THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
May 2005 The French Water Services: Main present challenges.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility)
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Location Map - Nepal Nepal Source:Great Rivers of the World, National Geographic Society, 1984.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
Financing Urban Public Infrastructure
1 Georgian National Energy And Water Supply Regulation Comission Power Losses Nugzar Beridze June 27-July 3, 2008.
1 THE RATE CASE PROCESS A Blend of Science and Superstition Presentation to the Mongolian Energy Regulatory Board By Burl Haar Executive Secretary Minnesota.
Energy Regulation Legislation in Sri Lanka
SELECT A TYPE OF OWNERSHIP
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Republic of India is a Neighbour of China Most Populous Countries. It is No.2. China is No. 1. It has unique history of Political stability and a Socialistic.
1 Georgian National Energy and Water Supply Regulatory Commission Institutional structure of the Commission Giorgi Chakhnashvili 27 June - 3 July, 2008.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
SANDLER, TRAVIS & ROSENBERG, P.A. An International Trade & Business Practice CCBFA Seminar Program The Impact of Antidumping and Countervailing Duties.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
1 Märt Ots Energy Market Inspectorate Vilnius Energy regulation in Estonia.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 South Asia Energy Regulation Partnership Executive Exchange Program October 7-9, 2002 Thimpu, Bhutan. Power Sector Regulation and Regulatory Policy in.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Name, Surname, Position Event, Date, Place Financial issues.
16 August Capacity Building on Competition Policy in Namibia Rehabeam Shilimela NEPRU.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
REPUBLIC OF SOUTH AFRICA GAS REGULATOR LEVIES BILL (As introduced in the National Assembly as a money Bill) (The English text is the official text of the.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
REVENUE, COSTS AND PROFIT Revenue is the value of total sales made by a business within a period, usually one year. Costs are the expenses incurred by.
System design for partial liberalization on electric industry Rules related to use of networks Establishment of a fair and transparent transmission rules.
Presentation to Select Committee on Economic Development
1 CHAPTER VI BUSINESS- GOVERNMENT TRADE RELATIONS INTERNATIONAL BUSINESS.
SOUTHERN AFRICAN POWER POOL PPP Power Projects in Southern Africa
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
CORPORATE GOVERNANCE TRAINING MODULE 14: SOE’S - COSTING COMMUNITY SERVICE OBLIGATIONS ADB Private Sector Development Initiative Corporate and Financial.
Course 3.6 Regulatory Commissions: Management & Staff Functions, Bangladesh, Mar 31- Apr 4, 2002 SOUTH ASIA REGIONAL INITIATIVE/ENERGY Regulatory Commission.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Airports Economic Regulatory Authority of India
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Damitha Kumarasinghe Director General
Economic Regulation of Irish Water
Distribution Tariffs in Brazil
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
WATER REGULATORY AUTHORITY
Energy Regulatory Commission of the Republic of Macedonia
CROATIA – Water Services Sector
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Minerals & Energy Parliamentary Portfolio Committee
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993

ELECTRICITY TARIFF FIXATION COMMISSION COMPOSITION OF REGULATORY COMMISSION  SIX MEMBERS INCLUDING CHAIRMAN  ONLY CHAIRMAN WORKS FULLTIME AND PAID BY GOVT. FOR HIS/HER SERVICES FOR HIS/HER SERVICES  OTHER MEMBERS ARE PART-TIME  DoED IS SECRETARIAT TO ETFC  DIRECTOR GENERAL OF DoED IS SECRETARY OF ETFC  TECHNICAL & ADMINISTRATIVE SUPPORT IS GIVEN BY DoED

ELECTRICITY TARIFF FIXATION COMMISSION COMPOSITION OF REGULATORY COMMISSION  CHAIRMAN APPOINTED BY HMG/N (NON GOVERNMENT)  REPRESENTATIVE FROM FNCCI  REPRESENTATIVE FROM CONSUMERS  INDEPENDENT ECONOMIST  REPRESENTATIVE FROM UTILITY  REPRESENTATIVE OF MoWR

COMPOSITION OF REGULATORY COMMISSION  THIS IS TO REPRESENT ALL STAKE HOLDERS IN THE COMMISSION ITSELF COMMISSION ITSELF  THIS IS NOT IN CONFORMINITY WITH REGULAR PRACTICE OF APPOINTING REGULATORS WHO ARE TOTALLY INDEPENDANT APPOINTING REGULATORS WHO ARE TOTALLY INDEPENDANT AND HAS NO CONNECTION AT ALL WITH THE POWER SECTOR AND HAS NO CONNECTION AT ALL WITH THE POWER SECTOR  BUT OUR COMMISSION HAS WORKED SATISFACTORILY SO FAR AS IT IS SMALL SYSTEM AND FULLY PUBLIC OWNED AS IT IS SMALL SYSTEM AND FULLY PUBLIC OWNED

