Quality control of High Capacity Micropiles (Seismic Retrofit Construction of a service water pond at KAMEIDO in TOKYO) Masao Sagara (Fujita Corporation)

Slides:



Advertisements
Similar presentations
Copyright 2011 – Magnum Piering, Inc. Helical Pile Selection and Sizing Presentation by: Howard A. Perko, Ph.D., P.E. Director of Engineering, Magnum Geo-Solutions,
Advertisements

INTRODUCTION Session 1 – 2
Grow Grass Grow Grow Grass Grow Purpose Purpose Which type of water would make the grass grow better pond, tap or salt?
Chapter 33 Foundation Systems.
Foundation Systems.
Measurement of Landslide Movement with 3D Laser Scanner ASANO, Hiroki Erosion and Sediment Control Research Group Public Works Research Institute.
CTC-375 Construction Methods
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Horizontal Loading Tests on Model Foundations Retrofitted by Micropiles Masahiro NISHITANI Jiro FUKUI Takeshi UMEBARA IAI, PWRI Structures Research Group.
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
Chapter 18 Foundations.
TOPIC 2: TYPES OF FOUNDATION
Science Changing Earth Chapter 2. a fracture in the Earth’s lithosphere fault.
Joint Research of Seismic Retrofitting Technology for Existing Foundations Masahiro Ishida Public Works Research Institute JAPAN “Design and Execution.
Topics on Micropiles in Japan
THE NEW COMACCHIO TUNNEL MULTIPURPOSE DRILLING RIG
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
IWM 2004 Jouko Lehtonen Jouko Lehtonen Quality Assurance of Drilled Micropiles in Finland.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
Slop Stabilization Pertemuan
Department of Civil Engineering,
FORMS, SCAFFOLDING and STAGING
Imaging system Hybrid CBCT apparatus (Veraviewepocs 3Df, J Morita Mfg. Co., Kyoto, Japan) ・ tube voltage : 90 kV ・ tube current : 1 mA ・ scan time : 9.4.
Effect of combination of twist pitches on distribution of strands appearing on cable surface in CICC Daisuke Miyagi, Toshiya Morimura, Makoto Tsuda (Tohoku.
Construction of Data-Base for High-capacity Micro-pile method Yoshinori Otani,P.E. j p Hirose & Co., Ltd. Prof. Masaru Hoshiya Musashi Institute of Technology.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Outline of the Execution Manual for Seismic Retrofitting of Existing Pile Foundations with High Capacity Micropiles Masashi ITANI Takeshi OSHITA Seiichi.
HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY.
Recent Construction Sites of Micropiles in Germany Thomas F. Herbst Wessling / Munich Germany 5th IWM 2003 Seattle – Session 2.
Error Introduced by: Image Analysis Software Camera & Part Holder “..any sufficiently advanced technology is indistinguishable from magic.” Arthur C. Clark.
SOIL MECHANICS-1 DEEP FOUNDATIONS PRESENTATION TOPIC MEMBERS O8-CE-29
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
1.State The Problem: Start by asking a question. (Most important step) 2.Observation: Perceiving objects or events through 1 of your 5 senses. 3.Form.
The meeting which thinks about fishway of Otagiri River Holdings document for description March 6, 2003 Ministry of Land, Infrastructure and Transport.
Foundation Loads Dead Load Live Load Wind Load
Research at Northwestern University: End-bearing Micropiles in Dolomite.
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
Topics on Micropiles in Japan (2004)  適用事例 亀戸配水池の既設基礎の耐震補強 ( 相良 ) 鳥飼大橋架替工事に伴うL型擁壁基礎工事 鹿児島県浮津ロックシェッド擁壁基礎工事  官民共同研究『交差点立体化の路上工事短縮技術の 開発』 新設基礎への適用を検討中 
IWM200 2 Masaru Hoshiya Musashi Institute of Technology Probability Study for a High-Capacity Micropile Bearing Mechanism Yoshinori Otani Hirose & Co.,
Class Work 5.A OBLIQUE VIEW. START 1.DRAW BORDER LINE 2.DRAW TITLE BLOCK 3.WRITE YOUR NAME 4.DIVIDE THE WORK SPACE INTO 4 (200mm – 125mm from border line)
C.2.5b – Volumes of Revolution – Method of Cylinders Calculus – Santowski 6/12/20161Calculus - Santowski.
SUPERKEKB MAIN RING TUNNEL MOTION M. Masuzawa, T. Adachi, H. Iinuma, T. Kawamoto and Y. Ohsawa, KEK Tsukuba, Japan
CASE JEILL ENTERPRISE CO., LTD. KOREA.. ( VIEW OF JOB SITE-01 )
Use of Modern Retrofitting Techniques in Udaipur Station Building
Musashi Institute of Technology
TECHNICAL BRIEFING ON PROOF CORING WORKS FOR MICROPILES
Quality Assurance of Drilled Micropiles in Finland
Outline Introduction Test section details Axial load test results
MANUFACTURING PROCESSES 5/27/2018 5/27/2018 1
Masashi ITANI Takeshi OSHITA Seiichi ONODERA
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Construction Examples in Japan High Capacity Micropile
By Maggie Call and Avery Schaff
EAG346-Sem II 2014/2015 Lesson 2.
An-Najah National University Engineering College
Date of download: 12/26/2017 Copyright © ASME. All rights reserved.
O.M. Beketov National University of Urban Economy in Kharkiv
CONSTRUCTION METHODS & TECHNOLOGY
Perspective Projection Sample
European Standard prEN 14199
Topics on Micropiles in Japan
IWM 2000 Turku, Finland Pasi Korkeakoski
Heteropogon contortus
Outline Introduction Desecration of the project Soil Report
Screwfox: Manual and Battery Powered Torque Screwdrivers
CRUST FORCES.
Title: Measurement Lab
Development of Combined Peanut Planter
Graduation Project Bracing system for deep excavation.
Topics on Micropiles in Japan
Presentation transcript:

