MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

ADA Requirements Well-designed sidewalks meet ADA requirements:
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Charlotte Area Transit System Sprinter Enhanced Bus Project Implementation NCAMPO Conference May 2012 Travis Pollack, AICP.
Political Support Needed to Improve Transportation 06 | 25 | 2013 SAN FRANCISCO, CALIFORNIA SFMTA | Municipal Transportation Agency Image: Market and Geary.
Chapter 6 Performing Basic Vehicle Manuers
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
Performing Basic Vehicle Maneuvers
Dudley Square Complete Streets Design Project Public Meeting #1 October 22, :00pm – 8:00pm Boys & Girls Club of Boston Yawkey Club of Roxbury.
Short Range Transit Improvement Plan CITY OF HIGH POINT Sounding Board/Steering Committee Meeting Service Recommendations January 13, 2015.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
CHAPTER 9 DRIVING IN URBAN TRAFFIC
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Route Design Unit 4: Service Planning & Network Design.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
2 $ Million investment in three transportation projects prioritizing the movement of people to and through the Loop Washington/Wabash CTA Station.
Three Phases of Commuting Trip 1.Collection Phase – the trip from home to the main travel vehicle Cost: a.basically zero for automobile b.time costs and.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Cheryl Thole, Jennifer Flynn CUTR/NBRTI, Senior Research Associates Transit in GIS Conference September 14, 2011 St. Petersburg, Florida.
Module 5 Displaced Left Turn (DLT) Intersections
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Transportation Tuesday TRANSPORTATION TUESDAY Stopping & Parking You should never park or stop your vehicle on busy traffic lanes or in no waiting and.
Bus Stop Design Guidelines - In Support of Effective Service Planning
1 Research go bus Impact Study TRB National Transportation Planning Applications Conference Atlantic City, May 2015.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
New buses for Route 28 Mattapan Branch Library June 23, 2010.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Business Logistics 420 Public Transportation Lecture 20: Transit System Design.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
1 Transit and Climate Change April 10, 2008 Deborah Lipman Washington Metropolitan Area Transit Authority.
lesson 2.3 ROADWAY MARKINGS
Driver’s Education Chapter 6 Performing Basic Vehicle Manuers.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using.
Traffic Flow Parameters Surface Street Application.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
TRB/APTA 2004 Bus Rapid Transit Conference The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation.
lesson 4.2 BASIC DRIVING MANEUVERS
Left Lane Mixed-Traffic BRT August 22, 2012 Stefano Viggiano and Jack Gonsalves.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
DICK RUDDELL EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Chapter 6 Performing Basic Vehicle Maneuvers
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Service Guidelines and Standards Capital Metropolitan Transportation Authority Board of Directors Meeting September 2015 capmetro.org |1.
Maintenance and Temporary Traffic Control
Basic Maneuvers Chapter Six. Moving into Traffic Visibility: check oncoming traffic and the road. Notice others Time: is there enough time to move into.
9.6 Turning Roadways and Channelization, Types of Turning Roadways p.9-55 ~ 9-92 Lean how to determine minimum edge-of-traveled- way radii for the.
Preconditions for the introduction of free public transport in Tallinn Dago Antov Tallinn University of Technology Professor on transport planning 1 Tasuta.
30 Stockton Transit Priority Project Chestnut November 10, 2015 Marina Community Association.
Complete Streets Training Module 4b – Designing for All Users.
Free MetroRide Travel Time and Reliability Improvements
D Line Station Plan Overview
D Line TAC Meeting #1: D Line Rapid Bus Project Planning City of Richfield Transportation Commission July 12, 2017 Katie Roth, Project Manager.
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
D Line and Station Plan overview
D Line Station Plan Overview
Accessible shared streets
M14A/D Select Bus Service
lesson 2.3 ROADWAY MARKINGS
Rural Transit Stop Design Guidelines Prof Omer maaitah
Presentation transcript:

MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April 7, 2015

MBTA Key Bus Route Improvement Program The Project Planning Process Bus Stop Design

Introduction 15 Key Bus Routes 800 stops $10 million funding

Key Route Characteristics Describe characteristics of key routes Frequency, span of service ridership Key Point #1 Key Point #2 Key Point #3 Key Point #4

Typical Conditions Key Point #1 Key Point #2 Key Point #3 Key Point #4 Bus stop too short Bus stops too close Poorly located boarding area

Challenges to Good Transit Access difficult for seniors and persons with disabilities Stops blocked by parked cars Many bus stops without shelters and other amenities Traffic congestion and double parking Traffic signals often not optimized or coordinated Placement and number of bus stops result in longer trip times

Key Bus Route Goals Greater reliability less bus bunching, fewer delays Faster service fewer stops Improved accessibility faster boardings Passenger amenities shelters, benches, signage, trash barrels

Reliability Issues BUS BUNCHING

Faster Service Traffic Signal Improvements Stop Locations Fewer Stops Faster Boarding

Traffic Signal Improvements Signal optimization Timing and phasing changes Benefit buses and general traffic Transit signal priority potential Bus stop locations Relocated to improve operations Speed up bus service Decrease in bus delay at intersections

Queue Jump Lanes Route 66

Bus Stop Locations Sufficient length to allow buses to pull to the curb Clear boarding/alighting area Not blocking crosswalks or driveways Considerate of adjacent traffic Appropriate distance between stops

Bus Stop Consolidation Benefits Shortens bus trip times Improves service reliability Minimizes “stop & go” experience Provides additional parking spaces Ability to provide better stop amenities

Improved Accessibility Legal Mandate All bus doors must open at curb Deter cars from parking in stops Providing accessible curb access requires longer bus stops Bus Stops must meet Current ADA Guidelines

Improved Passenger Comfort & Convenience Install shelters where possible Weather protection, seating, comfort New street furniture Shelters, benches, trash barrels

MBTA Key Bus Route Improvement Program The Project Planning Process Bus Stop Design Lessons Learned

Planning Process Identify existing stops Existing amenities Ridership data Propose stop spacing 4 to 7 stops per mile (750 to 1320 ft) Propose stop consolidation or relocation 25% reduction in stops Identify potential amenities Trash receptacle: Most stops Bench: Moderate use stops Shelter: High use stops, public support Public Meetings

MBTA Key Bus Route Improvement Program The Project Planning Process Bus Stop Design Lessons Learned

Analysis of Door Spacing 21’18’ 5’x8’ Landing Area 10’x4’ Middle Clear Zone 8’x4’ Rear Clear Zone

Far Side Stop Bus LengthMin. Stop Length 40 FT60 FT 80 FT

Near Side Stop Bus LengthMin. Stop Length 40 FT80 FT 60 FT100 FT

Mid Block Stop Bus LengthMin. Stop Length 40 FT100 FT 60 FT120 FT

Pavement Marking Design

MBTA Key Bus Route Improvement Program The Project Planning Process Bus Stop Design Lessons Learned

Communication is key Coordinate with community and abutters early and often ADA Compliance can be a challenge Be prepared for trade-offs between bus stop improvements and parking

MBTA Key Bus Routes Improvement Program Joanne Haracz, AICP McMahon Associates, Inc McMahon Associates, Inc. Serving the Mid-Atlantic, Florida, and New England mcmahonassociates.com responsive client solutions since 1976