FUNCTION OF REGULATORY COMMISSION PRESENT FUNCTION LIMITED TO SETTING RETAIL POWER TARIFF AND OTHER ASSOCIATED CHARGES

PROCEDURE OF TARIFF REVIEW  THE LICENSEE FOR THE DISTRIBUTION OF ELECTRICITY IS REQUIRED TO SUBMIT AN APPLICATION IN PRESCRIBED FORMAT REQUIRED TO SUBMIT AN APPLICATION IN PRESCRIBED FORMAT TO ETFC TO REVIEW THE TARIFF RATE AND OTHER CHARGE TO ETFC TO REVIEW THE TARIFF RATE AND OTHER CHARGE  THE LICENSEE TO SUBMIT FINANCIAL, TECHNICAL AND OTHER RELEVANT DOCUMENTS TO JUSTIFY TARIFF REVIEW RELEVANT DOCUMENTS TO JUSTIFY TARIFF REVIEW  IF ETFC REQUIRES ANY FURTHER DOCUMENTS/DATA/EXPLANATION IT HAS TO NOTIFY THE APPLICANT WITHIN 35 DAYS OF SUBMISSION IT HAS TO NOTIFY THE APPLICANT WITHIN 35 DAYS OF SUBMISSION OF APPLICATION. DATE OF SUBMISSION OF ALL DOCUMENTS/ OF APPLICATION. DATE OF SUBMISSION OF ALL DOCUMENTS/ CALCULATIONS SATISFACTORY TO ETFC SHALL BE DEEMED TO BE CALCULATIONS SATISFACTORY TO ETFC SHALL BE DEEMED TO BE THE DATE OF RESUBMISSION OF THE APPLICATION THE DATE OF RESUBMISSION OF THE APPLICATION  ETFC HAS TO GIVE ITS DECISION ON THE REVIEWED TARIFF WITHIN 60 DAYS OF SUBMISSION OF APPLICATION 60 DAYS OF SUBMISSION OF APPLICATION

TARIFF DECISION  THE TARIFF DECISION MADE BY ETFC IS FINAL. IT DOES NOT HAVE TO GO TO GOVERNMENT. TO GO TO GOVERNMENT.  THE UTILITY IS NOTIFIED AS SOON AS DECISION IS MADE.  NEW TARIFF RATES AND OTHER CHARGES ARE PUBLISHED FOR GENERAL PUBLIC. GENERAL PUBLIC.  THERE IS NO PROVISION FOR APPEAL ON THE ELECTRICITY RATES SET BY THE COMMISSION. SET BY THE COMMISSION.  APPEALS CAN ONLY BE MADE ON PROCEDURAL MATTERS.

EXPANSION OF FUNCTIONS OF THE COMMISSION SO FAR FUNCTION OF SETTING ONLY RETAIL TARIFF WAS ADAQUETE AS IT WAS VERTICALLY INTEGRATED FULLY PUBLIC OWNED UTILITY. NOW PRIVATE GENERATION HAS ENTERED THE POWER SECTOR PRESENT SET UP IS INADEQUATE. NEW HYDRO POWER POLICY APPROVED IN THIS WILL EXPAND FUNCTIONS OF COMMISSION:  TO BRING POWER PURCHASE AGREEMENTS UNDER ITS REVIEW.  TO SET WHEELING CHARGES.  TO SET QUALITY / SAFETY STANDARD OF SERVICES.

PERFORMANCE OF COMMISSION TO DATE HAS PASSED FOUR TARIFF ORDERS SINCE ITS FORMATION 1. HAS BROUGHT TARIFF LEVELS TO REFLECT COST PLUS A REASONABLE RETURN ON INVESTMENTS. REASONABLE RETURN ON INVESTMENTS. THIS WILL MAKE POWER SECTOR FINANCIALLY VIABLE AND ABLE THIS WILL MAKE POWER SECTOR FINANCIALLY VIABLE AND ABLE TO INVEST TO SUSTAIN RELIABLE SUPPLY AND LESS DEPENDANT TO INVEST TO SUSTAIN RELIABLE SUPPLY AND LESS DEPENDANT UPON DONER / LENDING AGENCIES. UPON DONER / LENDING AGENCIES. THIS HAS BEEN VERY DIFFICULT AS PEOPLE OF WHOLE SOUTH ASIA THIS HAS BEEN VERY DIFFICULT AS PEOPLE OF WHOLE SOUTH ASIA REGION HAS BEEN USED TO HIGHLY SUBSIDISED VERY LOW TARIFF REGION HAS BEEN USED TO HIGHLY SUBSIDISED VERY LOW TARIFF FOR A LONG PERIOD. FOR A LONG PERIOD.

