 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.

Slides:



Advertisements
Similar presentations
Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
Advertisements

NedPower Mount Storm Project Update for Grant County September 25, 2007.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
FUTURE Vaughn Nelson Conservation and energy efficiency Renewable energy Carbon trading National Renewable Portfolio Standard US Goal: 20% of electric.
Sandviken, Tuna Sandviken Stockholm Business Sweden.
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
Public Service Company of New Mexico
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
North American Strategic Infrastructure Leadership Forum October 12, 2011.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
May 8, 2007 Trintek Energy Consulting, Inc. Creating Competitive Advantage Thru Intelligent Development Visit Us On the
THE OFFSHORE SITUATION IN GREECE Municipality of Corfu.
Jason Marks Commissioner, District 1 February 4, 2008 New Mexico’s Path to a Sustainable Energy Future.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Transmission and the Growth of Wind Energy November 2011.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
A+ for Energy ® Energy Educator Training Conferences Sponsored by BP, Presented in Partnership with The NEED Project and NREL The New Mexico Energy Story.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
THE TRES AMIGAS PROJECT Project Objective, Business Model, and Benefits -ERCOT Presentation Jan 22, 2010 Austin, Texas UNITING THE NATION’S ELECTRIC POWER.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Southwest Renewable Energy Transmission Conference May 21, 2010 Jeff Mechenbier Director Transmission & Distribution Planning and Contracts.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WSTA-2011 Western States Transportation Alliance A Brief Overview By: RJ Hicks | Executive Director
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
The Future of Electric Power In Utah January 12, 2010.
High Plains Express Initiative Jerry Vaninetti, Vice President Trans-Elect Development Company, LLC Arizona Corporation Commission Fifth Biennial Transmission.
The Lower San Pedro Valley and Aravaipa: Worthy of Protection.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Riverside County Transportation & Land Management Agency Juan C. Perez Director Riverside County Renewable Energy Grant Update August 3, 2015.
1 CCPG Senate Bill 100 Lamar – Front Range Presentation May 27, 2010.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Transmission Options for Mariah Project, Phase II 3/10/2010.
20th Century Electric Transmission Grid
THE TRES AMIGAS SUPERSTATION ENERGY GAME CHANGERS “THE DELIVERERS” FEBRUARY 28, 2011 UNITING THE NATION’S ELECTRIC POWER GRID.
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Defenders of Wildlife Species we are helping to protect.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
CLASS and New Revenue from Wind Power Projects Annual Conference Seattle 2009.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
1.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Cooperation on Regional Siting: How Is It Working - A California Perspective Dian M. Grueneich, Commissioner California Public Utilities Commission National.
Every state in the nation benefits from wind energy.
Multi-State Clean Energy RFP 1 To explore whether a multi-state procurement might attract larger-scale projects and transmission than single state procurements.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
LS Power LS Power is a power generation and transmission group
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
EI-WECC Seams Study Needed
Four Corners Wind Resource Center Webinar
BLM Wind Energy Program
SunZia Project Description
Southwestern Region Homework Packet
Southwestern Region Homework Packet
Presentation transcript:

 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010

 Regional Development ° High Plains Express - Line from Wyoming to New Mexico ° SunZia - Line from New Mexico to Arizona ° Southline – Line from New Mexico to Arizona ° The Santa Fe Line - Line from New Mexico to Nevada ° Tres Amigas Superstation - Western, Eastern and Texas Interconnection  Proposed Collector Systems ° PNM ° SunZia ° Santa Fe Line 2

3 PNM Collector System Integration with SunZia and HPXBelenBelen GuadalupeGuadalupe BA BA2 700 Total Wind Guadalupe/Willard/Duran: 6000 – 8000 MW HPX SunZia/HPX WillardWillard WindHubWindHub High Wind East Hub Mesa Wind QuayCurryQuayCurry Taiban Mesa New station Existing station Proposed wind projects with signed LGIA Existing \under construction Existing 115 kV line New 345 kV line Proposed Wind Projects Existing 345 kV line

 New Mexico Senate Memorial 44  RETA’s responsibilities ° Develop a map and supporting documents identifying existing generation and transmission lines and renewable energy resource zones to support development ° Coordinate with other agencies to prioritize regions with low or minimal land development conflicts ° Identify and prioritize the best options for potential transmission corridors 4

 Next Steps ° Have a draft set of corridors and are beginning the public review and input phase ° Plan to update the report every 6-12 months as additional information becomes available ° Working with the Military Installations to minimize potential impacts on their missions ° Begin work with Counties to permit corridors ° Goal is to reduce time needed to site lines from years to months 5

New Mexico Renewable Energy Transmission Authority 200 W. DeVargas St. Suite 4 Santa Fe, NM (505)