Carter Danne, PE, PTOE Parametrix, Inc. Assessment of Point Defiance Bypass for High-Speed Intercity Passenger Rail.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
Quiet Zone Joint Police & Streets Committee Meeting Village of Glendale January 16, 2007.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Hcm 2010: roundabouts praveen edara, ph.d., p.e., PTOE
Pedestrians: The Next At- Grade Crossing Frontier Paul F. Brown, PE, PTOE Jacobs Engineering Group ITE Western District Conference June 24-27, 2012 Santa.
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
June 18, 2013 WINDSOR PARKWAY – ROSWELL ROAD INTERSECTION RELOCATION FEASIBILITY ANALYSIS.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
Advance Preemption Costs More than Simultaneous Preemption: Fact or Fiction?
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Exposition Metro Line Construction Authority Safety Overview March 1, 2007 Exposition Light Rail Transit Project.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
High Speed Rail on the Horizon State Public Transportation Partnerships Conference Westin Hotel, Seattle, WA August 3 - 5, 2010 Paula Hammond Secretary.
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Miao(Mia) Gao, Travel Demand Modeler, HDR Engineering Santanu Roy, Transportation Planning Manager, HDR Engineering Ridership Forecasting for Central Corridor.
Module 13: Highway-Rail Grade Crossings (HRGC)
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
2015 Traffic Signals 101 Topic 11 Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption.
Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Roundabout Capacity Analysis Framework Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers Presented By: Dave Stanek & Joel Rabinovitz Fehr & Peers.
VISSIM and Mn/DOT’s INTERSECTION CONTROL EVALUATION (ICE) VISSIM USER’S GROUP MEETING MAY 15-16, 2008 Philadelphia Dennis Eyler, P.E., P.T.O.E. Vice President.
Federal Railroad Administration's Ruling:
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
Center for Advanced Transportation Education and Research University of Nevada, Reno Presenter: Cui Zhou University of Nevada, Reno Center for Advanced.
Asst. Prof. Dr. Mongkut Piantanakulchai
Athens Avenue / UPRR Grade Separation Feasibility Study Thunder Valley Casino.
Video Studies of Flexible Traffic Separators at Highway- Railroad Grade Crossings Florida Department of Transportation Rail Office.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
RAILROAD-HIGHWAY GRADE CROSSING HANDBOOK AUGUST 2007 REVISION PRESENTED BY KURT ANDERSON 2008 Mid-States Highway Rail Grade Crossing Safety Conference.
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA. CVE 505 HIGHWAY & TRANSPORTATION ENGINEERING I.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Vehicle Flow. Homework Ch 3 # 1,4, 7, 15 Vehicle Flow How do vehicles operate in the system –capacity –speed –headway –density.
Roundabout Feasibility: Analysis Framework and Design Considerations Presented By: Jason D. Pack, P.E. Fred Choa, P.E.
Quiet Zone along FEC Corridor Paul Calvaresi Broward MPO 1.
MIDCAP Maryland Intersection and Interchange Design & Capacity Analysis Program.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
POLK RAIL QUIET ZONE ANALYSIS Conditions Assessment CSX “S” Line March 24, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Joint Police & Streets Committee
The I-465 West Leg Reconstruction Project
Operations and Service Concept
WSDOT Passenger Rail Service Outcome Agreements
Transit Signal Priority: The Importance of AVL Data
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Chicago to Council Bluffs-Omaha
Reduced Datasets from Roadway Information Database (RID)
Presentation transcript:

Carter Danne, PE, PTOE Parametrix, Inc. Assessment of Point Defiance Bypass for High-Speed Intercity Passenger Rail

Project Definition & Orientation Effects on Roadways Presentation Outline Intent: Educate on lessons learned and leave you with a basic understanding of the project.

Washington State Department of Transportation (WSDOT) Federal Railroad Administration (FRA) Who are the project leads?

Cities of DuPont, Lakewood, and Tacoma Pierce County Sound Transit Clover Park School District Joint Base Lewis McChord (JBLM) Camp Murray Federal Highway Administration (FHWA) Who are the project partners?

Prepare a Transportation Discipline Report (TDR) Synthesize LOS, Delay, and Queuing information prepared by HDR Complete a safety analysis What was our role?

