Requirements For Performing A Professional Lighting Audit By Stephen Guthrie President EnerNet, Inc.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Why Plan Ahead? Limit Susceptibility Limit Risk Contain Material Loss Contain Human Impact Limit Down-Time Ensure Longevity FEMA Fact: 80% of businesses.
All purpose professional emergency lighting. Ceiling mounting. Beghelli Formula 65 is equipped with a symmetric reflector which makes it suitable for.
NGfL CYMRU GCaD LIGHTING APPLICATIONS.
Lighting concepts – Ballasts and Lighting Controls
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
Step Up Payback Proposal Program “How-To” 9/4/07.
Emerging Lighting Technologies Roundup
Energy Efficiency 4/29/2015 Lighting Akrem Awad 1.
Management and Organisation of Electricity Use Energy Efficient Lighting Techniques Belgrade November 2003.
A GENERIC OFFICE WITHOUT THE WISENET SYSTEM A GENERIC OFFICE WITH THE WISENET SYSTEM.
Emergency Lighting Code Review Presented by Iota Engineering LLC.
© 2014 Pearson Education, Inc. This work is protected by United States copyright laws and is provided solely for the use of instructors in teaching their.
Kitchen Remodeling Checklist Phone:
Competency: Draw Floor Plans Objective: Demonstrate the rules and standards for electrical fixture placement.
Welcome to Sanforce. Introduction of Sanforce Sanforce Technology (Shenzhen) Co., Ltd is specialized in manufacturing and supply of emergency lighting.
Chapter 19 DC Circuits.
Chapter 19 DC Circuits. Units of Chapter 19 EMF and Terminal Voltage Resistors in Series and in Parallel Kirchhoff’s Rules EMFs in Series and in Parallel;
1 Fundamental Principles of Solution Design and Implementation Chapter 3.
Copyright © 2009 Pearson Education, Inc. Lecture 7 – DC Circuits.
General Physics 2Circuits1 Electric Hazards Lethal current mA causes ventricular fibrillation Larger current - 1 A does not stop heart causes burns.
Welcome to: Electrical Repair & Maintenance Course
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING PROGRAM STUDI KEAHLIAN (SKILL DEPARTEMEN PROGRAME) : TEKNIK BANGUNAN (BUILDING TECHNOLOGY) KOMPETENSI.
P/1 NEMA/NFPA/UL LVDC Conference April 8, 2011 Product Standards Ken Boyce Underwriters Laboratories Inc.
The ABCs of Facility Studies in the 21 st Century: It’s More Than Just Numbers Carol S. Cash, EdD, Clinical Associate Professor, Virginia Tech Travis W.
The First Central Emergency & Standby Lighting System Combining Storage Batteries & Generator Input 1 1.
Christina Joy Chambers SCAVENGER HUNT BUILDING SYSTEMS FOR INTERIOR DESIGNERS IND 5615 FALL 2011.
P WARNING: Exam is Thursday, 7:30 – 9 pm Room Review Sessions: Me: Tuesday 4-6 pm6-120 Imran:Wednesday8-10 pm4-270 In class:Thursday12-2 pm;
Healthy people/Healthy communities Disaster Planning and People with Disabilities.
Topics for Today’s Program ä Is your company really Selling ? ä Do you differentiate yourself and sell your added value ? ä Are you selling the right people.
Facilities Management and Design
CHAPTER 6 LIGHTING. CHAPTER OBJECTIVES Explore the Properties of light; Understand the Traditions and Options for creative Lighting Design; Survey Equipment.
Motion Sensor Policy Reform  Brief review of Motion Sensor Policy History  Key Regulator Requirements  Potential for conflict with Fire Code  Case.
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
Physics Chapter 20: Circuits and Circuit Elements.
Chapter 26 DC Circuits. Units of Chapter EMF and Terminal Voltage - 1, Resistors in Series and in Parallel - 3, 4, 5, 6, Kirchhoff’s.
1) What area are you most nervous about for the midterm? A.Residential electrical systems B.Commercial electrical systems C.Panel and branch circuit sizing.
TS 1.1 Basic Digital Troubleshooting 1 ©Paul Godin Updated August 2013 gmail.com.
Copyright ©2011 by Pearson Education, Inc. publishing as Pearson [imprint] Introductory Circuit Analysis, 12/e Boylestad Chapter 4 Ohm’s Law, Power, and.
Basics of Lighting Controls U.S. Department of Energy Rebuild America And Novitas, Inc.
1 ISE Ch. 20: Vision and Illumination Performance on visual tasks depends on …  human vision  environment  task Human Vision acuity color vision.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Lighting Systems: Electrical Sources Chapter 3 Part 2 © 2006 Fairchild Publications, Inc.
Chapter 7 Lighting Controls © 2006 Fairchild Publications, Inc.
code calculations, construction drawings
McGraw-Hill © 2007 The McGraw-Hill Companies, Inc. All rights reserved. Objectives This section will show you how to: write effective paragraphs and essays,
Making An Off-Site Visit. Before your visit: get the exact address and directions to your location know the name and title of the person you are visiting.
Linear High BayLumiDas-SLH series SLH Lumidas ® Linear High Bay LumiDas Linear High bay is a linear type bay light which can used for various places as.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
A DOLLAR HERE…A DOLLAR THERE Watching the Bottom Line in Today’s Economy Presented by: Bill Parrish (oneplusone) 3.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Incident Investigation New Mexico State Risk Management Loss Control Bureau and Law Offices of the Public Defender Loss Control Committee.
Copyright © 2009 Pearson Education, Inc. An ammeter measures current; a voltmeter measures voltage. Both are based on galvanometers, unless they are digital.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
Lighting Beyond the Bulb LED Lighting and Lighting Management Solutions Todd Smith
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Chapter 19 DC Circuits. EMF and Terminal Voltage Any device that can transform a type of energy into electric energy is called a source of electromotive.
Physical Science. Overview  Expectations  Safety Considerations  Prior Knowledge  Game  Lab  Resources/Websites  Exit Pass.
LIGHT! A Photographers Paint. What is Light? The part of the electromagnetic spectrum that is visible to the human eye. Our brains perceive different.
Competency: Draw Floor Plans
QQ Two wires of equal length are made from the same material. How is it possible for the wires to have different resistances? If a circuit has a voltage.
Calculating Payback Period
LIGHTRUSS Size 2 LED.
ILLUMINATION.
Ohm’s Law. Ohm’s Law Work, Energy, and Power Series Circuits.
Competency: Draw Floor Plans
Objectives Learn about Electricity Pricing Electric systems.
Competency: Draw Floor Plans
Presentation transcript:

