Wind Power Forecasting 14.10.2011 Indian Wind Turbine Manufacturer's Association.

Slides:



Advertisements
Similar presentations
The Single Electricity Market in Ireland
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Load Forecasting Eugene Feinberg Applied Math & Statistics Stony Brook University NSF workshop, November 3-4, 2003.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
2 1 Modeling Extreme Low-Wind-Speed Events for Large-Scale Wind Power Stephen Rose, Mark Handschy, Jay Apt June 23, 2014.
Cao Xiao September, 2013 Wind Power Forecasting. 2 C urrent situation of forecast technology Key technology of forecast Forecast principle of wind power.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
World Renewable Energy Forum May 15-17, 2012 Dr. James Hall.
EWEC 02/2006 Dr.-Ing. Kurt Rohrig Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel e. V. Introduction.
Workshop on HIW-THORPEX Legacy Project – 18/03/ Forecasts for renewable energy and disaster management Renate Hagedorn Scientific and Operational.
Wind Power Analysis Using Non-Standard Statistical Models
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Application of a Multi-Scheme Ensemble Prediction System for Wind Power Forecasting in Ireland.
Energy Storage Need & Relevance under Climate Change mitigation efforts for India 1 1 Rajsekhar Budhavarapu (Head – Wind Business & CTO- Renewable Investments)
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Wolf-Gerrit Früh Christina Skittides With support from SgurrEnergy Preliminary assessment of wind climate fluctuations and use of Dynamical Systems Theory.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Review of EDC Solar Long- term Financing Program Analysis January 12, 2012 Center for Energy, Economic, and Environmental Policy DRAFT.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Energie braucht Impulse Immediate Horizontal Wind Energy Exchange between TSOs in Germany since September 2004 Practical Experiences EWEC 2006, 28 February.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
Renewables and System Services Ann Scully.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Review of SONI Power System Operations Alex Baird Grid Operations Manager Real Time.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
1 Open University Integrating Renewables Conference 24 January 2006 Wind power on the grid… What happens when the wind stops blowing? David Milborrow
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Cao Xiao September, 2013 Wind Power Forecasting Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect.
Renewable Regulatory Fund (RRF):- Implementation Mechanism
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Introduction to Weather Forecasting Spring 2016 Kyle Imhoff.
Wind Production intermittency Cross border compensation: what to expect in Western Europe? Analysis of Winter 2010/2011 Hubert Flocard and Jean-Pierre.
Mirae Energy Asia Corporation (MAEC) Pursuant to RA 9513 or the Renewable Energy Act of 2008, Mirae Energy Asia Corporation was established and registered.
Operation and Control Strategy of PV/WTG/EU Hybrid Electric Power System Using Neural Networks Faculty of Engineering, Elminia University, Elminia, Egypt.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
Indicators for Climate Change over Mauritius Mr. P Booneeady Pr. SDDV Rughooputh.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
CUSC Panel – 19th July 2016 Binoy dharsi
Economic Operation of Power Systems
Congestion regulations
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Data management: 10 minute data, 8760 hours Data Q/C, error checking
EU-IPA12/CS02 Development of the Renewable Energy Sector
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
Wind Energy Potential in Europe: 2020 – 2030
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Wind Power Forecasting Indian Wind Turbine Manufacturer's Association

OUTLINE  Recap IEGC Stipulations  Infrastructure to be set up for forecasting  External issues that affect forecast accuracy  Limitations of the mathematical models used  Current Status of forecasting efforts by industry  Normalization of results  Some Definitions  Brief Analysis  What is expected from SLDC Indian Wind Turbine Manufacturer's Association

Recap IEGC Stipulations Central Electricity Regulatory Commission Proponent 28 April 2010 Date of Notification Major Features Effective from 3 rd May 2010 Scheduling is a must for wind w.e.f to help increase variable component of grid power. Basically is to make wind and solar generators responsible for grid discipline. Will also facilitate Interstate transaction of Wind and Solar through Open Access Route. This provision shall be applicable for new wind/solar farms with collective capacity of 10 MW and above connected at connection point of 33 KV level and above, who have yet to sign a PPA with states or others Revision of Schedule by wind and solar power generating stations shall be effective from 6th time-block, the first being the time –block in which notice was given. There may be maximum of 8 revisions for each 3 hour time slot starting from 00:00 hours during the day. Indian Wind Turbine Manufacturer's Association

