomics Economic Growth.
Assignment Capacity The recorded solution to the first problem is available at
Production and Operations Management
Table of contents 1. Introduction – your product, sketch, description, functionality, variants 2. Bill of materials 3. Manufacturing process- block diagram.
Presentation transcript:

SEMI AUTONOMOUS PALM PRUNER Analyze Phase Presented by Group 26: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner

Introduction The Palm Pruning project is focused on providing an efficient, economical, and effective means of harvesting fruit from oil palms Oil Palms grow feet Palm oil is worth 50$ a barrel Reduce the dangers associated with harvesting oil palm tree fruit Accomplished task by designing a Computer Integrated Robot

King Climber Design Robot Components Frame Actuators Guiding Rails Cutting Track Manipulator Arm Camera Ground Based Components Generator Remote Control Display Screen Operator

Spring Scheduling Tools Gannt chart ◦ Mechanical Timeline Goals ◦ Major Report Due Dates ◦ Staff Meetings ◦ Shop Times Critical Path Analysis ◦ Avoids bottleneck stops in construction ◦ Gives earlier start times for longer portions ◦ Provides a continuous flow of production

Gannt Chart

Critical Path Analysis

Diminishing Labor The current labor force is shrinking. Local seasonal workers are finding safer income elsewhere. In 3 to 5 years there will be a shortage of labor willing to climb trees. Project focus is not to compete with current climbing workforce but to replace this dangerous position.

Processing Times Comparison of robotic processing with current labor methods of harvesting in terms of time. Time (in minutes)` Process MachineHuman Climb Cut< 5 per bunch1 per bunch Descend Unhook510 Transport2< 1 Setup510

Venn Diagram Venn Diagram

Fishbone Diagram Fishbone Diagram

Cost Analysis Create a working design while staying economical The view point of our project sponsor The view point of a potential investor Determined Future Worth Projection Predict the increasing cost of labor Various tools and formulas used for these conclusions

Cost Analysis Calculated selling cost Selling Price = Total Cost (1 + Mark-Up Percent) Return of investment ROI= (Final Cost – Intial Cost) / Final Cost Future Worth Projection Projected Cost of Labor (20 Workers)

Sponsor Questionnaire -What is the average time for a worker to climb up a tree? 10 mins -What is the average time for a worker to cut a palm oil’s fruit bunches? 1.0 min per bunch - What is the average time it takes to walk from oil palm to oil palm? Depends on population density, average less than 1 min -What is the average setup time before going up a tree? 10 mins - What is the average number of workers working in a 1 hr? Depends on population density, average of 20 - What is the average number trees that can be cut in 1hr? Depends on number of bunches -What is the average distance between trees? 10 ft. -What is the number of hours that workers work? ~ 6 hrs -What is the average salary for a palm pruner? $2 per bunch cut -What is the physical stress on the body of a palm pruner from climbing up a tree? Just imagine!

Next Phase The next phase according to DMADV is Design. Being that we have already designed our product for the fall semester will use this time for building and fabrication. Next presentation we will have actual data and pictures from our design

Questions?