“Helmholtz” Capture Solenoid Mechanical Structure Calculations Peter Loveridge STFC Rutherford Appleton Laboratory, UK July 2008.

Slides:



Advertisements
Similar presentations
1 By Terence James Haydock Pressure Vessel A simulated response in ANSYS.
Advertisements

Structural Mechanics 4 Shear Force, Bending Moment and Deflection of Beams 20 kN RA RB 3.00m 2.00m.
Beams Extremely common structural element
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK November-2008.
Vacuum Vessel Production Readiness Review
Forces in the Capture Solenoid Peter Loveridge STFC Rutherford Appleton Laboratory, UK
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Preliminary Analysis of the Target System Magnets 1.Version with a 6-T copper magnet insert 2.Version with a 6-T high-temperature superconductor insert.
Status of the Coil Structure Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: UCSD: S. Malang, A.R. Raffray PPPL: H.M. Fan.
Status of Coil Structural Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: ORNL: D. Williamson UCSD: S. Malang, A.R. Raffray.
-1- ICST/HIT The 23 rd MICE Collaboration Meeting Jan.13 to 17, Harbin/China MICE/MuCool Coupling Magnets Vacuum Vessel Design Guo, Xinglong.
Home Work #4 Due Date: 18 Mar, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on A4.
Stellarator magnets L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting March 8-9, 2004.
Helmholtz Capture Solenoid Update Peter Loveridge STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target.
Contact Stress (3.19) MAE 316 – Strength of Mechanical Components
Home Work #7 Due Date:29 April, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on single-side.
PROBLEM-1 State of stress at a point is represented by the element shown. Determine the state of stress at the point on another element orientated 30
PIPE FEA USING ANSYS.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Zhiwen Zhao (UVa), Paul Reimer (ANL) SoLID Collboration Meeting 2013/03.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Poisson’s Ratio For a slender bar subjected to axial loading:
Cavity support scheme options Thomas Jones 25/06/15.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
Sag of ZTF components Callahan 9/4/2014. Corrector Trim Plate analysis.
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
ANSYS Structural Analyses of sPhenix Magnet Coil at Full Current John Cozzolino July 10,
Poisson’s Ratio For a slender bar subjected to axial loading:
CHAPTER OBJECTIVES Analyze the stress developed in thin-walled pressure vessels Review the stress analysis developed in previous chapters regarding axial.
First calculations of the CLIC Antisolenoid system A. Bartalesi, M. Modena - CERN.
Support and magnet coil KEK Hiroshi Yamaoka Nov. 10, ‘04.
Magnets and Supports Bob Wands October 20, 2006 PPD/MD/Engineering Analysis Group Fermilab 4 th Concept Detector at Fermilab October, 2006.
Eddy current modelling for ILC target ILC meeting 31 st Jan- 3 rd Feb 2007 IHEP-Beijing James Rochford.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Task 2.2 – Identification of most suitable face-sheets and optimization of panel properties Duration: month 1 to month 12 Partners involved: MOTULAB (WP.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
Twin Solenoid Study Infinite and Short Models. Infinitive Twin Solenoid Induction in the Detector area B d = µ 0 (i d -i a ) with radius R d Induction.
Lecture # 21 This chapter serves as a review of the stress analysis that has been developed in the previous chapters regarding axial load, torsion, bending.
COMBINED LOADING.  Analyze the stress developed in thin-walled pressure vessels  Review the stress analysis developed in previous chapters regarding.
S. Lassiter, P. Brindza, M. Fowler, E. Sun - Jefferson Lab G. Markham - NovaTech, B. Wands - Fermi Lab Abstract—Jefferson Laboratory is developing a set.
Global Design Effort Magnetic and Mechanical FEA of SiD IRENG07 Bob Wands September 18, 2007.
Cavity support scheme options Thomas Jones 25/06/15 1.
Beam Design Beams are designed to safely support the design loads.
AWB NSTX TF Flag Joint Design Review April 10, 2003 Art Brooks.
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
3/5/2008, A Lee1 A Preliminary Result for a Helical Tube Subjected to the Internal Pressure Ang Lee, PPD/MD March 5,2008.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Mechanics of Solids (M2H321546)
ISIS TS1 Project: Target Design and Analysis
The Thick Walled Cylinder
TQS Structure Design and Modeling
Design of a Transmission Shaft
Poisson’s Ratio For a slender bar subjected to axial loading:
SQXF Mirror QXFSM1 Strain Gauges
DEPARTMENT OF MECHANICAL AND MANUFACTURING ENGINEERING
Peter Loveridge High Power Targets Group
Mechanical Modelling of the PSI CD1 Dipole
STUDIES TOWARDS TARGET-HORN INTEGRATION Institute of Applied Mechanics
Poisson’s Ratio For a slender bar subjected to axial loading:
Structural analysis of the CBM magnet coil
326MAE (Stress and Dynamic Analysis) 340MAE (Extended Stress and Dynamic Analysis)
Tutorial in Mechanical Properties
Update on Fracture Analyses
Poisson’s Ratio For a slender bar subjected to axial loading:
Copyright ©2014 Pearson Education, All Rights Reserved
Magnet design, field calculations
Presentation transcript:

