1 Properties of scCVD diamonds irradiated with a high intensity Au beam Jerzy Pietraszko a, W. Koenig a, Träger a for the HADES Collaboration a GSI Helmholtz.

Slides:



Advertisements
Similar presentations
1 Pion beam tracker for HADES Jerzy Pietraszko CBM Collaboration Meeting, March 9-13, 2009, GSI, Darmstadt.
Advertisements

Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Investigation of the properties of diamond radiation detectors
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
1 Alhussein Abuhoza, S. Biswas, U. Frankenfeld, J. Hehner, Ch. Schmidt GSI, Darmstadt, Germany and H.R. Schmidt University of Tübingen, Germany Study of.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
Proposal for read-out of Forward Detector straw tubes PANDA DAT requirements General layout Prototypes M. Idzik, M. Kajetanowicz, K.Korcyl, G. Korcyl,
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
Применение MAPD (Zecotek) в адронных калориметрах и многоканальных времяпролетных системах в экспериментах по релятивистской ядерной физике Ф.Ф.Губер,
Third workshop on hadron physics in ChinaWang Yi, Tsinghua University A conceptional design of SOLID-TOF Outline: Development of low resistive glass and.
Electromagnetic Calorimeter for HADES at SIS100: MAMI and CERN test results Lead-glass modules Tests -  beam at MAMI energy resolution -  - /e - beam.
9 th Workshop on Electronics for LHC Experiments 2 October 2003 P. Antonioli (INFN/Bologna) A 20 ps TDC readout module for the Alice Time of Flight system:
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
Diamond Detector Developments at DESY and Measurements on homoepitaxial sCVD Diamond Christian Grah - DESY Zeuthen 2 nd NoRHDia Workshop at GSI Thursday,
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Mariana Petris, NIPNE Bucharest CBM Meeting, March 9 -12, 2005 HIGH COUNTING RATE TRANSITION RADIATION DETECTOR Bucharest Prototype In Beam Tests.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
RPC upgrade for the HADES Tracking: MDC e -,e + identification with RICH- TOF/PreShower  0.4 GeV/c TOF is not sufficient- Pre-Shower p,  identification.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Proportional chambers with cathode readout in high particle flux environment Michał Dziewiecki.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
1 ADAMAS Dec 2012 Piotr Koczoń,GSI Start Detector for - observation - simulation - realisation P.Koczoń / DetLab GSI Helmholtzzentrum für.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
SP- 41 magnet ZDC RPC (TOF) DC ST Target T0 detector MPD / NICA and / Nuclotron Experiments Picosecond Cherenkov detectors for heavy ion experiments.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
FTOF Status Anton A. Izotov, Frascati
STT read-out concepts Detectors requirements and layout Read-out concepts Developments of Analog FE and Digital Boards STS el. group : INFN, FZ Juelich,
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
J.Pietraszko, HADES Coll. Meeting, GSI Nov ,  – electron multiplicity measured in HADES W. Koenig, Jerzy Pietraszko, T. Galatyuk, V. Pechenov,
SiPM Workshop EU-FP7(HP3), Vienna, 16 Feb F.G. H.O. Study of scintillator detectors time resolution with different SiPM readout on T10 test beam.
The Slow Control System of the HADES RPC Wall Alejandro Gil on behalf of the HADES RPC group IFIC (Centro Mixto UV-CSIC) Valencia, 46071, Spain IEEE-RT2009.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
Picosecond timing of high energy heavy ions with semiconductor detectors Vladimir Eremin* O. Kiselev**, I Eremin*, N. Egorov***, E.Verbitskaya* * Physical-Technical.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
for the HADES Collaboration
Activities and Results from PNPI GATCHINA
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
Department of Engineering Physics, Tsinghua University, Beijing, China
Beam detectors performance during the Au+Au runs in HADES
The Electromagnetic Calorimetry of the PANDA Detector at FAIR
Results achieved so far to improve the RPC rate capability
Present Read Out Chain for the PANDA Barrel DIRC
Start Detector for pion experiments
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Slow extraction – input from HADES at SIS18
A heavy-ion experiment at the future facility at GSI
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
of secondary light ion beams
Conceptual design of TOF and beam test results
Времяпролетный детектор PANDA
Update on SoLID-TOF Wang Yi Outline: Conceptual design of SoLID-TOF
High time resolution TOF for SoLID
Status of CMS-PPS timing detectors
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
Jerzy Pietraszko, HADES at SIS100 - status GSI Darmstadt, Germany
Presentation transcript:

