Lawrence W. Fryer, Jr. Chief Operations Officer AISD UpClose Presentation November 30, 2012.

Slides:



Advertisements
Similar presentations
Roles and Responsibilities. Collaborative Efforts to Improve Student Achievement Guidelines for developing integrated planning and decision making processes.
Advertisements

UCSC History. UCSC: A brief history 60s University Placement Committee A lot of field trips/interaction with employers.
BOE PRESENTATION – TONA 2020 UPDATE JANUARY 30, 2014 PRESENTED BY: CARRIE OLIVER, LISA DRMACICH, BRIAN MISLIWY AND JAMES NEWTON.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. LOCAL.
STRATEGIC PLAN Community Unit School District 300 7/29/
 Board of Trustees - Reviewed and prioritized the needs from previous MISD facility assessment and programmatic changes in curricular and extracurricular.
A Presentation on the Management and Curriculum Audit for the Guam Public School System April 14, 2009.
Independent School District South High School. AUSTIN Independent School District South High School Planning Committee Charge  The charge of the South.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
UNIT 5 REDISTRICTING COMMUNITY FORUM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm.
Annual Report of Progress The Public Schools of Jersey City Dr. Charles T. Epps, Jr. State District Superintendent of Schools January 4, 2006.
1. KCS Strategic Goals: Focus on the student to ensure they excel academically and are prepared for life beyond the classroom. Recruit, select, induct,
1 EEC Board Policy and Research Committee October 2, 2013 State Advisory Council (SAC) Sustainability for Early Childhood Systems Building.
GUIDELINES FOR DEVELOPMENT OF STUDENT ASSIGNMENT BOUNDARIES Board of Education Meeting Eugene Street Board Room July 12, 2011.
BVUSD Facility Workshop September 17, Board Policy-BP 7110 The Board of Trustees recognizes the importance of long-range planning for school facilities.
Planning for Secondary Growth DIPBLE nvironments CCRCTEL earning 2014RISDF lexible September 22, 2014.
Long Range Facility Planning assisted by Silver Falls School District.
Our Roles as Stewards of Collaborative Excellence.
Raising the Bar for DCPS School Facilities Best Practice in PK-12 Educational Facility and Capital Planning.
Community Bond Oversight Committee Report to the Board of Trustees Presented by: Ashton Cumberbatch, Bobby Jenkins, and Eliza May October 11, 2010.
College Station ISD Planning for Growth December 12, 2006.
Building for the Future of Johnston Schools Forum for Public Feedback on September 11, 2012 Bond Referendum Monday, October 29, :00 PM Summit Middle.
BUDGET HEARING AUGUST 20, Update Since the Hearing AVID ◦Additional staff professional development training ◦Building site plans for AVID.
PRESIDENT’S REPORT Academic Senate Carol Kimbrough, MA, MFT November 25, 2014.
Missoula County Public Schools Overview of Planning January 2014.
Community Bond Oversight Committee Report to the Board of Trustees Presented by: Ashton Cumberbatch, Bobby Jenkins, and Eliza May March 7, 2011.
Report to the Board of Trustees Presented by: Ashton Cumberbatch, Bobby Jenkins, and Eliza May March 8, Community Bond Oversight Committee DRAFT.
February 9, 2012  Partner with the community  Provide an effective educational experience  Prepare every student to find success in our complex society.
The Life of a Policy Council Member
Planning and Community Development Department Housing Element City Council February 03, 2014.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
East Lansing Public Schools PLANNING FOR THE FISCAL YEAR AND BEYOND March 28, 2005.
Advocacy: Influencing Facility Development in Public Parks and Recreation Departments Tennis advocacy should occur year round through informal communications.
Report to the Board of Trustees Presented by: Ashton Cumberbatch, Bobby Jenkins, and Eliza May November 23, Community Bond Oversight Committee.
BUDGET MESSAGE 2009 Salem-Keizer Public Schools. Our Values  Minimize the impact on students.  Provide security for our employees by saving jobs as.
Berkeley County School District Goals and Focus Areas
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
A Blue Print for Collecting School Facilities Data.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Proposed Budget and Superintendent’s Message FY Presented to the Board of Education April 14,
Facilities and Planning Department March 30, 2009 Katy ISD Katy, Texas.
BRIDGEWATER-RARITAN REGIONAL SCHOOL DISTRICT Adopted School Budget /21/08: Final.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
Walters Middle School Conversion STEAM Magnet Proposal
Hamilton County Department of Education
Local Control Accountability Plan LCAP
Capital Construction Bond Program
University Career Services Committee
System Goals Academic Excellence Educational Equity Social and Emotional Learning Improving and Expanding Facilities.
Research Program Strategic Plan
Raising the Bar for DCPS School Facilities
Capital Planning Advisory Group April 11, 2018
May 8, 2018 Bond Program.
1300+ High School Seats School Board Work Session May 15, 2017
CURRICULUM & INSTRUCTION
Update to Board of Trustees: November 9 FAC Meeting
Superintendent Goals Update MAY 7, 2013
OSPI Capital Budget School Facilities & Organization
Roles and Responsibilities
Bradley Beach Board of Education
Local Control Accountability Plan LCAP
FY Capital Improvement Program Draft
Presentation transcript:

Lawrence W. Fryer, Jr. Chief Operations Officer AISD UpClose Presentation November 30, 2012

Facilities and Operations 2

The Council of Great City Schools recognized the AISD as a 2011 Top Performing District in the management of its business services. This recognition was based on key performance measures and indicators that demonstrate efficient and effective use of resources in the critical areas of child nutrition, maintenance and operations, safety and security and student transportation. I provide leadership and oversight to the following operations functions: Facilities Construction Management Maintenance Services Planning Services Transportation Food Services Police Services 3

Facilities and Operations Office of Facilities Oversees construction management and bond implementation programs. Oversees maintenance/service center. Coordinates district development and operations with other governmental entities. Staffs advisory committees such as the Community Bond Oversight Committee, the Citizens’ Bond Advisory Committee, the Environmental Stewardship Advisory Committee and the Boundary Advisory Committee. Conducts demographic analyses to project the need for capital improvement projects and determine or adjust boundaries. Manages real estate related responsibilities. 4

Facilities and Operations Office of Facilities, Department of Construction Management and Department of Maintenance Services: Scheduled construction of the district-wide performing arts center begins in January Design of North Central Elementary School No. 2 has begun with the approval of the schematic design by the Board of Trustees on September 24, The feasibility period for the evaluation of the site is currently underway. Presentation of the proposed attendance areas for North Central Elementary School No. 1 is scheduled for the December 3, 2012 work session with Board action scheduled for December 17, Planning for the 2013 Summer Shutdown to reduce energy use is currently underway. The Summer Shutdown program, which has been implemented for the previous two summers, helped avoid approximately $450,000 for the cost of electricity. 5

2004 Bond Program $519,526,616 Renovation to campuses and District-wide facilities 6 Elementary Schools 2 Middle Schools Additional Classrooms Land Acquisitions Southwest Middle School Undesignated Elementary School Performing Arts Center Future Southeast Middle School Safety and Security Low-Emission Buses 6

2008 Bond Program $343,717,819 Relief for Over-crowding and Support for Academic Achievement Linder Early Childhood Center Classroom additions: Barrington, Hart, and Langford Undesignated Elementary School Auditorium Renovations at McCallum and Lanier HS High School Science Laboratory Technology Upgrades Health and Safety Special Programs District-wide Performing Arts Center Land acquisition for South High School Renovations at Anderson HS 7

Proposed May 2013 Bond Program 8

Facilities and Operations Food Services Over 14 million meals served annually Self contained kitchens at each school location Approximately 750 employees district-wide Offers the Summer Food Service Program Initiatives/Cooperatives Participate in Farm to School (produce purchased from local farmers) Kid’s Café offered in 18 locations (after school meals program) After School Snack Program (offered in 60 locations) Serve at internship site for up to 15 U.T. nutrition students yearly Local Chef’s*Local Fresh – department program that pairs chefs in the community with after school programming for students/parents 9

Facilities and Operations Police Department 68 Sworn Police Officers. Provides 24/7 coverage for all 120 facilities in the 220 square mile jurisdiction of AISD. 43 of the 68 officers are assigned to campuses as School Resource Officers (SRO). Officers provide services outside of traditional law enforcement- presentations, teach elective class (Junior Police Academy) at middle school campuses. Officers provide Gang Resistance and Education Training (GREAT) to 5 th and 6 th grade students in the district. The department handles an average of 28,000 calls for service each year. 10

