Capacity Valuation.

Slides:



Advertisements
Similar presentations
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Advertisements

ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
På väg mot en elförsörjning baserad på enbart förnybar el i Sverige En studie om behov av reglerkraft och överföringskapacitet Version 4.0 Lennart Söder.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
RESOURCE VALUATION 1. Summary of Resource Value Guiding principles: 1.Capture saturation effects on resource value 2.Evaluate resource value on a marginal.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
Reinsurance Presentation Example 2003 CAS Research Working Party: Executive Level Decision Making using DFA Raju Bohra, FCAS, ARe.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Renewable Net Short.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
Value of Solar Tariff Will it work in Washington State? Ahlmahz Negash
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J DG Valuation ─ Lessons from the APS Distributed.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
RELIABILITY and RENEWABLES: Two Case Studies Using the SuperOPF Tim Mount Department of Applied Economics and Management Cornell University
Avoided Costs of Generation
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
ENERGY CENTER State Utility Forecasting Group (SUFG) Alternative Resources and Energy Capacity Presented by: Douglas J. Gotham Purdue University Presented.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Proposal to update default solar NQCs (R , Phase 2) Resource Adequacy Workshop January 25, 2011.
SOUTHERN CALIFORNIA EDISON SM REC cost estimation April 23, 2010 Eric Lavik.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
RETI Workshop March 16, 2015 Arne Olson, Partner Lakshmi Alagappan, Sr. Managing Consultant Identifying High Value Renewable Resources.
Understanding Value of Short-Duration Resources CPUC RA Workshop March 5, 2016.
CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla,
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
WECC 2026 Common Case Capacity Assessment with RECAP
EU-IPA12/CS02 Development of the Renewable Energy Sector
Mid-Continent Area Power Pool
2500 R Midtown Sacramento Municipal Utility District
Technical Committee Meeting January 27, 2012
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Capacity Valuation

+ + − − + = Summary RPS Calculator Valuation Framework A primary component in the Net Market Value (NMV) calculation used to rank competing resources Reflects the value associated with a resource’s ability to avoid conventional capacity Version 6.0 now utilizes ELCC values versus fixed NQC values in Version 2.0-5.0 + Levelized Cost of Energy + Transmission Cost − Capacity Value − Energy Value + Integration Cost* = Net Resource Cost *Not currently quantified in RPS Calculator

Major Updates to RPS Calculator Methodology used to value output of renewable generation captures declining returns to scale, allowing for better analysis of high penetrations Version 2.0 - 5.0 Capacity value attributed to renewable resources based on static assumptions Avoided cost of capacity valued at cost of new entry Value based only on snapshot in 2020 Version 6.0 Capacity value evaluated endogenously in each year based on other renewable resources in portfolio Avoided cost of capacity calculated based on load-resource balance Value streams calculated based on lifecycle impact to ratepayers

Goals for New Methodology Model Functionality Versions 2-5 Version 6 Differentiate capacity value between renewable resources  Dynamic methodology that captures renewable portfolio effects and declining capacity value with resource saturation  Avoided cost of capacity accounts for CAISO reserve margin relative to load-resource balance

Avoided Cost of Capacity Capacity Value Capacity value reflects the value associated with a renewable resource’s ability to avoid conventional generation capacity, and it is calculated as: RPS Calculator measures capacity value at various renewable penetrations and mixes by: Quantifying each renewable resource’s capacity credit using the Effective Load Carrying Capability (ELCC) method Varying the avoided cost of capacity depending on system-wide reserve margin Capacity Value ($/kW-yr) Capacity Credit (% of nameplate capacity) Avoided Cost of Capacity ($/kW-yr)

Old Methodology Based on NQC Capacity value reflects avoided conventional generation investments afforded by renewable build Common practice is to measure the contribution of variable renewables towards reliability based on output during peak load conditions Original method: Net Qualifying Capacity (NQC) calculated using 70% excedence methodology Calculated as 70th percentile of generation between HE14 and HE18 (Apr-Oct) Differentiated between technologies Did not account for changes to the net peak that occur with continued renewable build Guiding Principle: Resources that are more peak-coincident have more capacity value

New Methodology Based on ELCC While the first increment of solar PV has a relatively large impact on peak, it also shifts the “net peak” to a later hour in the in day This shift reduces the coincidence of the solar profile and the net peak such that additional solar resources have a smaller impact on the net peak

Changing Value of Capacity The marginal ELCC of one renewable resource technology declines as its penetration increases This is most apparent for solar PV, which has a high capacity credit at low penetrations, but this rapidly decreases as additional capacity is added A renewable portfolio that contains a diverse set of technologies can mitigate the decline in ELCC