Recap IEGC Stipulations Implications The wind and solar generators shall be responsible for forecasting their generation up to an accuracy of 70%. If the actual generation is beyond ±30% of the schedule, wind/solar generators have to bear UI charges. Within ± 30%, the State which purchases power from the wind generators shall bear the UI charges for this variation. However, the UI charges borne by the State/s due to the wind/Solar generation, shall be shared among all the States of the country in the ratio of their peak demands on a monthly basis, in the form of a regulatory charge known as the Renewable Regulatory charge for wind/solar energy. Renewable Regulatory Fund (RRF) The RRF shall be maintained and operated by the National Load Despatch Centre on the lines of UI Pool Account at the Regional level. Scheduling = 70% accuracy Max. Generation Allowed = 150% of the schedule in a time block, over generation will be corresponding to Hz Variation allowed = ± 30% For Intra State Transaction = Contracted Details & Rate should be informed to -> RPC/RLDC through respective SLDC For Inter States Transaction = Contracted Details & Rate should be informed to -> RLDC/NLDC through respective RPC Indian Wind Turbine Manufacturer's Association

CASE-1 Gen Sch. (MW) = 100 Act. Gen. (MW) = 120 State pays to WF for CR State pays to RRF for difference (UI-CR) OR State receive from RRF for difference i.e (CR-UI) *Host State also receive from RRF the (UI-UI cap rate) CASE-2 Gen Sch. (MW) = 100 Act. Gen. (MW) = 80 State pays to WF for CR State receive from RRF for difference of (UI- CR) OR State pays to RRF for difference of (CR-UI) *Host State also receive from RRF the Additional UI CASE-3 Gen Sch. (MW) = 100 Act. Gen. (MW) = 140 State pays to WF for CR State pays to RRF for difference (UI-CR) OR State receive from RRF for difference i.e. (CR-UI) State pays to WF for difference (UI-CR) OR State receive from WF for difference (CR-UI ) *Host State also receive from RRF the (UI-UI cap rate) CASE-4 Gen Sch. (MW) = 100 Act. Gen. (MW) = 60 State pays to WF for CR State receive from RRF for difference (UI-CR) OR State pays to RRF for difference i.e. (CR-UI) WF pays to Host State for difference (UI-CR) OR WF receive from Host State for difference (CR-UI) *Host State also receive from RRF the Additional UI CASE-5 Gen Sch. (MW) = 100 Act. Gen. (MW) = 160 State pays to WF for CR State pays to (UI rate corresponding to Hz. For 10MW State pays to RRF for difference (UI-CR) OR State receive from RRF for difference (CR-UI) State pays to WF for difference (UI-CR) OR State receive from WF for difference (CR-UI) *Host State also receive from RRF the (UI-UI cap rate) Commercial Settlement for Wind generation – Cases (Intra State) Gen Sch. - Generation ScheduleWF- Wind Farm Act. Gen – Actual GenerationRRF - Renewable Regulatory Fund CR - Contracted Rate* Conditions UI- CR if UI is greater than CR UI - Unscheduled Interchange CR-UI if CR is greater than UI Indian Wind Turbine Manufacturer's Association

CASE-1 Gen Sch. (MW) = 100 Act. Gen. (MW) = 120 Purchasing State pays to WF for CR Purchasing State Receive from RRF UI rate of its region Host State pays to RRF rate of Host Region *Host State receive from cap rate) CASE-2 Gen Sch. (MW) = 100 Act. Gen. (MW) = 80 Purchasing State pays to WF for CR Purchasing State pays to RRF UI rate of its region Host State receive from RRF rate of Host Region *Host State receive from Additional UI CASE-3 Gen Sch. (MW) = 100 Act. Gen. (MW) = 140 Purchasing State pays to WF Purchasing State receive from RRF UI rate of its region WF receive from RRF (10MW)(UI-CR) OR WF pays to RRF (10MW)(CR-UI) Host State pays to rate of Host State Host State pays regional UI rate *Host State receive from cap rate) CASE-4 Gen Sch. (MW) = 100 Act. Gen. (MW) = 60 Purchasing State pays to WF Purchasing State Pays to RRF UI rate of its region WF pays to RRF(10MW)(UI-CR) OR WF receive from RRF(10MW)(CR-UI) Host State receive from RRF rate of its Region *Host State receive from Additional UI CASE-5 Gen Sch. (MW) = 100 Act. Gen. (MW) = 160 Purchasing State pays to WF Purchasing State Receive from RRF UI rate of its region Host State pays to RRF rate of Host Region Host State pays to rate of Host (CR-UI) WF receive from RRF (20MW)(UI-CR) OR WF pays to RRF (20MW)(CR-UI) WF receive from Host State UI rate corresponding to Frequency range( ) *Host State receive from cap rate) Commercial Settlement for Wind generation – Cases (Inter State) Gen Sch. - Generation ScheduleWF- Wind Farm Act. Gen – Actual GenerationRRF - Renewable Regulatory Fund CR - Contracted Rate* Conditions UI- CR if UI is greater than CR UI - Unscheduled Interchange CR-UI if CR is greater than UI Indian Wind Turbine Manufacturer's Association