OBJECTIVES IN FIXING THE TARIFF 1. TO MAKE UTILITY ABLE TO I. SUPPLY RELIABLE POWER I. SUPPLY RELIABLE POWER II. TO MEET GROWING DEMAND II. TO MEET GROWING DEMAND III. TO EXPAND SYSTEM TO COVER NEW AREAS. PRESENTLY ONLY III. TO EXPAND SYSTEM TO COVER NEW AREAS. PRESENTLY ONLY ABOUT 20% OF THE POPULATION HAS ACCESS TO ELECTRICITY. ABOUT 20% OF THE POPULATION HAS ACCESS TO ELECTRICITY. 2. TO MAKE THE POWER SECTOR LESS DEPENDANT ON GOVERNMENT FUNDING. GOVERNMENT HAS MORE URGENT NEEDS TO INVEST IN FUNDING. GOVERNMENT HAS MORE URGENT NEEDS TO INVEST IN SOCIAL SECTORS LIKE EDUCATION, HEALTH ETC. SOCIAL SECTORS LIKE EDUCATION, HEALTH ETC. 3. TO MAKE POWER SECTOR LESS DEPENDANT ON DONOR AGENCIES. 4. TO ATTRACT PRIVATE SECTOR IN THE POWER SECTOR.

T A R I F F TARIFF CALCULATIONS BASED TO COVER COSTS-O&M DEPRECIATION `INTEREST ON LOAN POWER PURCHASE GOVERNMENT ROYALTY CORPORATE TAX RATE OF RETURN-6% OF ASSETS TO ACHIEVE A SFR OF ABOUT 20/23% ON FUTURE INVESTMENTS.

SOME FEATURES OF PRESENT TARIFF 1. ONE OF THE HIGHEST IN THE SOUTH ASIA REGION. AVERAGE PRICE ALMOST 8.5 U.S. CENT/KWH. ALMOST 8.5 U.S. CENT/KWH. 2. NO CROSS SUBSIDIES BETWEEN DIFFERENT CATAGORIES OF CONSUMERS. EG. INDUSTRIES CONSUMES 38% OF ENERGY AND CONSUMERS. EG. INDUSTRIES CONSUMES 38% OF ENERGY AND CONTRIBUTES 36% OF REVENUE. DOMESTIC CONSUMES 37% OF CONTRIBUTES 36% OF REVENUE. DOMESTIC CONSUMES 37% OF ENERGY AND CONTRIBUTES 37% OF REVENUE. ENERGY AND CONTRIBUTES 37% OF REVENUE. 3. BUT THERE IS CROSS SUBSIDY WITHIN THE DOMESTIC SECTOR. RATE VARIES FROM: RATE VARIES FROM: 5 U.S. CENT/KWH - LOW CONSUMERS 5 U.S. CENT/KWH - LOW CONSUMERS 9 U.S. CENT/KWH - AVERAGE CONSUMERS 9 U.S. CENT/KWH - AVERAGE CONSUMERS 12 U.S. CENT/KWH - HIGH CONSUMERS 12 U.S. CENT/KWH - HIGH CONSUMERS 4. TWO PART TARIFF FOR ALL HIGH VOLTAGE (11KV & ABOVE) CONSUMERS. CONSUMERS. 5. TIME OF DAY TARIFF FOR LARGE CONSUMERS. PEAK TIME-15% EXTRA ON NORMAL TARIFF. OFF PEAK TIME (NIGHT)-30% REBATE EXTRA ON NORMAL TARIFF. OFF PEAK TIME (NIGHT)-30% REBATE ON NORMAL TARIFF. TOD TARIFF APPLIED BECAUSE VERY LOW ON NORMAL TARIFF. TOD TARIFF APPLIED BECAUSE VERY LOW DEMAND AT NIGHT. WASTED ENERGY AT NIGHT FROM RUN OF DEMAND AT NIGHT. WASTED ENERGY AT NIGHT FROM RUN OF RIVER HYDRO PROJECTS. RIVER HYDRO PROJECTS.

PRESENT POSITION OF UTILITY 1. FAIRLY STABLE FINANCIAL POSITION. 2. ON WAY TO ACHIEVE 6% ROR AND 20% SFR. 3. PRIVATE SECTOR INVESTING IN POWER SECTOR (GENERATION) FOUR PRIVATE POWER GENERATORS ALREADY SUPPLYING ABOUT FOUR PRIVATE POWER GENERATORS ALREADY SUPPLYING ABOUT 30% OF ENERGY DEMAND. 30% OF ENERGY DEMAND. 4. MANY PRIVATE SECTOR PARTIES SHOWING INTEREST IN NEW PROJECTS. PROJECTS. 5. HIGH ELECTRICITY PRICES BEGINNING TO BE ACCEPTED AS QUALITY OF POWER IS IMPROVING. POWER CUTS WHICH USED QUALITY OF POWER IS IMPROVING. POWER CUTS WHICH USED TO BE FREQUENT IN PAST YEARS IS NEGLEGIBLE NOW. ON GOING TO BE FREQUENT IN PAST YEARS IS NEGLEGIBLE NOW. ON GOING NEW POWER PROJECTS SHOULD MEET THE DEMAND TILL NEW POWER PROJECTS SHOULD MEET THE DEMAND TILL 2006.