Where is Point Defiance? Why bypass it?

What about station improvements?

Better service for Amtrak Cascades and Coast Starlight routes (14 more daily train trips) Better multimodal connections with commuter rail and light rail Fewer conflicts for freight rail on existing alignment What does it mean for rail operations?

21 at-grade crossings 47 study intersections Level of service (LOS) and intersection delay Maximum queues Safety How does the Project affect roadways?

Quantity of Intersections Intersection EffectAM Peak HourPM Peak Hour Slight to No Noticeable Effect (Delay change of 5 seconds or less per vehicle) 4341 Improved Functioning (Delay improvements of more than 5 seconds per vehicle) 33 Adversely Affected (Delay increases greater than 5 seconds per vehicle) 13 Roadway volumes similar between alternatives One additional train per peak hour Project has some improvements built into it LOS and Intersection Delay LOS was of limited use as measures of effectiveness (MOE) because the project train trips were infrequent.

Effect on Maximum Queue Lengths Overall 2-4 vehicles longer with proposed Project Additional Intersections Blocked by Maximum Queues S. Washington Street & S. 51 st Street (PM Peak Hour Only) Roadway blockage duration approximately one minute or less when not near a station Similar blockage time to commuter rail in corridor Signal improvements built into the project would help Maximum Queues Use graphics to supplement queue tables. Record maximum queues following the train crossing event until the system returns to normal.

StreetMovementStorage (feet) Peak Hour Maximum Queues (feet) No Action Build S. 56 th Street EB Left50AM PM EB Through 125 RRAM224 B225 B PM237 B238 B EB RightSharedAM224 B225 B PM237 B238 B S. 56 th Street WB LeftSharedAM PM WB Through 225 I/SAM PM391 WB RightSharedAM PM391 S. Washington Street NB Left75AM42 PM4850 NB Through 600 I/SAM58 PM64 NB RightSharedAM60 PM66 S. Washington Street SB Left100AM6769 PM SB Through 600 I/SAM50 PM800 B1219 B SB RightSharedAM9195 PM Maximum Queues – Example Storage distances estimated to the nearest 25 feet. IS Distance to next upstream roadway. RR Distance reported to upstream railroad crossing. _ Queue extends beyond lane storage. B Blocks access to turn pocket or channelized right-turn.

Safety - Crossing Area Improvements Do Not Stop On Tracks signs Wayside horns Median barriers Sidewalks Pre-signals More advanced signal controllers

Predicted Accident Experience Methodology Railroad-Highway Grade Crossing Handbook – Revised Second Edition 2007 US DOT accident prediction model for railroad- highway grade crossings Five years of most recently available accident data Input crossing characteristics Year 2030 conditions

Units of Accident Experience PerspectiveUnits US DOT Accident Prediction Formula Accidents per year (annual frequency) PublicYears between accidents (recurrence interval), e.g., 1 accident in 18 years. Exposure-basedAccidents per one million train crossings Remember, document units in meaningful terms to your audience.

Expected Accident Experience – Accidents per Million Train Crossings Route No Action Alternative Build Alternative Bypass Route Bypass Route and Point Defiance Route Combined

Expected Accident Experience – Years between Accidents Corridor Summary Years between Accidents Change Build vs. No Action Route No Action Alternative Prediction Build Alternative Prediction Time between Accidents Point Defiance Route years longer Bypass Route years shorter Both Routes Combined years shorter

Accident Experience Thresholds Active Devices without GatesActive Devices with Gates When the expected accident frequency* exceeds 0.1 accidents per year (1 accident every 10 years), consider active devices with gates. When the expected accident frequency* exceeds 0.5 accidents per year (1 accident every 2 years), consider grade separation. * As predicted by the US DOT Accident Prediction Formula. Note: These apply regardless of whether or not the improvements are economically justifiable.

Expected Accident Experience – Greatest Effects on Individual Crossings Individual Crossings Years between Accidents Change Build vs. No Action Crossing Crossing ID No Action Alternative Prediction Build Alternative Prediction In Years In Train Volume Bridgeport Way SW085821P % Barksdale Ave085836E %

Basic understanding of the Project Effects on roadways Lessons learned More information: Carter Danne, PE, PTOE Parametrix, Inc. office cell Thank You!