Requirements For Performing A Professional Lighting Audit By Stephen Guthrie President EnerNet, Inc.

Rules of the Game If you want to play this game ….”You Must Follow The Rules” –Rule #1 - Come Prepared – The Right Tools Are Key –Rule #2 - Take the Time To Learn About The Environment You Are Working In –Rule #3 - Don’t Be Rushed –Rule #4 - Pay Attention to All The Details –Rule #5 - Follow Rules 1, 2, 3 & 4 –Rule #6 - Its Not Really A Game

Five Major Elements There are Five Key Elements To A Successful Lighting Audit –Site & Building Information –Room & Usage Information –Luminaire Information –Controls / Switching Information –Problem Areas / Miscellaneous

Lighting Audits Require Great Attention to Detail The First Step is the Interview Process –Determine the Scope of The Survey –Determine if there are any measures that have been performed in the past….What Type of Measures, When? –Identify other “Key Elements” to avoid costly mistakes, liability and embarrassment

Site & Building Information The Interview What Types of Questions Should I Ask? –What is the Square Footage of Building(s)? –Is there an energy management system? –Does the EMS control the lighting? –Are there other control measures? –Is Voltage uniform throughout the building? –Is there an emergency generator / inverter system? –Are there battery back-up units in fixtures?

The Interview (con’t.) What Other Questions Should be Asked? –Do the fixtures have modular connectors / wiring? –Is the building wired for power-line carrier? –Are there sensitive environments where special equipment is used such as scanners? –Are there other control measures? –Is there asbestos in the ceiling / PCB’s? –Has there been any injuries or complaints related to lighting?

The Interview (con’t.) It’s Important to get the Basic Essential Information –Site Contacts –Phone, Fax & –Electric Utility Host / Rate Structure –Operating Hours / Characteristics

Step 2 - Room Specific Information Establish the General Room Parameters –Operating hours / zones within a building –Site Maps or CAD Drawing Reference –Suite Numbers / Room #’s, Names or ID’s –Sloped Ceilings / Structural Issues (ducts) –Ceiling Types –Measurements If Required (x,y,z) –Illumination Levels, Daylight Contributions, Etc.

Step 3 - Luminaire Specific Information Determine the Vital Characteristics –Luminaire Types & Quantities –Configuration, Tandem Wiring, Connectors –Dimensions & Properties (explosion, vandal resistant, wet/damp location) –Battery Back-Up, Dedicated Emergency Circuits, etc.

Step 3 - Luminaire Specific Information Determine the Vital Characteristics (con’t.) –Lamp Types & Quantities Per Fixture –Configuration / Jacket Type (Par, R, Bi-Pin) –Dimensions & Properties (color temperature, wattage, voltage rated) –Lens Types

Step 4 - Controls / Switching Specific Information Determine Control Methods & Strategies –Is there a central Energy Management System controlling the Lighting? –Are there room controls such as Occupancy Sensors or Time Clocks? –What are the Switching Types & Styles? –What Recommended Controls / Types should be used?

Step 5 - Problem Areas / The Exit Interview Determine if there are Any Other Lighting Issues or Problems –Maintenance Issues –Adequate Illumination In Critical Areas –Complaints of Eye Fatigue or Headaches –Lamp Flicker, Switching Problems, Etc.

Summary Make A Set of Rules & Follow Them –Don’t Take Shortcuts – Shortcuts Add Cost –Spending The Time In The Field Gathering All the Right Data is the “MVC”, a Most Valuable Consideration To The Project Developer –Come Prepared Calibrated Light Meters Graphing Paper Digital Cameras Measuring Instruments

Summary Make Use of Your Best Tools Common Sense A Clearly Defined Plan Careful Execution

THANK YOU! EnerDog Says Woof!