2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 PowerWorld Service Contract on RAS.

Slides:



Advertisements
Similar presentations
OC ORSTF Position WECC Board Meeting December 8, 2006.
Advertisements

Illinois Transition Planning Institute Facilitator Prep. Webinar Preparing for Your Role as a Team Facilitator: Part I April Mustian, Illinois State University;
Staff Council Presentation You and Your PSD “Position Source Document” Human Resources Eduardo Salaz Associate Vice President and Chief Human Resources.
1 State of Connecticut Core-CT Project Projects/Contracts Subject Matter Expert (SME) Kickoff March 7, 2007.
SRWG Chair Report March 2015 WECC HQ
QUALITY ASSURANCE IMPROVEMENTS CURTIN UNIVERSITY LIBRARY Curtin University is a trademark of Curtin University of Technology CRICOS Provider code 00301J.
1 How to Write an Incremental Funding Modification Sarah Echt May 2004.
Hospital Best Practices: Engaging Everyone When Spreading the Checklist.
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Unit 231 Software Engineering Introduction to SWE What is SDLC Phases of SDLC.
Presented By: Katie, Jake, Janet, Marcellous, and Junaid.
Part 2: Requirements Days 7, 9, 11, 13 Chapter 2: How to Gather Requirements: Some Techniques to Use Chapter 3: Finding Out about the Users and the Domain.
Development and Quality Plans
Standardization. Introduction A standard is a document. It is a set of rules that control how people should develop and manage materials, products, services,
LMS Gap Analysis 6/15/2011 Department of Personnel.
HP Project & Portfolio Management Resource Management July 11, 2007 CIMpleBS.com/HP-PPM/Training-Resource Management.pps By Dan Gallagher See NOTES page.
Work Breakdown Structure
“Here’s why you need the new wheels, too…” Shawn and Steve Image from
RATE Managing Your Training. RATE Today's Objectives: Introduce you to RATE and it's purpose Highlight the core concepts and features Demo RATE in action.
Copyright Course Technology 1999
Primavera Highlights During COLLABORATE  Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle.
N By: Md Rezaul Huda Reza n
1 RMS Training Sponsored by the RMS Center July 2006.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Task Order Competition (TOC) Process.
Foundations of Technology.  To familiarize students with the function, applications, and requirements of construction management.
Lecture 31 Introduction to System Development Life Cycle - Part 2.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Timesheet Deployment Considerations with Microsoft Office EPM Solution David Ducolon Program Manager Project Microsoft Corporation.
Week 2 Seminar: Project Scope Management
Federal Aviation Administration TCA WEB PAGE CHANGES FOR 2014.
“DATA” Providing Program Accountability, Curriculum Improvement and “DATA” For Your Program Of Study NOCTI Overview November 10, 2010 Lana Ford
January 15, :00am – 11:00am
(EDI SIG SIG9182 ) September 28, :30 pm - 4:15 pm Moscone West – 3010.
November 20, 2015 FOR YOUTH DEVELOPMENT FOR HEALTHY LIVING FOR SOCIAL RESPONSIBILITY YMCA of Boulder Valley TRAINING HOME (formally referred to as Dev.
1/9/2004CIWMB - SB 20 Implementation - Payment System Workshop1 Proposed Phase 1 System for Covered Electronic Devices (CEDs) Authorized Recycler Waste.
Texas Tech Company Sabrina Chen Krishna Prasad Yen Kuang Chuang.
 SAP AG 2007, SAP CSUN 2007 Conference Presentation / 1 Presented by Team “Call of Duty” 29 th April 2010 CS 6361, University of Texas At Dallas.
Software Reuse Course: # The Johns-Hopkins University Montgomery County Campus Fall 2000 Lecture # 2 - September 14, 2004.
Preparing an Adequate Shortfall Analysis and Corrective Action Plan.
Elluminate’s Integration to Blackboard Introducing Building Block Version 2.
CSE Senior Design II Day 1: Getting Organized Spring 2012 Instructor: Mike O’Dell.
1 Fundamentals of Blanket Purchase Agreements Breakout Session # E03 Name: Barbara Kinosky, Esq. Date: Tuesday, July 31 st Time: 2:30 PM – 3:45 PM.
INTRODUCING VERSION 9 Advances. Enhancements. Balance.
© 2015 TriZetto Corporation 2 Custom Solutions Maintenance Offering Eric Sommers.
© CGI GROUP INC. All rights reserved ERP Success: An extraordinary opportunity Gordon Bruce, City and County of Honolulu, HI.
Technology and User Support Breakout Session SVRS Conference for Wisconsin County Clerks May 4, 2005 – May 5, 2005.
ERA Project Team Meeting Project Management Plan April 23, 2002.
Business Management - Intermediate 2Business Decision Areas © Copyright free to Business Education Network members 2007/2008B111/078 – BDA 1.
Interreg Atlantic Area Programme Eligibility Rules.
MANAGEMENT INFORMATION SYSTEM
Personnel.

