Research and development of the urine diverting toilet system in Erdos eco-town project Jun Xiao Qiang Zhu Former SEI Project Manager SEI Project Senior.

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Air Gaps, Vacuum Breaker, and Back Flow Preventers TP 8 50 min.
Advertisements

Typical Plumbing System
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
BEST PRACTICES INITIATIVES WATERLESS URINALS TIRUCHIRAPPALLI CITY CORPORATION.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
ADX 150 – Engine Repair ADX 170 – Climate Controls
JET PROPULSION Part 5 Jet Engine Operation Oil Systems.
Proposed Modifications in Boiler Feed Tank By: D K Singhal
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
Kitchen and Dining Cleaning Sr. Subbulakshmi - Housekeeper.
COMMERCIAL REFRIGERATION
Lesson 3 Planting trees helps replenish this natural resource. Advocating for a Healthy Environment How do trees benefit the environment? Turning off.
Refrigeration and Cooling Principles for Potato Storages
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Hydronic Mechanical Controls
Reciprocating pump Pumps are used to increase the energy level of water by virtue of which it can be raised to a higher level. Reciprocating pumps are.
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
Water Services Trust Fund How to use, empty and dispose content of a UDDT 8/30/20151.
AIR QUANTITY REQUIRED TO TRANSFER HEAT IN A FORCED AIR SYSTEM In all four mechanical systems considered, the transfer of heat, either by taking it out.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
Erdos Eco-Town Workshop Dongsheng Aug 31, 2007 Organised by EcoSanRes, Stockholm Environment Institute & Dongsheng Project Office.
HVAC523 Basic Subsystems.
Water Services Trust Fund How to use, empty and dispose content of a UDDT 9/9/20151.
Issues of Sanitation Definition and the MDGs. Coverage Figures According to the 2008 Ghana Demographic Health Survey (GDHS) report Only 12.4 percent of.
NATIONAL INSTITUTE OF AEROSPACE TECHNOLOGY Rosa Mª Rengel Gálvez Marina B. Gutiérrez García-Arias 11/09/2007 Rosa Mª Rengel Gálvez Marina B. Gutiérrez.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
September 2005Urban Planning Carleton University 1 Drainage Systems _____________________________.
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
Click to edit Master subtitle style 6/8/12 PORTFOLIO COMMITTEE ON WATER AND ENVIRONMENTAL AFFAIRS: IMPLEMENTATION OF WHITE PAPER ON CLIMATE CHANGE DEPARTMENT.
A bold attempt to change human behavior to the environment --- Case study of the China–Sweden Erdos Eco-town Project Qiang Zhu Jun Xiao SEI Project Senior.
Use of Dehydrates Faeces Use of Dehydrated Faeces 1 Gina S. Itchon, Xavier University.
Air Conditioning International Mechanical Code
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
Members of Finland Parliamentary Delegation Policy Approaches into Housing in South Africa Presentation by the Department of Human Settlements.
Case Study Findings Water Dialogues – South Africa Presentation for Local Dialogue 6 March 2009 Water Services in Bushbuckridge Local Municipality.
Ch. 2. Sanitation management today and in future
START START U NITED S TATES P ATENT AND T RADEMARK O FFICE Patent No.: US 6,467,101 B1 Date of Patent: Oct. 22, 2002.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
GUJARAT TECHNOLOGICAL UNIVERSITY (GTU) Mahatma Gandhi Institute Of Technical Education and Research Center, Navsari Affiliated with GTU Presentation on.
Refrigeration Systems
Unit 209: Drainage systems
Flammable Liquids Directorate of Training and Education
VENTILATION AND AIR CONDITIONING Under the Subject Industrial Safety and Environment || ||
ACTIVE SOLAR DESIGN ALTERNATIVE ENEGRY SOURCES.
Chapter 37: Fluid Containment
Desert Cooler.
Mahatma Gandhi Institute Of Technical Education & Research centre ,Navsari. A presentation on House Drainage Subject :- Environmental engineering.
FIXTURES.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
HYDRONIC HVAC: The Most Comfortable and Efficient System
Heating Ventilation and Air Conditioning
HYDRONIC HVAC: The Most Comfortable and Efficient System
Electrical Gas Plumbing Heating & Cooling
Unit 37: Fluid containment Dr
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Cryogenic System Commissioning Summary Report
Presentation transcript:

Research and development of the urine diverting toilet system in Erdos eco-town project Jun Xiao Qiang Zhu Former SEI Project Manager SEI Project Senior Advisor Erdos Eco-Town Project, Erdos , Inner Mongolia, China

Background China-Sweden Erdos Eco-town Project (EETP) is part of the EcoSanRes Programme funded by the Swedish International Development Agency (Sida) and technically supported by the Stockholm Environment Institute (SEI). The Project aims at sanitizing and recycling all the wastes from households in urban areas. It is an ambitious attempt to generate the data, technologies and policies required to bring about a major change in the way urban settlements relate to the environment

Physical features of EETP Forty-two 4-5 story buildings equipped with urine diversion eco-toilet; 832 households with population of 2900; GRW and urine piping and 22 urine tanks close to the buildings.