Quality control of High Capacity Micropiles (Seismic Retrofit Construction of a service water pond at KAMEIDO in TOKYO) Masao Sagara (Fujita Corporation) Junya Hayashi (Waterworks, Tokyo Metropolitan Government)

Contents ① Background ② Purpose ③ Outline of construction and Quality control ④ Result and consideration ⑤ Conclusion

① Background (Outline of Kamaido service water pond)

Kamaido service water pond ground plan a cross section Built in 1970 height ; 7.7m Width; 104m×104m Volume of water kept in store; 60,000m 3 104m 7.7m

Kamaido service water pond In the upper part, there are a baseball ground and tennis courts.

Kamaido service water pond Existing piles 35 ~ 48m φ600mm The number of existing piles are 1696.

The Hyogoken-nanbu earthquake happened in Specifications for Water installations was revised in Kamaido service water pond did not satisfy Specifications for Water installations. By the way

Kamaido service water pond HMP Existing piles 35 ~ 48m φ600mm 38 ~ 48m φ178mm

② Purpose

Purpose The number of existing piles are It is worried that the existing piles comes in contact with HMP when HMP is constructed. Do to examine whether HMP comes in contact with the existing paling.

③ Outline of construction and Quality control

Ground plan It has divided into nine blocks by expanded joint. 8 HMP are constructed by a block. The construction of 72 of 9×8 in all is scheduled. Six was constructed in this time. Expanded Joint

Ground plan(Expanding figure) HMP are batter piles. Existing piles HMP

Construction image (A cross section) The ground is a very soft ground up to about 35-43m. The ground becomes hard at deeper position than it. HMP is constructed between the existing piles. N value Existing piles HMP

Construction (batter pile) Plastic Bit

Construction process chart

Quality control ① Investigation of torque ② Angle measurement ③ Measurement with inclination meter

Investigation of torque

Investigation result of torque The rotating torque showed the tendency to increase if reaching the bearing ground in the drilling. Torque(Mpa) depth(m )

Angle measurement

Measurement with inclination meter

Result of Measurement with inclination meter

The angle of the paling of all the palings was ±1°. This value was more excellent than construction control value ±2.5° on general paling head

Conclusion It was thought that the adoption of a plastic bit was good for the anxiety about the contact of the existing paling and HMP. It was confirmed that the construction accuracy of batter pile of HMP was excellent.The accumulation of further data will be hoped for in the future. It was thought that the measurement of the rotating torque of the drilling machine was one of effective construction control techniques as the judgment material which confirmed the attainment to the supporting soil.