“Helmholtz” Capture Solenoid Mechanical Structure Calculations Peter Loveridge STFC Rutherford Appleton Laboratory, UK July 2008

Peter Loveridge, July 2008 Objectives Using the magnetic forces calculated previously... Evaluate the approximate dimensions of the magnet mechanical structure components in the cases where: 1.A fully open Helmholtz gap is required (compatible for a target wheel WITH spokes) 2.The Helmholtz gap is filled with structure material with the exception of a bridging structure across two short unsupported lengths (compatible with a SPOKELESS target wheel) Is the required structure volume compatible with coil/target geometry?

Peter Loveridge, July 2008 Recap: Magnetic Forces P R2 R1

Peter Loveridge, July 2008 Recap: Magnetic Forces P R2 R1 Consider how to support axial loads on coil “SC01”

Peter Loveridge, July 2008 Fully Open Gap: Plate Bending b a t P = FZ / A RbRb RaRa Hand calculation based on flat plate theory... Limit max bending stress in steel plate to, say, 150 MPa: –Plate thickness = 286 mm –Max plate deflection = 0.2 mm

Peter Loveridge, July 2008 Fully Open Gap: Tensile Retaining Loads P = FZ / A RbRb RaRa t wo t wi L = 903 mm Envisage a retaining structure composed of two cylinders... From flat plate calculation we know: –Outer reaction (R a ) = 93.7 MN/360˚ –Inner reaction (R b ) = 70.0 MN/360˚ Limit max tensile stress in steel retaining structure to, say, 150 MPa: –t wo = 76 mm –t wi = 130 mm –Elongation

Peter Loveridge, July 2008 Fully Open Gap: ANSYS Mechanical Simulation 180˚ Geometry ExpansionAxial Deflection Plot 0 mm1.2 mm Von-Mises Stress Plot 0 MPa270 MPa Axi-symmetic Mesh 76 mm thick outer cylinder 130 mm thick inner cylinder286 mm thick end plate

Peter Loveridge, July 2008 Interpretation: Target wheel WITH spokes Target station geometry: –Need to maintain an open axial gap over a significant part of the circumference –Huge axial forces must be transferred out to an external structure Coils at 4.2K, external structure at room-temperature ?! Structure Calculations: –Hand calculations –confirmation by FEA Results: –The volume of structural material required looks extremely prohibitive (see right). Insufficient radial space between NC and SC coils Helmholtz gap filled with structure Coil geometry with required structure volume to maintain a fully open axial gap (drawn to scale) Comments: –Major geometry interference issues to resolve (coils, structure, target-access) –On first investigation the structure requirements for this option do not seem feasible! –NOTE: Have only considered the axial force balance. What about radial forces!

Peter Loveridge, July 2008 Bridging Structure: Plate bending Hand Calculation for a plate bridging a short unsupported length... Consider a simply-supported rectangular plate –Dimensions W x L x t –Subject to same uniform pressure P Limit max bending stress in steel plate to, say, 150 MPa: –Plate thickness = 170 mm –Max plate deflection = 0.2 mm L W t

Peter Loveridge, July 2008 Interpretation: SPOKELESS target wheel Coil geometry with required structure volume to bridge a short unsupported length (drawn to scale) Target station geometry: –The Helmholtz gap is filled with structure material with the exception of bridging sections across two short unsupported lengths –Huge axial forces are “internally balanced” (in same way as study-2 magnet) Structure Calculations: –Preliminary hand calculations only –Assumptions yet to be confirmed by FEA Results: –A significant volume of bridging structure material in “Helmholtz gap” region (see right) Current (400 mm) gap appears insufficient Comments: –Reoptimisation of geometry will be required (coils, structure, target-access) ~600 mm Helmholtz gap? Is this feasible? –Structure calculations for this option should be taken further –NOTE: Have only considered the axial force balance. What about radial forces!