Effective Load Carrying Capability (ELCC) Pursuant to legislation, Resource Adequacy has adopted “Effective Load Carrying Capability” to determine the contribution of variable renewables towards the system’s reserve margin By definition, ELCC depends on the composition of the system (both conventional and renewable resources) ELCC is now incorporated in Version 6.0 as a lookup function in an ELCC “surface” or matrix ELCC of incremental resources updates each year as the composition of the system changes In the RPS Calculator, the surface contains nearly 10,000 ELCC values—each associated with a different portfolio of renewable resources Interpolation between points on the surface is used to determine marginal ELCC values for resource screening ELCC is the additional firm load that can be met by an incremental generator while maintaining the same level of system reliability

Development of the ELCC Function E3 used a stochastic LOLP methodology to calculate the ELCC of a wide range of possible renewable portfolios Example portfolios: RPS Calculator can access up to 9,750 of these portfolios to best characterize the ELCC of a portfolio and the marginal ELCC of potential additions Portfolio CSP (No Storage) (w/ Storage) Solar PV (Distributed) (Utility-scale) Wind (Coastal) (Inland) ELCC of Portfolio (% of Peak) 1 1.50% 12.00% 9.00% 2.50% 0.00% 16.11% 2 3.00% 7.50% 18.29% 3 10.50% 10.00% 22.52% 4 6.00% 21.08%

ELCC Calculation Approach ELCC values used in RPS Calculator were developed by E3 using the Renewable Energy Capacity Planning (RECAP) model Uses industry-standard approach to evaluate loss of load probability: Calculate hourly net load distributions (based on load, wind, solar shapes) Calculate capacity outage probability table (based on generator forced outage assumptions) Calculate probability that supply < net load in each time period Method is expected to yield similar results to methodology under development in the RA proceeding Values will be benchmarked against calculations used in the RA proceeding when available RECAP Model: https://ethree.com/public_projects/recap.php

ELCC Function Interpolation To approximate the ELCC of points not sampled by the LOLP simulations, the RPS Calculator uses linear interpolation Example: Utility-scale solar in absence of other renewable resources ELCC function represents ELCC of whole renewable portfolio Marginal ELCC (ELCC of incremental resources in year of build) is approximated by the slope of the curve

ELCC Function Interpolation To approximate the ELCC of points not sampled by the LOLP simulations, the RPS Calculator uses linear interpolation Example: Utility-scale solar in absence of other renewable resources In year of interest: Renewable portfolio online Marginal ELCC of solar 1MWh of additional solar Existing renewable portfolio in year of interest ELCC from LOLP model

Renewable Portfolio ELCC ELCC Surface Because the ELCC of each incremental resource depends on the whole portfolio of renewable resources, the ELCC function is actually a multidimensional surface Wind/solar slice of surface: One dimension for each renewable resource type Marginal ELCC for each resource is approximated by slope of surface in each direction Linear interpolation in multiple dimensions involves placing each portfolio on to a facet of this surface Renewable Portfolio ELCC Wind Penetration Solar Penetration

ELCC Surface Because the ELCC of each incremental resource depends on the whole portfolio of renewable resources, the ELCC function is actually a multidimensional surface Wind/solar slice of surface: For any portfolio on this facet: Marginal ELCC of wind Renewable Portfolio ELCC 1MWh of additional wind Wind Penetration Marginal ELCC of solar 1MWh of additional solar Solar Penetration

Capacity Value Calculation The other component of a resource’s capacity value is the avoided cost of capacity from an alternative source Avoided capacity cost is driven by the need for capacity When the system is short, capacity avoided cost approaches the all-in net cost of a new CT When the system is long, capacity avoided cost is represented by today’s average RA contract price RPS Calculator includes Load-Resource Balance for CAISO to determine the timing of this transition Assumptions from LTPP used where possible New CT net cost Based on recent average RA contract prices

Determining Avoided Capacity Costs Year-by-year avoided cost evaluated based load-resource balance using assumptions provided by LTPP Load forecast, demand-side resources, conventional generator additions & retirements Avoided cost transitions from short-run to long-run avoided cost when load-resource balance is reached Transition from short-run to long-run avoided cost

RPS Calculator Guide The parameters that affect Capacity Value can be found on the following tabs: Generators: list of non-renewable generators in the CAISO and/or contracted to CAISO loads Includes NQC assumptions for each conventional plant Aligned with LTPP ELCC_Table: ELCC lookup table for a range of RPS portfolios ELCC_Interp: calculation of marginal ELCCs for each technology based on current portfolio of renewable resources System_Capacity: evaluation of CAISO system load-resource balance (and the corresponding value of capacity) Valuation: calculation of capacity value ($/MWh) used in resource screening and selection process