Accelerator Integration Design Integration Group [DIG] Apr. 2015

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

A Product of Online E-learning & Assessment Software Web-based Learning Management System (LMS) Copyright © ANGLER Technologies.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
Requirements Structure and Status for NCFE
Virtual Cell Support Software: User Interface Worldwide Web Instructional Committee, North Dakota State University, Fargo, ND.
YJB TOOLKITS: Disproportionality YJB owner: Sue Walker Dept: Performance May (2011) Version 1.0.
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
This chapter is extracted from Sommerville’s slides. Text book chapter
Requirements Engineering for the Accelerator Eugene Tanke Systems Engineer Workshop on Requirements Conformance for SRF.
Configuration Management (managing change). Starter Questions... Which is more important?  stability  progress Why is change potentially dangerous?
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
First SPL Collaboration Meeting Organization of the Collaboration - Preliminary ideas - R. Garoby 12/12/2008.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
 Before software can be engineered, the system must be understood.  The overall objective of the system must be determined, the role of the system elements.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
1 1. Some recent views ( ) 2 Linac tunnel
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Integration Drawing Exchange Solution [IDES] Mar. 2015
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Configuration Management
State of Georgia Release Management Training
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Project management Topic 8 Configuration Management.
Eurostat Sharing data validation services Item 5.1 of the agenda.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
PLM-documentation management plans & status Henrik Lindblad Group Leader PLM & Process support Oct 16, 2014.
ESS The INFN in-kind contribution to the accelerator of the European Spallation Source.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
PBI task force intermediate report Stephen Molloy.
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Status of the 3D model and updates from the IKC models May 2015
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
Status of the design integration strategy and installation design January on.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
WP High Beta Cavities Delivery
Training Documentation – Replacing GSPR with RFQ 2.0
Installation Global System
Release Management Release Management.
Test stand preparation and EMR "live" data summaries
WP1 INERTIA Framework Requirements, Specifications and Architecture
Markus Hüning 3rd XFEL Collaboration Meeting
LCLS Linac Technical Design Review Charge
Software Development Process
SPOKE Cavities frequency preparation plan and RF control procedures
Ciprian Plostinar Workshop on Testing and Commissioning
Mechanical Engineering & Technology (MET)
CAD DESK PRIMAVERA PRESENTATION.
European Spallation Source ERIC
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
Radwaste: status & way forward
High Level Readiness Reviews
Accelerator NCFE Liaison Officer
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
RF introduction Anders Sunesson RF group leader
M. Henrard, B5 N. Buysse and H. Linden, B6 Eurostat
CE compliance -LLRF- Anders Svensson, ESS
Accelerator Installation Schedule
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Accelerator Integration Design Integration Group [DIG] Apr

Purpose Design Integration Group (DIG) is part of the Physical Plant Working Group (PPWG) DIG focuses on the integration of the related 3D-models in a Catia v6 master- assembly in ESS, either contributed by IKCs or designed in ESS – ESS needs to assimilate all the different design packages into one design – The ESS design is constituted out of released contributions: A released contribution is defined as the currently agreed upon state of design between ESS & IKC – Without requiring in-kind partners to use a specific CAD software ESS needs current status and rapid feedback on the progress of in-kind partner designs – Civil construction of the ESS facility is well underway – ESS needs to keep up with changes in designs as soon as they are available to assess impact on civil construction – To keep track of changes, ESS uses file versioning and released revisions. 2

Contributing your designs to ESS 3 You can go to LinacLego and upload your designs, models, documents (for further information or CHESS account creation please contact

Monitoring the design integration of ESS 4 You can go to DIG home and check the latest status of the design integration (for further information or JIRA account creation please contact

End Currently we have a preliminary integrated version of our linac in our master-assembly 3D-model Still however we are missing several parts such as: -Supporting systems -Interfaces -Valves, flanges -etc. We need IKC input so as to proceed to a detailed level of the integrated 3D-model of the ESS accelerator, so as to provide back to the IKCs with proposals for: -Assembly processes -Transportation processes -Installation processes -Commissioning processes 5

SPARE SLIDE – LinacLego Organization LinacLego is used to describe the ESS lattice – It is the single-point-of-truth for tunnel components – Available on the Web The lattice is described in the following hierarchy: – Section (ISRC, LEBT, RFQ, DTL, SPK, etc…) Cell (SPK-01, SPK-02,… SPK-13) – Slot (SPK-02-LWU, SPK-02-CRM) » Beamline Element (SPK-02-LWU-QH01, SPK-02-LWU-QH02) The ESS 3-D integration model will be based on slots – Slots are considered installation sub-assemblies – Definition of a Slot is flexible – There will be one CHESS document to contain the 3-D model of each Slot design 6

SPARE SLIDE – Lattice hierarchy in LinacLego 7 LEBTISRC RFQDTLSPKMBL etc… SPK-01 … SPK-02SPK-03SPK-13 SPK-02-LWUSPK-02-CM SECTION CELL SLOT BEAMLINE ELEMENTS SPK-02-LWU-QH01, SPK-02-LWU-QH02, … Level of exchange for the CAD files between IKC-ESS