Facilities and Operations Transportation Transportation Department serves 22,000 students daily on 512 school buses through 245 regular routes, 153 special education routes, 125 mid- day routes, 8,000 field trips and summer service routes. “Transportation management within the district is exemplary”, according to the most recent management efficiency study completed in May The department has current technology applications to manage efficient routing, a stop location finder, school personnel access to bus route information, field trips and field trip requests, after school buses, planning fleet maintenance, mapping rider addresses, discipline referrals, digital cameras, an accident database and GPS system. Replacement buses meet the latest low-emission EPA standards. The district owns a plug-in hybrid bus, is piloting six propane buses made possible through Railroad Commission funding, and has retrofitted 93 buses that are seven to 10 years old to improve indoor and outdoor air quality and reduce emissions. 11

Long-Range Facilities Planning In November 2009, the Board directed the Administration to address long-range facilities planning. The primary purpose of the facilities master planning effort is defined by the assumptions that the Board adopted on January 25, 2010: To thoroughly identify and consider all factors that contribute to facilities decisions, and develop a comprehensive plan that will ensure adequate and equitable facilities to support and enhance the learning environment for academic programs in all schools. To inform the planning for every district facility, will be developed over a 10-year planning horizon, and align to the district’s adopted Strategic Plan and resulting educational plans. To be an open and transparent process that engages stakeholders from all school communities in the district, district and public entity representatives, students, employee professional organizations and the faith and business communities. To address recommendations to achieve greater facility efficiency to reduce the cost of district operations to realize savings while being responsive to changes in student enrollment, including recommendations on the use of portable buildings. To address the issue of resource levels needed to effectively maintain and preserve the taxpayers’ investment in new facilities. The AISD Strategic Plan, Key Action Step 4.1, directs the district to “develop and implement long-range plans for facilities, transportation, libraries and technology that align infrastructure with the district’s educational plan.” 12

Long-Range Facilities Planning (Cont’d.) With this guidance, the District undertook a year-long facilities planning effort that included an educational adequacy assessment of all facilities, a two-day visioning workshop, eleven community meetings, and 24 meetings of the 72-member Facility Master Plan Task Force. On March 28, 2011, the AISD Trustees “received” the final 10-Year Report of the Facility Master Plan Task Force. On May 23, 2011, the Board approved a revised Facility Master Plan Next Steps Timeline, which was developed based on a combination of factors, including community feedback, institutional history, and key benchmarks that will be needed to set the stage for a potential future bond election. On November 21, 2011, the Board of Trustees approved the Facility Master Plan Framework to guide future long-range district planning efforts. On December 12 and December 19, 2011, the Board of Trustees approved the initial group of Annual Academic and Facilities Recommendations (AAFRs). The AAFRs serve as a blueprint for how the district establishes both its short- and long- range facilities plan. They have both a capital and operational impact and must be included in the district’s overall budget planning. Since the adoption of the Framework and the approval of the first AAFRs, a Draft Ten-Year Academic and Facility Master Planning Timeline has been developed in order to begin to capture the long-range plans of the district. A proposed modification to the Facility Master Plan Framework will be scheduled for Board action at the January 28, 2013, Regular Board Meeting to ensure that consideration of AAFRs is not scheduled in such a way that new Board members are seated the month before AAFRs are scheduled for Board action in December. 13

Annual Academic and Facility Recommendations (AAFRs) Update AAFR Category A – AAFRs with potential of approval in December 2012, with an implementation date in Dual Language Program Expansion and Extension 2.Responsive Education Solutions Continued at Lanier and Travis High Schools 3.School for Young Men 4.Campus-Initiated In-District Charter at Travis Heights Elementary School 5.Any Given Child Fine Arts Program (based on the Kennedy Center Fine Arts Study results) 14

Annual Academic and Facility Recommendations (AAFRs) Update AAFR Category B – AAFRs with the greatest potential of moving forward for implementation for Garcia and Pearce Middle School Program Design, District 1 15

Annual Academic and Facility Recommendations (AAFRs) Update AAFR Category C – AAFRs that are in development and engaged in the vetting process. 7.Academic Programming and Facility Support for Eastside Memorial Vertical Team 8.South High School (land-only 2008 Bond Program) 16

Annual Academic and Facility Recommendations (AAFRs) Update AAFR Category D – AAFRs determined that are now potential bond projects referred to the Citizens’ Bond Advisory Committee for possible inclusion in the scope of work for the next bond program 9.AAFRs determined by Achievement Test Data and Facility Support Needs – Rosedale School and Clifton Career Development School Renovations 10.Fine Arts Program Facility Additions and Renovations 11.Parity and Equity in Career and Technical Education (includes additional consideration of STEM initiatives linked to proposed UT-Austin medical school) 12.Secondary Athletic Program and Facility Improvements 13.Hold: School for Young Men 17