Figure 9.8 User Evaluation Form
Classifications of Software Requirements
Wael Ellithy, Ph.D. Arx ICT
Quality & Regulatory Operations MQIS Quality Engineer
Sponsored by the RMS Center
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
People Admin Annual Performance Review
FINANCE. FINANCE FINANCE YEAR 1 PRIORITY 1 PRIORITY 1 San Benito CISD will work to provide a full day pre-kindergarten program with highly qualified.
Towards a RANCH Mentoring Program (David Perry & Sue Birch)
Enterprise Program Management Office
Overview of Projector 4.1 (712) , access code
Alternative Pathways to Learning
SRWG Chair Report March 2015 WECC HQ
Day 1: Getting Organized Spring 2011
PowerWorld Service Contract on RAS
Presentation transcript:

South First Street Champaign, Illinois (217) PowerWorld Service Contract on RAS Mark Laufenberg, Ph.D. President ext. 10

2 Project Tasks 1.Software Modifications 2.User Workshops

3 Software Modifications Some new features –Opening substation contingency actions –Injection group load dropping actions –Adding “time delay” to contingency elements and defining order to occurrence of actions –Modifying injection group “open” actions to specify whether or not to exceed the requested flow –Adding contingency action to change resistance of DC line –Total fixed cost of all these together: $19,440

4 Software Documentation Updating RAS specification document to include all software enhancements. Document on our public website, continually updated Also – “If PowerWorld identifies the need for additional software enhancements, PowerWorld shall notify WECC of the need and provide an estimate of the cost needed to implement the specified additional features.” –Software Features are added on a cost-sharing basis at a reduced fee based on $135/hr

5 Implementation of RAS Models: WECC Utility Staff The only folks fully qualified to describe a utility’s RAS are the engineers who maintain and design the RAS for their system. –There must be engagement by WECC utility staff on this project –PowerWorld Corporation staff is here to help jump start the process, but utility staff needs to participate because they have the knowledge

6 Implementation of RAS Models: User Workshops Initial two hour webinar –April 2, 2015, 9 am – 11 am MDT. –Goal is to motivate interest in folks to sit down and start modeling their RAS First 2-day workshop at WECC Office –May 27, pm through May 29, Noon MDT –First day will be classroom training on what these RAS models can do –Second day will be break-out sessions with WECC members implementing their actual RAS together At the discretion (and scheduling) of WECC, possibility of second in person workshop and a follow up webinar will occur

7 Contractual Flexibility for WECC– Ability to Cancel Go back to earlier presentations by PowerWorld over the past several years on how effective software development projects work –Small projects with short time-frames –Small means very small: Features so far have been between 4 hours and 60 hours Don’t think of this as one big project –It’s really a bunch of small projects all under one contractual framework –Give WECC staff flexibility in assigning tasks –This can be cancelled at WECC’s sole discretion at any time