Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.

Slides:



Advertisements
Similar presentations
R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
Advertisements

USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
ISIS Accelerator Division
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Low Energy operation of RHIC AGS low energy extraction performance N. Tsoupas et. al. BNL.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
COMET Task Force 16/Oct/2008 J-PARC PAC meeting Satoshi MIHARA.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
ADSR Inst.July 2009 From PAMELA to ADSR, T.Yokoi From PAMELA to ADSR Takeichiro Yokoi (JAI)
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
After Protons from RCS 1 st DeeMe Collaboration Meeting Dec. 10, 2012 Kazami Yamamoto J-PARC Center Accelerator Division.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Bocheng Jiang SSRF AP group
Alternative/complementary Possibilities
Acknowledgments: LIU-PT members and deputies, H. Bartosik
New AD Production Beam in the PSB
Injector Chain General and more about p-RCS
Injector Chain General and more about p-RCS/i-RCS
Progress towards Pulsed Multi-MW CERN Proton Drivers
PSB magnetic cycle 900 ms MeV to 2 GeV
Injection design of CEPC
Gap Transient Suppression using Increased Bunch Density
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
Presentation transcript:

Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam

Outline 2 Proton Acceleration Extraction/Transport Experimental Area

Proton Acceleration

Requirements on the Proton Beam Beam Energy and power: 8GeV, 56kW(7  A) Bunch width and bunch-bunch spacing:~100nsec, ~1  sec Extinction: <10 -9 Bunched slow extraction (slow extraction w/o switching off acceleration RF cavity)

Proton Acceleration Nominal scheme RCS: h=2 MR:h=9 8 buckets filled 1 empty bucket, used for kicker excitation MR RF cavities are designed for this scheme h=18 optional by removing capacitors on cavities Need long shutdown to change the configuration 8 filled buckets out of 9 buckets

Proposed Scheme (I) RCS: h=2 with one empty bucket MR:h=9 with 5 empty buckets Bunched slow extraction Slow extraction with RF cavity ON, 210kV Realization of an empty bucket in RCS by using the chopper in Linac Simple solution No need of hardware modification Heavier heat load in the scraper Possible leakage of chopped beam in empty buckets Simple solution No need of hardware modification Heavier heat load in the scraper Possible leakage of chopped beam in empty buckets

High-frequency Chopper

RCS Bunch Structure Chop! RCS RFQ Bunch structure

Proposed Scheme (II) & (III) Space charge tune shift is half of (1) Longitudinal emittance is twice of (1) NO EMPTY BUCKET IN RCS RCS RF system needs minor modification (low level RF) NO EMPTY BUCKET BOTH IN RCS AND MR Space charge tune shift is half of (1) LARGE MODIFICATION OF MR RF SYSTEM IS NECESSARY Long bunch

Proton Acceleration Prospect Try scheme (I) first for an extinction study No hardware modification is necessary Investigate Time structure of the proton beam Heat load at chopper RF voltage while extraction Scheme (II) may be able to be tested if h=1 operation of RCS is realized for MR intensity upgrade Check how extinction can be improved

MR Simulation 11 Can we estimate the extinction using simulation? Difficult… Impossible to trace >10 9 particles

0turn,0s,Bf= GeV 82600turn,0.4414s,Bf= turn, s,Bf= turn, s,Bf= GeV Acceleration 160kV constant turn, s,Bf= GeV

Extraction/Transport

Extracted Beam Size Acceptance at MR slow extraction line and transport line is 25  mmmad Beam size shrink by adiabatic damping is SMALL in 3  8GeV acceleration Nominal scenario space charge tune shift: (RCS), -0.2 (MR) 144  (0.4GeV)  54  (3GeV)  35  (8GeV) 1.5 times 1.5times Strategy Keep MR rep. rate as high as possible reduce particle number in the bunch to suppress space charge effect Accelerate beam with smaller emittance than nominal This can be achieved by reducing painting area in RCS narrowing transport line and MR collimator apertures

Possible RCS Painting and MR Operation Pattern 0.16x10 14 ppb (1/2.6 of designed value) 144  (0.4GeV)  36  (3GeV)  15  (8GeV) RCS tune shift  (0.4GeV)  23  (3GeV)  10  (8GeV) RCS tune shift Need measurement MR operation pattern 8GeV extraction 7  A, 56kW RCS: h=1 (1 bunch) MR: h=9 (4 bunch), 4 batch injection Need 6 RF cavities operational (currently 4 in operation with 1 spare)

Extraction Same with normal slow extraction Can we keep bunch structure during slow extraction process? Test of “normal” slow extraction at 30GeV is scheduled on 27/Jan

Bunched Slow Extraction 8GeV energy h=9, RF cavity ON, 210kV EL=3eVs, matched ellipse Before extraction at ESS Extracted beam at ESS 70nsec

Uniformly distributed beam (H:80  m, V:20mm) hits the ESS wires normally MARS Simulation Model of the ESS

“ real loss” = N(hitted p)-N(scattered p)/N real loss 0.14%=1kW remaining protons ・ scattered to extracted side (one pass) ・ scattered to circulated side (circulate in the ring) Protons scattered at the ESS wires (MARS) Scattered to extracted side 40cm downstream from ESS exit Scattered to circulating side

Transport to the Target Detailed study is not started yet Probably COMET needs external- extinction device, like AC dipole, to improve the extinction after extraction The transport line must be long enough (50-100m) to include necessary equipments. R&D work is in progress by the COMET group in collaboration with the Mu2e group

Status of J-PARC Accelerator 21 Successful acceleration to 30GeV Preparation of slow extraction in Jan-Feb Test of bunched slow extraction Extinction measurement

Exp. Hall 22 The hall itself is ready. Beam line construction is in progress 4 secondary beam lines are planned to be built 1 primary beam line in (near) future 30GeV 8GeV

A possible layout… 23

Summary J-PARC proton acceleration for COMET Dedicated beam bunch configuration with bunched slow extraction Scheme (I) can be tested in 2009 Extraction/Transport possible area layout

Bunch length

Stripline AC dipole at 80 kHz excites coherent vertical betatron resonance Fast (100 ns) kickers cancel AC dipole at the bunches Kicker duty factor is low 100 ns / 2.7  s = 4% Concept tested in FY98 using existing AC dipole and kickers AGS internal extinction test (from BNL K. Brown slide) Internal Extinction Device