Indiana Department of Transportation Professional Services Contracting System (PSCS) Letter of Interest Submittal (LoIS)

Slides:



Advertisements
Similar presentations
How To Use the PPG Industries Foundation Online Application A Brief Tutorial.
Advertisements

Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Welcome to the Online Employment Applicant Tutorial Click here for next screen.
Go to
CREATING A PAYMENT REQUEST FOR VENDOR IN SYSTEM
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
Once you have obtained your log-on and password, enter the log-on assigned to you and your password.
Performance Measure Reporting The process for submitting Performance Measure (PM) Reports is as follows: 1.Program Director creates their initial Performance.
Pennsylvania Department of Environmental Protection Office of Oil and Gas Management Oil and Gas Production/Waste Reporting Offline Spreadsheet Report.
GSA eBuy Seller’s Tutorial
How To Use NCA’s Online Grant Application System
This basic tutorial will take vendors step by step through the RFQ process. The tutorial will also point out many of the exciting new.
Timberline Youth Soccer Association TYSA Coaches Reference Book for Website Use Rev 2 August 2005.
TFACTS Private Provider Financial/Invoicing Overview 1.
Copyright (c) Dua'a Mohd Alkhori Blackboard Done By : Dua’a Alkhori Supervised By : Dr.Sahbi Ayari.
Doctoral Program of Study Step by Step Guide on submitting your Interactive Program of Study online.
Graduate Program Of Study Step by Step Guide to submitting your Interactive Program of Study online.
UCSD AP On-Line RECRUIT Training Applicants Screens.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Quick Start Guide. This 22 page introduction to the Financial Assessment Subsystem provides the user with a visual overview of the components of the system.
Chapter Accreditation Online System Usage Tutorial Department of Member Relations & Grants National Children’s Alliance.
1Allocating Expenses. Create Report Header Page To access this screen, click on ‘New Expense Report’ from your Expense Module Tab This page will come.
Engineering Document Repository & Electronic Signature (E-Sign) Tutorial 1 DCG- Revision C 7/25/2014.
Diversey Rebates Distributor User Manual. Link: CLICK.
Entering a Purchase Request Draft Departmental User Instructions June 2014.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
2010 Open Market Transfer System User Guide. 2 Objectives Uses of this Guide Understand how to register for the Open Market Transfer System (OMTS). Understand.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Facilities ESR Electronic Service Request. Use the ESR to do the following: Submit a service request electronically to the facilities department Submit.
Board of Canadian Registered Safety Professionals Certification Maintenance Online Tool BCRSP introduces a new web-based tool to assist certificate holders.
Online Reporting Guide
What is Museum Box? A Museum box is a way of presenting information that allows you to create a cube project that can be shared with others. You can use.
A Step by Step Guide How to add your own pages to the website.
Online Training for TEXAS TECH UNIVERSITY and TEXAS TECH HSC Hiring Managers Employment Office April 2003.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Open the Goodyear Homepage Click on Teacher Tools.
Log on to the site using your User ID and Password and select journal and click “Log In” Click here to create a new account Click here to check the system.
Basic Instructions on how to use One Drive and share files. ONE Drive Your LogoYour own footer.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Walk Through of VEEP Online System Updated June 2015 Registering as a ‘New User’ Logging On and Reporting.
CSC350: Learning Management Systems COMSATS Institute of Information Technology (Virtual Campus)
1 Copyright 2007 Texas Education Agency. 2 Adding Attachments A – Select the Upload button to upload a student’s data file (XML extract from your local.
SIGNZ Mail Merge / Merge / Labels SIGNZ Mail Merge / Merge / Labels.
2015 Form 471 Step-by-Step for Filing the Form 471 Using DPI 470/RFP for Internal Connections and Managed Internal Broadband Service 1.
Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.
How can I respond to an IRB CAL Letter? It’s easy…just follow the steps on the next few slides.
Once all screens are completed in good order, you will be prompted to lock the application. Choose a signature method by checking the appropriate box on.
Web Center Training ©2003 Optimum Technology, Inc.
NYS Division of Homeland Security And Emergency Services (DHSES) E-Grants Tutorial Creating an Application for the EOC RFP To access DHSES E-Grants you.
This is the iInterfolio site: Click on APPLY NOW FOR FREE.
1.Access the following website: Click the above link and you will taken directly to the scheduling webpag.
Walk Through of VEEP Online System Updated May 2011.
Guidelines for Conveners: Generating Correspondence for the interview Glossary: Requisition - Job Advertisement (open Advertisement or Pool Merit Process)
ELISTING How to use eListing to conveniently and quickly file your personal property listing online. DEPARTMENT OF ASSESSMENTS King County To navigate.
Online Recruiting System Hiring Manager Presentation This presentation will take about 15 minutes. Click on your mouse to go to the next slide OR click.
1. On the homepage, click the “Register” link below the Login box in the left navigation bar. Registration Step 1.
How To Use NCA’s Online Grant Application System.
Rev. May 2016 cuResearch User’s Manual. What is cuResearch? Introduction to cuResearch More information is available on the CURO website:
Continuing Professional Development How to fill in your summary online
How to Submit a External Tool Assignment
Using the HTML and CSS Validation Services
How to Use Members Area of The Ninety-Nines Website
ePAR - Secondary Assignment
Creating a Professional Development Task
NextGen Purchasing Calendar Year End 1099 Process
How to Submit Google Docs to the Homework Drop Box
Creating a Contract for Category 1
GSA eBuy Seller’s Tutorial
Presentation transcript:

Indiana Department of Transportation Professional Services Contracting System (PSCS) Letter of Interest Submittal (LoIS)

What is LoIS? LoIS stands for “Letter of Interest Submittal”. It is an on-line application in INDOT’s PSCS (Professional Services Contract System), through which Consultant\Vendors submit the Letters of Interest and all required PDF documents for a specific RFP (Request for Proposal) item, in order to be considered for selection for the needed services.