1 Properties of scCVD diamonds irradiated with a high intensity Au beam Jerzy Pietraszko a, W. Koenig a, Träger a for the HADES Collaboration a GSI Helmholtz Centre for Heavy Ion Research GmbH Planckstrasse 1, D Darmstadt, Germany  T0 detector and beam monitoring reqirements for Au+Au experiment in HADES  Au beam properties at SIS 18  Radiation hardness tests of scCVD diamond detector  scCVD diamond detector with strip metalization in Apr 2012  Outlook: -CBM/HADES at SIS100 and SIS300 -fast readout electronics

22 The HADES detector at GSI  azimuth. symmetry  large coverage: y =  hadron & lepton PID  2% mass resolution  LVL2 lepton trigger  forward wall     GeV   e + e − ToF measurement essential part of particle identification (T0 determination)  diamond detector Au+Au ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

3 HADES Start-Veto system (Au+Au) Detector requirements: Low material budget (low interaction probability), good time resolution (below 50 ps) In vacuum operation, located directly in front of the target in order to reduce load on the RICH  Start det.: monocrystalline diamond, 70  m thickness, 4.7mm x 4.7mm  Veto det.: polycrystalline diamond, 100  m thickness, behind the RICH Detector. Start - Halo 4,7 mm 15 gold targets (Ø 2.2 mm) Start detector mm ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

4 HADES Start-Veto system (Au+Au)  Start det.: monocrystalline diamond, 70  m thickness, 4.7mm x 4.7mm  Veto det.: polycrystalline diamond, 100  m thickness, behind the RICH Detector. 15 gold targets (Ø 2.2 mm) Veto detector Start detector 45 cm Veto detector, pcCVD reference detector 10 mm 4,7 mm Start detector scCVD mm ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

Signal characteristics for Au 1.23 AGeV E. Berdermann et al., „First applications of CVD diamonds...”, Como 1998 pcCVD  Reduction of the effective field due to the large space charge produced by heavy ions  Optimal working point for Au beam: 6-7 V/µm ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

6 Start-Veto system readout electronics Issues: High rate, up to 10 7 /s per channel. Fast signals, analog signal from diamond – 200 ps rise time, base width < 1ns. Our approach: Dedicated NINO based discriminator board with trigger functionality. Time measurement performed by HADES TRB board – based on HPTDC. NINO-based board NINO chip: Developed for Time-of-flight measurements in the ALICE experiment Key features: Adjustable discriminator thresholds. Front end time jitter <10ps. Sustains very high rate (>>10MHz) Peaking time: 1ns. Input signal range: 30fC - 2pC. Noise: <2500 e-. Discriminator threshold: 10fC - 100fC. Timing precision: <10ps jitter. Output: LVDS. 8 x input signals 8 x scaler/trigger output signals 8 x LVDS timing output signals ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

7 scCVD with high intensity Au beam stability problem ! Setup and conditions: Start det.: monocrystalline diamond, 70  m thickness, HV set to 200 V. Veto det.: polycrystalline diamond, 100  m thickness, HV set to 200 V. Beam particles intensity: 10 6 /s per channel Long term stability problem – increasing off-spill current Effect clearly visible after 2-3 hours of continuous Au beam with intensity 10 6 /s (/ mm 2 ) Observed for scCVD and pcCVD diamond materials TimeStart current in spillStart current off spillVeto current in spillVeto current off spill 10:  A0.00  A2.6  A0.00  A 11:  A0.09  A2.6  A0.04  A 12:  A0.88  A1.8  A0.20  A 12:  A0.88  A2.4  A0.40  A...  Strong dependence on the HV observed: example: 200 V – 0.25  A 150 V – 0.08  A could not stand 4-5 weeks of Au+Au production run in HADES !!!!  Stable long term operation at 1.4 V/µm ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

8 Start-Veto system – test with Au beam, time resolution at 1V/  m (HV = 50 V) St ch1 41 ps St ch2 35 ps St ch3 38 ps St ch4 35 ps St ch5St ch6 St ch7 St ch8HPTDC resolution HV reduced by a factor of 4 (200 V  50 V) - the time resolution below 50 ps  expected stable long term operation during high intensity HI run ! ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

9 Five days with Au beam (Au 2011) Dismounted Start detector: Beam spot 0.8x1.6 mm 2  1.28 mm mm M. Träger, GSI Det.Lab X-ray Microanalysis (EDX) No damage to the Au metalization surface visible Electron microscope GSI Target. Lab ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

Au beam properties at SIS 18 measuerd with a strip detectror Beam profile in X and Y directions 3σ y = 1.26 mm3σ x = 0.97 mm ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