External issues that affect forecast accuracy  Numeric Weather Prediction (NWP) results to be used – Has a huge impact on forecasting accuracy –A lot depends on initialisation data accuracy and the model used.  Geographical spread of wind farms – Wind farm terrain topology – Surface roughness – Climatic and Weather regime – Wind pattern (seasonal and diurnal)  Forecast performance related to generation – Time horizon (especially for short-term) – Quality of generation & met data from the plant – Sensitivity of a forecast to initialization errors – Turbine availability – Timely data transfer  Forecast Model – What models (short-term and long-term) are best for forecasting wind energy – Different computational schemes can give rise to rather heterogeneous results and highly temporal in nature. Indian Wind Turbine Manufacturer's Association

Limitations of the mathematical models  The model initialization depends on lots of weather data assimilated from a variety of sources and these inputs may have considerable uncertainties.  The input data for the global data sets have regional issues with regard to the quality and density ( for example IMD for India)  The GFS uses dense gridded data sets for Europe/US where as Indian data sets are sparsely distributed across the wind farming areas.  Outputs obtained with such divergent data inputs will obviously have much uncertainty. Indian Wind Turbine Manufacturer's Association

Typical Infrastructure needed Indian Wind Turbine Manufacturer's Association

Wind farm connectivity It is essential to have dedicated connectivity for data access on a 24 x 7 basis. Dedicated bandwidth can be only on leased lines or via VSATs and these are not easy to provide in remote areas. The availability of communication channels cannot be controlled easily. Frequent breaks can cause considerable confusion in model training which assumes that the input data is based on 100% availability. Indian Wind Turbine Manufacturer's Association

 IT Infrastructure  Notwithstanding use of latest communication technologies our experience is:  VSAT connectivity breakdowns frequently particularly during monsoons  10 to 15 % of turbine population are off link via satellite or leased lines or RF.  Link to Forecast server also suffers from similar communication down times.  V-Sat or other means of communication cannot be done on shared bandwidths. Challenges Indian Wind Turbine Manufacturer's Association

Service providers active in India Sr.No.ParticularsGL- GHAWS3_TIERMeteologica 1OfficeIndia /UKIndia/USA Spain 2Forecast Global33 GW14 GW43 GW48 GW 3Forecasting in IndiaYes 4Historic DataYes 5Data Transfer/ RetrivalFTP 6Day ahead forecast 24/48 hrs horizonYes 7 Accuracy Measurement (% AE) every 15 mins. Yes 8% AENot assuredNot Assured 9Financial LiabilityNot taken Indian Wind Turbine Manufacturer's Association

Wind Speed forecasts Indian Wind Turbine Manufacturer's Association The plot (forecast v/s actual wind speeds) shows that scatter is considerable over operational wind speed ranges. This consequently introduces considerable uncertainty in the estimate of power.

Forecast Error: Indian Wind Turbine Manufacturer's Association IEGC’s implied computation of % error in forecast

Current Status – EIL,Gamesa,Regen,Suzlon,Vestas A A B B IWTMA has sponsored Forecasting for 100 MW. All major players are also individually exploring Implementation. Suzlon and Enercon India have been experimenting since There have been issues with continuity and data feed. Practical problems about input data capture are far more serious than popular perception C C Being a highly complex &scientific exercise, services are sought from experienced Forecast service providers. Indian Wind Turbine Manufacturer's Association

Pilot Forecasting in four states TN 98 MW GJ MW MH 25.5 MW KA 50 MW ALL INDIA TOTAL MW Indian Wind Turbine Manufacturer's Association

1 1 ENERCON (INDIA) LIMITED Enercon (India) Limited 1. Initiated Forecasting1st Jan Locations Samana Presently MW Pushpathur ( Presently : 50.4 MW ) : 1st August 2010:- IWTMA Samana 400 MW forecast exercises started from July/August, Service ProviderGL Garrad Hassan & Meteologica GAMESA Gamesa 1. Initiated ForecastingDec Location Theni (Tamil Nadu) MW Forecast now available for 3 Wind Farms 3. Service ProviderWebMEGA 2 2 Indian Wind Turbine Manufacturer's Association