Submitting for Non-Prequal Types of Work

Help is available at any time by clicking this link. Choose an RFP (in most cases there will be only one) Choose an item from the drop down list. You will have to complete a separate submittal for each item that you wish to submit. Choose your office address of the office that will be responsible for the work. This will be used during scoring to calculate the distance between the office doing the work and the location where the work will be done. Select this button to create a list of firms that will be doing work on your team.

If a firm that you plan to use, is on the list, select the firm. If a firm that you plan to use is not on the list, type the firm name here.

Enter the percent of work that this firm will do on the item. The total percent of all firms used for this item must equal 100%. If you chose a firm from the list above, the BE Type will already be known. If you type a firm name in, you will need to check this box if the firm is a DBE firm.

If the type of work that the above firm will be performing is in the drop down list, select it. If the type of work that the above firm will be performing is not on the drop down list, type the type of work here in a few words.

After entering the information for a firm click the “Save” button to add this firm to the list of firms that will be doing work on this item.

The firm selected on the previous page now shows up on this list. In this example only one firm will be doing the work therefore we entered 100% for the amount of work this firm will perform on the item. If more than one firm will be doing work on this item, keep clicking this button and adding firms to the list until all firms have been chosen and the combined percent of all firms chosen equals 100%. If your firm is one of the firms working on this item, be sure to include it in the list. If an error was made when entering information for a firm, you can delete the firm from the list and start over any time before clicking the “Submit to INDOT” button at the bottom of the page.

Click the browse button and naviagate to each form to be uploaded from your computer. There will be a button for each required form. Each file must be a.pdf or.tif file and must be less than 20MB in file size. Enter your APB amount here. Enter the priority of this item compared to the priority of other items you have already entered. Each time you submit a new item for the current RFP, the priority list will show the priority of all items. You can re-prioritize items each time you submit a new item. Once the form is completely filled out, click the “Submit” button to send the information to INDOT.

If you would like to view or print a report showing the information you just submitted, click here. It is not required that you do this, but it will be your only chance to view or print your submittal information.

You can view, print, and/or save this report for your own records at this time only.

Click here if you would like to submit for another item, or to re-submit for any previously submitted items. Note: Any time you re-submit for an item that you have previously submitted, on the current RFP, the previously submitted item is overwritten by the re-submitted item. In other words, only the latest submittal for a specific item is valid.

Submitting for Prequal Required Types of Work

Choose an RFP, Item, and Office as explained in previous slides. Click here to create a list of firms that will be doing work for Prequal Required Categories.

Choose one of the firms that will be doing work in prequal required categories for this item. If your firm will be doing some or all of the work, be sure to include it in the list of firms doing work. Enter the percent of work that this firm will be doing on this item. Each time you select a firm from the drop down list, a list of categories that the firm is prequalified for, will be displayed. Check the category or categories that this firm will be working on. If this firm will be the lead firm for this category, check the “Lead Indicator” checkbox. There must be one Lead Firm per category. Each time you come to this page, you will see a list of categories that still need to be assigned to firms before the submittal can be sent to INDOT. Once you have entered the information for a firm, click the “Save” button to add the firm to the list of firms that will be working on this item.

The firm, along with the categories that the firm will be working on, have been added to your list of firms. Click here again if you need to add another firm for prequal required categories. Remember, all categories for the item must be assigned.

In this example I am choosing a second firm for prequal required categories. Only one category is left because I have already chosen firms for all the other categories for this item. Click the “Save” button to add this firm to your list of firms that will be doing work on this item.

Click this button if there will be any firms doing non-prequal required types of work on this item.

Choose or type a “Firm Name” and “Type of Work”, enter the percent of work the firm will be responsible for, and check the box if the firm is a DBE firm, as explained in a previous slide. Click the “Save” button to add this firm to the list of firms that will be doing work on this item.

In this example a list of all the firms that will be working on this item has been created and the total percent of work to be done equals 100%. At any time before clicking the “Submit to INDOT” button, you can delete and/or add firms on your list.

Browse to the required files for uploading to INDOT as explained in a previous slide. Enter your APB amount as explained in a previous slide. Prioritize this item in relation to any other items that you have submitted. You can also re-prioritize previously submitted items at this time. Send the submittal for this item to INDOT.

If you would like to view or print a report showing the information you just submitted, click here. It is not required that you do this, but it will be your only chance to view or print your submittal information.

You can view, print, and/or save this report for your own records at this time only.

Click here if you would like to submit for another item, or to re-submit for any previously submitted items. Note: Any time you re-submit for an item that you have previously submitted, on the current RFP, the previously submitted item is overwritten by the re-submitted item. In other words, only the latest submittal for a specific item is valid.