11 Five days with Au beam Total dose during 5 days measured in the Start detector 1.9 x Au ions + 30 % DAQ off + 30 % beam times in 2010  3.04 x Au ions / 1.0 mm 2  3.04 x Au ions / mm 2 inner segments outer segments ADC spectra: Pu239 - Am241 - Cm244 in vacuum (5.157 MeV, MeV, MeV) mm M. Träger, GSI Det.Lab ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

12 Start detector efficiency determination  Strong eff. changes correlated with shifts in beam position !! 0.70 x Au ions / mm x Au ions / mm 2 ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

13 Radiation hardness study with Au beam - amplitude reduction Threshold characteristics (Aug11): cut amplitudes lower than 35mV Analog signals, Au beam, HV: 100V Amplitude; 94 mV  After 3.04 x Au ions /mm 2 about 5% of signals below 35 mV  Total absorbed dose : 7.9 Grad (312 MeV / Au ion)  Amplitude reduction by a factor of 2.7  Precise CCE measurment needed ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

14 Start detector time resolution ( after 3.04 x Au ions / mm 2, 7.9 Grad ) difficult conclusions: the right picture measured for signals very close to the discriminator threshold level (large time jitter)  worsening comes from electronics ! ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

stripes on each side -strip width: 200µm -gap: 90 µm -thickness about 60 µm Highly segmented diamond sensor – excellent beam diagnostic capabilities – used in Apr 2012 (5 weeks Au beam) 4.39 mm Beam profile in X and Y directions ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

Outlook: Fast readout electronics TRB 2 Board: 4 TDC – 128 channels (HPTDC), 4x512Mb SDRAM, FPGA – Virtex4LX40, ETRAX, FS – 4 processors, 100Mb/s,TCP/IP, 2,5 Gb/s optical link, DSP TigerSharc, DC/DC converters, AddOn connector  Time, ToT, 96ps/bin channels  Time, ToT, 25ps/bin - 32 channels  Rate capability: up to 3 MHz per channel All channels show RMS below 25ps/1.4 = 17.8 ps Eugen Bayer, Michael Traxler Real Time Conference (RT), th IEEE-NPSS New development available: ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012 T0 detector and beam quality monitor for FAIR (HADES/CBM)  high rate experiments (10 9 HI beam particles) : decent segmentation + fast readout electronics (TRB3)

17 Outlook: Fast readout electronics dE/dx High rate, high charge resolution measurement (Diamond, ECal, MDC,....) Large jitter of the integrator width (charge) due to high gain for low frequency noise After walk correction via leading edges:  Charge Resolution: 0.17 % ADAMAS 1 st Workshop, GSI, Darmstadt, December 2012

Thank you We highly appreciate the support of E. Berdermann et al. from the GSI Detector Laboratory and A. Hübner at al. from the GSI Target Laboratory for the detector preparation.

19

20 Start-Veto system for HADES pion/proton experiment (MIPs) Experimental conditions and requirements for HADES pion experiment: Secondary pion beam, mom.=1GeV/c (MIPs)  scCVD Demanding beam particles intensity >10 6 pions/sec Secondary beam. Beam spot diameter 1-2 cm  Large area moncrystaline diamond Timing signal for Tof measurement and for trigger - 50 ps time resolution Prototype: 4.7 mm x 4.7 mm, monocrystalline: used for proton induced reactions NIMA 618 (2010)

21 Start-detector for MIPs – test with p beam Juelich proton beam, 2.95 GeV: Two Start det.: monocrystalline diamond, 500  m thickness, 4.7mm x 4.7mm, with halo functionality, 50nm Cr/150nm Au metallization. Stable operation at intensities > 10^6 protons/ s/channel, BEST TIME RES = 100 ps, expected 50ps TDiff ToT after ToT cut

22 The Multipurpose Trigger Readout Board TRB TRB Board: 4 TDC – 128 channels (HPTDC), 4x512Mb SDRAM, FPGA – Virtex4LX40, ETRAX, FS – 4 processors, 100Mb/s,TCP/IP, 2,5 Gb/s optical link, DSP TigerSharc, DC/DC converters, AddOn connector  Time, ToT, 96ps/bin channels  Time, ToT, 25ps/bin - 32 channels  Rate capability: up to 3 MHz per channel Pulser test signal sent to 8 channels. Individual INL corrections for each channel  All 32 channels show RMS below 25ps/1.4 = 17.8 ps ~1.5 m of cable

23 Beam position monitoring  Precise position information mm