RE -GEN Re- Gen 1. Initiated Forecasting1st Jan Location Bhud Project ( Maharashtra) 17 * 1.5MW = 25.5 MW 3. Service Provider3-TIER 3 3 SUZLON Suzlon 1. Initiated ForecastingMay LocationSuthri, Gujarat 250MW 3. Service ProviderGL- GH 4 4 Indian Wind Turbine Manufacturer's Association

VESTAS Vestas 1. Initiated ForecastingFeb Locations Break up Gujarat 25 * 1.65MW = MW 3. Service Provider3-TIER 5 5 Indian Wind Turbine Manufacturer's Association

IWTMA 1.Initiated ForecastingMay Locations Pushpathur, Tamilnadu 50.4 MW EIL Gadag, Karnataka – 50 MW - Suzlon 3.Service ProviderGL- GH 6 6 Indian Wind Turbine Manufacturer's Association

21 Forecasts Forecast Horizon – 24 Hours Results and Implications Indian Wind Turbine Manufacturer's Association

Interval EnerconGamesaVestasSuzlon +/- 30%33.19% % to +50%17.08% % to +100%37.36% % to -50%4.40% % to -100%4.70% > -100%3.19% Forecast Horizon -24 hrs ahead – Low wind season – April 11 Indian Wind Turbine Manufacturer's Association EnerconGamesaVestasSuzlon (oct)

July 2011 Interval EnerconVestas +/- 30%28.0%29.1% +30% to +50%16.1%3.02% +50% to +100%38.0%1.51% -30% to -50%2.0%9.23% -50% to -100%3.0%15.4% > -100%13.0%41.6% June 2011 Interval GamesaSuzlon +/- 30%64% % to +50%15.65% % to +100%17.1% % to -50%2.22% % to -100%0.9%16.32 > -100%2.03%1.35 Forecast Horizon 24 hrs – High wind season – June /July 11 Indian Wind Turbine Manufacturer's Association

August 2011 Interval Meteologica +/- 30%40.59% +30% to +50%12.90% +50% to +100%19.62% -30% to -50%4.16% -50% to -100%7.90% > -100%11.69% August- September 2011 Interval GL-GH +/- 30%33.20% +30% to +50%17.40% +50% to +100%38.00% -30% to -50%2.76% -50% to -100%3.25% > -100%5.50% Forecast – EIL – August / Sept 11 – Metelogica & GL-GH - 400MW Indian Wind Turbine Manufacturer's Association

Observations The instances of forecast being within ±30% was high from May to August. The instances of forecast being within ± 30% was very poor during October to March Larger wind farms geographically spread out gives a good averaging ‘Model training’ takes much longer Unexpected grid outages reduces the forecast accuracy Results and Implications Indian Wind Turbine Manufacturer's Association

Forecast quality – external and internal influences Forecast quality depends on many external and internal factors many of which are changing over time. External factors ▫ Chosen NWP outputs – strong influence on uncertainty ▫ Breaks in IT service Internal factors ▫ Wind farm modeling ▫ Unscheduled outages of grid and WT ▫ Model training based on breaks in input data ▫ Influence of monsoon on the model training Indian Wind Turbine Manufacturer's Association

ISSUES & CONCERNS Customers / Financing Institutions wants more clarification on How do we model the UI implications in cash flow of investors today? Customers and financing institutions are demanding more clarity on potential UI risk How is the UI implication at the inter-connection point going to be apportioned to individual customers within the same wind farm? If one (or more) customer opts to give forecast separately for his group of turbines, how will LDC receive and act on this information? It is absolutely important that we are able to represent the financial implications of scheduling with supporting data to prospective customers and their financing institutions Else, investors will shy away from wind sector Indian Wind Turbine Manufacturer's Association

Operational issues to be tackled Indian Wind Turbine Manufacturer's Association The industry is gearing up to providing forecasts from January 1 st, 2012 at fully operational wind farms that come on stream as per IEGC. The following operational issues need to be addressed: Establishing the continuous data communication from site to SLDC server. Clarity needed on data transfer to SLDC - preferred means FTP Establish ground rules for dispute resolution arising out of set procedures. Though wind and solar energy plants have a ‘must run’ status, they are asked to back down to maintain grid stability. Commercial implications to be addressed.

THANK YOU !! Indian Wind Turbine Manufacturer's Association