Upgrade of UK Interconnect Signalling Doug Turner : BT AWG Chairman.

Slides:



Advertisements
Similar presentations
Standards, Open Standards and IPR Paul Davey Strategic Relationships Executive Vodafone Group Plc.
Advertisements

ITU WORKSHOP ON STANDARDS AND INTELLECTUAL PROPERTY RIGHTS (IPR) ISSUES Session 5: Software copyright issues Dirk Weiler, Chairman of ETSI General Assembly.
Tendering Yuck!.
A Proposal for TEIN Organization (draft v2.0) 22 nd Jan 2007 Dr. ByungKyu Kim TEIN Org Task Force TEIN2 Technical Committee.
Session 8 Implementing PPPs
1 Brief Status of ITER TBM A High-Level Ad Hoc Group (AHG) met April 10-11, per request of the ITER Council. In that meeting, Parties intentions were stated,
Modified by: Masud-Ul-Hasan and Ahmad Al-Yamani 1 Chapter 11 Network Management (Selected Topics)
Inter-Operator TMN & OSS Workshop Prague, March Technical Development and Support for European ATM Service Introduction John Boyles, PL.
NICC Review ~ 2003 Bill Hawkins NICC Operational Plan Continued “austerity” regime, focus on –Commercial imperatives –Regulatory critical issues.
OSIAM4HE Proposed org structure Authored by the strategy and organization team.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Copyright © IEC, Geneva, Switzerland Shuji Hirakawa Secretary of IEC Technical Committee May 2010 Status.
1 Georgian National Energy and Water Supply Regulatory Commission Institutional structure of the Commission Giorgi Chakhnashvili 27 June - 3 July, 2008.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
International Atomic Energy Agency THE “EMERGENCY CONVENTIONS” Interregional Training Course on Technical Requirements to Fulfil National Obligations in.
NGN INTERCONNECT WORKING GROUP 4 April 2005 Update on the TSG Project Plan and Technical Work Paul Griffin – Network Architect, Energis Nick Ireland –
OPTICALINTERNETWORKINGFORUM OIF Technical Committee and Its Activities Joe Berthold, Ciena, Technical Committee Chair.
Implementation of EU Electronic Communication Directives.
Payment claim administration in Lithuania Conference and Open Discussion about Effective management of EU structural funds 1-2 of February, 2012 A. Stalerunaite,
Three Country Pilot The way to ISI ”Jeppe” Jepsen Motorola.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
Telecommunications Act Licences Helen Hicks Oftel.
Home and building automation in a mixed-use building Ho-Jin Park ETRI, Korea ISO/IEC JTC1/SC25/WG1-N1535.
Project Management Models
JOINING THE TEAMCFA CHARTER SCHOOL NETWORK. BRIEF OVERVIEW One Year Process 300 Point Scale Divided Evenly Between Three Committees (Academics, Business,
© Mahindra Satyam 2009 QMS Training Conducting Contract Review.
INSTITUTIONAL ASPECTS DURING PHASE II 10 TH COSCAP- SEA STEERING COMMITTEE MEETING, MACAU (CHINA), 9 – 10 OCTOBER 2008.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
Multi-Service IP Interconnect 6 th May Multi-Service IP Interconnect A Multi-Service Interconnect Link to support PPCs PSTN/ISDN DataStream Multi-Media.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
UNECE – SIDA “ SOUTH EAST EUROPE REGULATORY PROJECT” FIRST MEETING OF REGULATORS FROM SOUTH EAST EUROPEAN COUNTRIES PRESENTATIONFROM THE REPUBLIC OF MACEDONIA.
Agreement Reaching Process Documentation (Example) Professional Virtual Community Business Opportunity.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
Practical Information and Guidance to Applicants Green Industry Innovation Programme Romania July 2014 Practical Information and Guidance to Applicants.
Presentation to the Portfolio Committee on the Social Security Agency February 2005.
Network Structures WG Paul Griffin 13 January 2006.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Consult21 Consult21 Working Group – Broadband and LLU 3rd Meeting 19 April :00 – 14:00 WELCOME.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Consult21 Systems & Process Working Group 19th October 2005 Welcome.
BT Wholesale Services and Solutions Voice & Access Market Solutions In-direct Access Transit Product SMP Mobile BT IDA Operator £ £ £ Key: Call Flow Money.
Doc.: IEEE /0690r0 Submission Andrew Myers, BT Slide 1 July GPP SA3 Interworking Security Issues II Andrew Myers British Telecommunications.
Consult 21 Interconnect Working Group Overview Of NICC NGN Interconnect Architecture For PSTN/ISDN Replacement Rob Spindley BT 4/1/2006.
Application Procedures for White Space Database Administrators (WSDBA) Joint Industry Canada/RABC Stakeholder Discussion - Ottawa, ON May 14th 2013.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 NNI standards for IMS inter-connection including mobile and fixed IMS network.
INTERCONNECT WORKING GROUP 28 JANUARY 2005 BT’s Thinking about Next Generation Interconnect in 21CN DARYL DUNBAR HEAD OF 21CN CUSTOMER SOLUTIONS The information.
COR1000 Telecoms Project UK Link Committee Update May 2013.
Network Services: RM1045 Procurement Process
FM 54 GSM-R points ERA ERTMS Unit London, 22 February 2016.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Advisory Committee Voting Protocol Advisory Committee - Voting.
The National Skills Academy for Rail (NSAR) Neil Robertson - CEO.
DG Information Society: Telecommunications, Markets, Technologies - Innovation and Exploitation of ResearchE.C. LK/lk 1 ‘3883’ and the new regulatory package.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Programming Committee - composition
Kenjiro Arai NTT ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 NNI standards for IMS inter-connection.
Attestation Concept additional explanation and implementation proposal
INTERCONNECTION GUIDELINES
Presentation to the Portfolio Committee on the Social Security Agency
Purchasing cycle Purchase request
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
Signal Conditioning.
JAIN FOR MAP PROJECT GROUP: Maurizio Bonuccelli Piero Lauri
Timeline and Key Milestones for One Health Platform Launch
Submission Title: Opening Report for the TG6 Session in May 2008
Presentation transcript:

Upgrade of UK Interconnect Signalling Doug Turner : BT AWG Chairman

Drivers EU drive towards open network interfaces Oftel pursuing this via an MoU Indicates intentions to migrate to an ETSI protocol, ISUP Operators have procurement choice Suppliers have global products Pulling together

The protocol MoU to migrate the protocol used for interconnect between operators in the UK, from IUP to UK ISUP. Based on ETSI ISUP with additional capabilities specified by PNO-IG Interconnect Signalling Committee. Additions support UK facilities such as Indirect Access, and Number Portability. The MoU seeks the implementation of version 2.2 of the PNO-ISC specification for UK ISUP.

The proposed MoU Milestones 1UK ISUP Spec V2.2 agreed by PNO-IG31/03/1999 2When UK-ISUP shall be available for interconnect testing, in preparation for milestone 3.31/12/2000 3When PNOs requesting interconnect may first insist on UK-ISUP provision.31/12/2001 4When PNOs requested to provide interconnect may first be allowed to refuse new IUP provision. 31/12/2003 5When new IUP provision shall cease.31/12/2004 6When IUP shall be withdrawn.31/12/2006

Status Administrative Working Group (AWG), set up by Oftel to manage the agreement and implementation of the MoU. The technically, legal and commercially content of the MoU was agreed by the AWG in 3/4Q1999. Invitation to UK operators and suppliers to sign the document before the end of 1999.