Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Construction Contracting
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
Contract CloseOut.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Construction Engineering 221 Cost Estimating and Bidding II.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Professional Construction Management
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Chapter18 Contract Construction 1CE 417, King Saud University.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
The Risks and Rewards of Contractor Bids and Proposals.
Construction process Types of contracts Halmstad University Construction management Piotr Mazur Paulina Wawryca Paweł Bilski.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
V-Cost Estimation 1.Costs Associated with Constructed Facilities
Construction Engineering 221 Cost Estimating and Bidding.
Understanding The Benefits Of Surety Bonds. What is Surety Bonding? Surety ObligeePrincipal.
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
Construction Engineering Management Project Costing
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Chapter 1 Introduction.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Construction Contracts and Project Delivery Methods
CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.
S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University.
CIVL202 Construction Engineering I Tutorial 5 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
BCN 4708 Fall 2008 Chapter 4 Drawings and Specifications.
Chapter 2 Introduction to Construction Procedures
CONSTRUCTION CONTRACTS DOCUEMENTS
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Construction “Meet & Greet” Tuesday, July 24, 2012 Purchasing / Facilities Management.
Chapter 13 Estimates for Remodeling Work
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
MARKETING THE LANDSCAPE BUSINESS MS. GRIPSHOVER LANDSCAPING UNIT 4.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Welcome Screen 2013 Educational Session 1 What is New With the Consultant Selection Process FAA AC 150/ e CHANGE 1 Jon Faucher Vice President.
Estimating Project Costs
9/18/2018 Bids CONTRACTING Khamis…..
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
CIVL 493 CONSTRUCTION MANAGEMENT
Traditional Steps Leading To A Bid Document
Manajemen Konstruksi Bidding & Award
Presentation transcript:

Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008

Estimating and Bidding Estimating process Estimating process Determine labor, material and equipment needs Determine labor, material and equipment needs How much subcontracting? How much subcontracting? Assign prices to quantities Assign prices to quantities Add in: indirect costs, overhead and profit Add in: indirect costs, overhead and profit ASPE ASPE AACE AACE

Estimating and Bidding Lump-sum Estimates Lump-sum Estimates Unit-price Estimates Unit-price Estimates Approximate Estimates p.79 Approximate Estimates p.79 Cost-per Function Cost-per Function Area Cost Estimate Area Cost Estimate Volumetric Cost Estimate Volumetric Cost Estimate Modular Takeoff Estimate Modular Takeoff Estimate Partial Takeoff Estimate Partial Takeoff Estimate Panel Unit Cost Estimate Panel Unit Cost Estimate Parameter Cost Estimate Parameter Cost Estimate

Estimating and Bidding Bidding Procedures Bidding Procedures Private Private Public Public Advertisement for Bids Advertisement for Bids Private Private Public Public Reporting services Reporting services

Estimating and Bidding Decision to Bid Decision to Bid Set-Asides Set-Asides Qualification Qualification Deposits Deposits Availability of Plans and Specs Availability of Plans and Specs Bidding Period Bidding Period Instruction to Bidders Instruction to Bidders Preliminary conditions Preliminary conditions Jobsite Visit Jobsite Visit Bid invitations Bid invitations

Estimating and Bidding Quantity Surveys / Takeoffs Quantity Surveys / Takeoffs Architect / engineer Architect / engineer Contractor Contractor Professional Quantity Surveyors Professional Quantity Surveyors Cost Summaries fig 5.4 / 5.5 Cost Summaries fig 5.4 / 5.5 Material costs Material costs Direct labor cost Direct labor cost Indirect labor costs Indirect labor costs

Estimating and Bidding Equipment Costs Equipment Costs Equipment Expense Equipment Expense Equipment Rates Equipment Rates Ownership and Operating Costs Ownership and Operating Costs A = C(n+1) + S(n-1) / 2n A = C(n+1) + S(n-1) / 2n Equipment production rates Equipment production rates

Estimating and Bidding Subcontractor bids Subcontractor bids Bid Depositories Bid Depositories Allowances Allowances Overhead Overhead General Overhead General Overhead Project Time Schedule Project Time Schedule Markup 5 – 20 Markup 5 – 20

Estimating and Bidding Lump-sum Recap Sheet Lump-sum Recap Sheet Bid Changes Bid Changes Change sheet Change sheet Unit price recap sheet Unit price recap sheet Factor Factor Contract Bond Contract Bond Surety Surety Performance or payment bond Performance or payment bond Addenda Addenda

Estimating and Bidding Scope Bidding Scope Bidding Computer-Based Estimating Computer-Based Estimating Range estimating Range estimating