TEC at SLM 24 Aug 2011 Vito Baggiolini Reporting about work initiated or coordinated by me.

Slides:



Advertisements
Similar presentations
BE/CO Changes in LS1 to the Software Development Infrastructure and Widely Used Libraries Chris Roderick, Greg Kruk, Katarina Sigerud, Luigi Gallerani,
Advertisements

Controls Configuration Service Overview GSI Antonio on behalf of the Controls Configuration team Beams Department Controls Group Data & Applications.
Connect. Communicate. Collaborate WI5 – tools implementation Stephan Kraft October 2007, Sevilla.
 M.A - BIS Workshop – 4th of February 2015 BIS software layers at CERN Maxime Audrain BIS workshop for CERN and ESS, 3-4 of February 2015 On behalf of.
controls Middleware – OVERVIEW & architecture 26th June 2013
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
LHC Experiment Dashboard Main areas covered by the Experiment Dashboard: Data processing monitoring (job monitoring) Data transfer monitoring Site/service.
Using the WDK for Windows Logo and Signature Testing Craig Rowland Program Manager Windows Driver Kits Microsoft Corporation.
Proposalz Generator Plus July Proposalz Generator Plus
Mandate of CO/DO section and Status/Outlook for Build tools
Integration and Sites Rob Gardner Area Coordinators Meeting 12/4/08.
1 G A A new Document Control System “A new system to manage LIGO documents” Stuart Anderson Melody Araya David Shoemaker 29 September, 2008
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks C. Loomis (CNRS/LAL) M.-E. Bégin (SixSq.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Log analysis in the accelerator sector Steen Jensen, BE-CO-DO.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Eric Roux – AB/CO/AP Going to a “Linux only” operational world… The consequences for AB/CO/AP European Organisation of Nuclear Research Geneva - Switzerland.
ACET Accelerator Controls Exploitation Tools Progress and plans, December 2012.
Chris Wright Senior Systems Engineer, Lucity MOVING TO ONE DATABASE FOR SQL SERVER.
Microelectronic Systems Institute Leandro Soares Indrusiak Manfred Glesner Ricardo Reis Lookup-based Remote Laboratory for FPGA Digital Design Prototyping.
Security monitoring boxes Andrew McNab University of Manchester.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Deployment work at CERN: installation and configuration tasks WP4 workshop Barcelona project conference 5/03 German Cancio CERN IT/FIO.
20-May-2003HEPiX Amsterdam EDG Fabric Management on Solaris G. Cancio Melia, L. Cons, Ph. Defert, I. Reguero, J. Pelegrin, P. Poznanski, C. Ungil Presented.
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
Debriefing of controls re-commissioning for injectors after LS1 TC 09 October 2014.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
BE-CO-DO - Development tools (Eclipse, CBNG, Artifactory, …) - Atlassian (Jira, Wikis, Bamboo, Crucible), CO Testbed - DIAMON/LASER - JMS (Java messaging.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Application Communities Phase II Technical Progress, Instrumentation, System Design, Plans March 10, 2009.
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
Centralized Logfile Search (a.k.a. Tracing) Vito Baggiolini with Gergo Horanyi, Felix Ehm, Stephen Page.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Strategy to achieve smooth upgrades during operations Vito Baggiolini BE/CO 1.
Julia Andreeva on behalf of the MND section MND review.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
CMW status 6 Feb CMW status February 2002 Kris Kostro.
Issues concerning Device Access (JAPC / CMW / FESA) With input from: A.Butterworth, E.Carlier, A. Guerrero, JJ. Gras, St. Page, S. Deghaye, R. Gorbonosov,
POST-ACCOR renovations until LS2 – DEBRIEFING – Marine Pace, CO3 – 17 September 2015 Input from Chris, Marc, Stephen, Stephane, Wojtek.
FESA S. Deghaye for the FESA team BE/CO. What happened since April? followed by “Our plans”
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
Michael Ernst, page 1 Application Communities: Next steps MIT & Determina October 2006.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
Upgrades of Operational Linux Platforms Vito Baggiolini BE-CO-DO 1.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
DIAMON. What is DIAMON ? Technology stack Current Situation & Plans.
“What you get” – Controls Software – Evian December 18 th 2012 Steen Jensen What you get Steen Jensen on behalf of BE-CO Based on discussions with OP Mike,
PIE migration: new interface with the same functionalities PIE migration: new interface with the same functionalities Derek Mathieson Jozef Dransfield.
V4.
A monitoring system for the beam-based feedbacks in the LHC
C/C++ Build tools & Testbed
CO HW Monitoring Architecture
BE-CO LS1 review View from TE/ABT/EC
WP4-install status update
Generator Services planning meeting
Middleware – ls1 progress and planning BE-CO Tc, 30th september 2013
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
PIE migration: new interface with the same functionalities
11/23/2018 3:03 PM © Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN.
Presentation transcript:

TEC at SLM 24 Aug 2011 Vito Baggiolini Reporting about work initiated or coordinated by me

Outline Progress on TEC-related initiatives –BLM raw data Logging –ACET (presented by Steen) –Misc FESA 3 Status and plans Upcoming TEC work –Planning of new versions of Linux and Java –Planning of Legacy removal Upcoming TCs 2

BLM Raw Data Logging BLM user community need raw data –Raw, not only filtered data as now, e.g. for UFO search –Plus extraction from LHC logging DB must be faster Eugenia acknowledges this as valid requirement to CO Solution proposed: –Separate Logging Server instance, with new HW (DM, IT) –Optimized logging extraction API: 100 – 200x faster extraction for vector-numeric data (Chris, Daniel) –Extensions in BLM concentrator (Marek) To be deployed next week (30 August) –New HW installed by IT in 513 –New data upload API ready (Chris) –BLM concentrator is being modified (Marek) New clients expected  proactive approach needed 3

[ACET] Diagnostic GUIs GUI’s have been identified via component providers and piquet team CCM “diagnostic” menus have been created and populated with diagnostic tools Training to be organized in the weeks to come

[ACET] Component integration All components at FE and MT identified and visualized Presentation for AP foreseen 02 Sep 11 Dependencies – Java prototype working on Windows and Linux. Matches process names to local/remote ports Metrics reporting – Java: JMX/mBeans central registration mechanism being investigated, to be approved by AP. Then integration work can begin in the projects – C/C++: Mark has agreed to modifying the DiaMon agent to accommodate any mechanism for local communication, such as a pipe

[ACET] Central tracing Dedicated tracing machine (SLC6, 64bit, non-standard) MW tracing transport running using OpenJDK for now All operational trace messages redirected (in parallel, by NMN) to tracing machine Timing messages being received – (Very) preliminary loss detection indicates 2.6% message loss

[ACET] Configuration feedback Agreement on configuration feedback protocol obtained so far from MW (Wojtek, Felix), Timing (Jean-Claude), IEPLC (Frank), Drivers (David) and DM (Zory) Using syslog local2.info -> mw trace transport -> CCDB A first proof-of-concept for the configuration feedback mechanism working (Encore drivers -> CCDB) Timing and IEPLC eager to use it as well Java API prototype done C/C++ API approach being evaluated (Errlog)

Misc progress Smooth upgrades –Donat Csikos (HU), technical student has arrived –Works on tools to help developers make smooth upgrades General purpose component diagnostics in Java servers (Daniel Teixeira) –Traces calls from clients to Java servers –Info accessible through JMX –Based on first implementation done for LHC logging server 8

Plans for FESA 3 State of affairs –New functionality has been developed to ~90% –Considerable work needed for Quality Assurance –Leandro takes full responsibility of C++ FESA core –Julien is responsible for FESA development GUI Plans and ongoing work: –Investment in QA: Unit tests, automatic builds, testbed –Shorter development cycle (new beta version every 2-3 weeks) –Find/use additional resources VIA starting in October Frank, Anastasiya for 2.10 support (first-line in the eqp groups) Jeremy for automatic build and testbed integration Others for demo classes, test for testbed, etc Closer collaboration of C++ community in 864 and 936 –Testing, tools, reviews, etc (Wojtek, Leandro, Katarina) 9

New versions of Java and Linux Recent discussions about –Linux SLC6, 32/64bit, Java 7, OpenJDK –Nicolas is tweaking and validating SLC6 with RT extensions on MEN A20 boards Motivations cited –Easier maintenance –Unification –End-of-support for SLC4 and Java 6 Need group-wide discussions with all stake holders –Pierre will lead the Linux discussion –Katarina will lead the Java discussion Results to be presented in TC in Autumn 10

Prepare for legacy removal during LS1 Goal: remove as much legacy as possible during LS1 Planning has to start now, involving our clients across the whole sector –Input for 2012 MARS (at the end of this year) –Problematic cases must be handled proactively Proposals for simplification/unification: –Linux as only recommended operational OS (Phase out LynxOS, but also “deprecate” Windows) –Same version of Linux on FECs and back-ends? –No new developments and minimal support for old platforms (Middleware, FESA, diagnostics, …) Organization: SL, ACCOR with MCCs –« Blocking » cases should be identified and (re-)discussed Presentation in TC in Autumn by Marc, Pierre, Javier 11

TC Topics (starting again Sep 15) CCDB: Background, work done and plans (Zory) OpenCBCM project and plans (Jean-Claude Bau) Build tools –Update on Java build tools (Niall, Jeremy) –The new C/C++ build system (Jeremy) Planning for removal of CO legacy in 2013 (Marc, Pierre, Javier) Upgrade Plans for Linux and Java (Pierre, Katarina) Experience with First-Line support (Marc) OASIS progress and plans (Stephane) New hardware solutions in view of CLIC (Marc, Javier) 12