Criteria for the eco-toilet design in EETP The eco-toilet system is a key component of the ecosan system of EETP. The ecosan approach is based on source separation, containment, sanitization and recycling. In addition to them, the following criteria have been followed under the specific conditions of EETP: - Suitable for 4 and 5 storey building; - Easy to use and maintain; - Convenient to the users; - Affordable to the households and the community

Composition of feces system Urine diversion eco-toilet Feces drop chute Feces bin and bin cover Ventilation system

Toilet section Turning feces bowl Urine hole Stainless cylinder Sawdust dispenser PVC Feces chute Sawdust trough Sawdust tank Toilet

Original toilet design Bowl under feces hole Urine hole Pushed rod for turning bowl Sawdust button Sawdust tank

Feces bowl and turning mechnizm Upside down bowl when not in use Push rod Cylinder supporting bowl Spring for re-position bowl

Feces bin and bin cover Feces chute Bin cover Feces bin Basement

Composition of urine system Urinal Urine pipe system inside and outside of building Urine tank

Ventilation system – Fan: equipped in the basement for four households; – Vent duct extending to above the roof; – Vent branch pipe connected with each bin; – Regulation valve; – The chute, bin and bin cover is parts of the vent system.

Improvement for the toilet system during operation The households have strongly complained the odor problem, reasons for which are: Feces caused odor - Imperfectness of the toilet design; - Improper arrangement of the branch pipe; - Inadequate capacity of the fan; - Poor sealing performance of the bin cover. Urine caused odor: mainly due to bad quality of installation of urine system - Top cover of urine tank and outlet of the drainage pipe had not been sealed; - “S” trap was not installed under urinal; - No odor isolator at the urine hole of toilet.

Two ways of arrangement of the vent pipe – Branch pipe connected with the bin cover or the sealed cabinet; – Branch pipe connected with the feces chute. Axial fan Centrifugal fan In the latte case, plastic bag, tissue and other objects are easy to be sucked into the vent pipe. So it will be changed into the first way. Axial fan will be changed into that with bigger capacity in the 1 #- 4 # buildings. Chute Feces bin Vent pipe

Feces bin is changed to sealed cabinet O&M in the past years showed that the sealing performance of the bin cover is not good enough. A trial of replacing the bin covers with sealed cabins showed good result. Up to now, 51 basements have been provided with the sealed cabins.

Improvement of the vent piping has balanced the air pressure in the four bins and reduced the energy loss Regulation valve being cancelled

Diversified design of the toilet for households with different preferences – New turning mechanism has been designed. When the toilet lid is lifted up, a lever system is driven to turn the bowl. – Another design is to cancel the turning bowl. A movable plate will seal the feces hole and will be removed when the toilet is in use. When the households want to change the existing toilet, SEI will pay most part of cost but the household has to pay part of the cost. Most households select to keep the original toilet.

Seal the urine tank The ammonia gas being sucked into the toilet room through drainage pipe is the main reason of odour. To solve the problem, outlet of the urine drainage pipe has been put into a vessel placed at the tank bottom. Urine drainage Vessel Quick coupling Sealed cover Suction pipe

Isolate urine system from toilet room: “S” trap is installed under urinal Develop odor prevention device for sealing the urine hole in the toilet. Paraffin oil is used for isolation..

Improper use of the eco-toilet by the households is also one of the important reasons causing odour. Pouring too much water into the toilet worsens the smell problem. The project team has strengthened promotion of the households to help them understand better the significance of eco-toilet and the correct way of using toilet by frequently visiting households and distributing brochures and materials.

After taking the above measures, the odor problem has been much mitigated. According to two questionnaire investigations taken place in January and April 2007, respectively, answer to “no odor in the toilet room” increased from 33% to 49%. Tests showed ammonia concentration in the toilet room reduced by 7.8% to 78.1% from October 2006 to June Complain from households has also been decreased significantly

The acceptance of the eco-toilet by the inhabitants still remains problem. Many households are willing to have a flushing toilet instead of the dry eco-toilet, which they think is a backward technique to the modern civilization. Even their toilet rooms are free of bad smell and also even water supply happens frequently owing to the serious water shortage, many households hope to change the dry toilet into water- borne one. The eco-toilet in an urban setting is a complete new technology that needs decades to develop and improve. However, to change people’s mind of preferring a “comfortable” “flush and discharge” toilet to a new toilet concept of environment protection and water resources needs longer time and hard efforts.

Conclusion – the main experiences in toilet development in EETP – A well designed and installed ventilation system can avoid odor problem from the faces system. The essential points of the vent system are: fan’s capacity can change the air in the toilet room at least 1.5 times per hour, well arrangement of the vent piping, and a sealed containment for the faeces bin. – Toilet design should be diversified to meet different preferences of the households. – To avoid escaping of nitrogen in the urine, ventilation for urine system is not suggested. To avoid odor, measures for sealing of urine system and separation of urine from the air are the feasible choices.

Thank you!