Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.

Slides:



Advertisements
Similar presentations
Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
The role of information in water-related decision making.
AFSO Conference 8&9 October 2008 Presentation DIRECTORATE OF CORPORATE ARCHITECTURE AND ENGINEERING CIVIL ENGINEERING SECTION (DCAE) Jean-Claude Côté.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Proposed Regulatory Framework for Wastewater Presented by Claude Fortin Winnipeg, Manitoba December 6, 2007.
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
Wastewater Systems Effluent Regulations (Draft) Update Mohammed Karim, M.Eng., P.Eng. Senior Water & Wastewater Engineer Southern TC, LFN & UFN meeting.
MARINE SPECIALIST STUDY NamWater Desalination Plant EIA PISCES Environmental Services (Pty) Ltd.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
Hamlet of Rankin Inlet Type A Water Licence Application Role of Fish Habitat Management Fisheries and Oceans Canada Eastern Arctic Region Rankin Inlet.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
Kiggavik Project Final Hearing Presentation
Nunavut Water Board (NWB) Community Presentation Type “A” Water Licence Process for Baffinland Iron Mines Corporation’s (BIMC) Mary River Project Community.
After the Sanitary Survey
Water System Planning Study
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
November 2008 Eureka Facilities Meeting. Introduction.
Government of Nunavut Department of Environment Environmental Protection Division Intervention to the Nunavut Water Board City of Iqaluit Water License.
1 CanZinco Ltd. NWB Water Use Licence Renewal, 1AR-NAN0914 Nanisivik Department of National Defence Public Hearing October 8-9, 2014 Louis Lemay P.Eng.,
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Fisheries and Oceans Canada Intervention to the Nunavut Water Board on the Type A Water License Renewal for the Nanisivik Mine Project Fisheries and Oceans.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Disclosure of Preliminary Screening to MVEIRB In Nunavut all screenings are conducted by the Nunavut Impact Review Board (NIRB). NIRB conducts screening.
Nunavut Integrated Community Infrastructure Sustainability Plans CGS & Aarluk Consulting Presentation to the Nunavut Economic and Sovereignty Infrastructure.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Fisheries and Oceans Canada Fish Habitat Management Program Intervention to the Nunavut Water Board on the Doris North Gold Project Cambridge Bay August.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
2006 Socio-economic component CUMBERLAND RESOURCES LTD.  Baseline  Impact Assessment  Mitigation and Benefit Enhancement  Monitoring  Intervener Comments.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Nwtboardforum.com For reference only. Not a legal document Inuvialuit Settlement Region.
Environment Canada’s Mandate and Role in the Mary River Project Review Water Board Community Meetings - Baffinland Pond Inlet, NU Mark Dahl / Anne Wilson.
Informational Meeting Indirect Discharge Permit October 12, 2010.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Final Plan Background rao6]Xu4 X6NAt5 ckwoz4mzb CanZinco submitted initial Closure Plan in February, 2002 Nunavut Water Board hearing held in Arctic Bay.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Review of Interventions ____________ CanZinco Ltd.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
KNK5 wmoEp5 vtmp5 GwmoEp5H kNo1k5 ne6tbw5 ckE5]giz “A” wm6j5 Mwnodt5 W5J]y5 b5hjz X=8M8 xwC8 s/C4ys6t5 fxS]En8 GX=8M8f5H k9]l/4 WoExz Community Session.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
Doris North Gold Mine Project Presentation to the Nunavut Water Board Technical Meeting Cambridge Bay, NU January 28-29,
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Grey Owl Municipal Water feasibility study
Nunavut Water Board Public Hearing
Agnico-Eagle Mines Ltd
Phase 2 Hope Bay Belt Project
Phase 2 Hope Bay Belt Project
Mr Ntandazo Vimba and Henri Marais
John Tinger U.S. EPA Region IX
WASTEWATER MANAGEMENT 19 September 2018
Delta Water Supply Project
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin Inlet By Jim Walls, P.Geo. Nuna Burnside Engineering and Environmental Ltd.

Licence Components CGS operates the water supply and sewage treatment infrastructure in Rankin Inlet – which are the subjects of this applicationCGS operates the water supply and sewage treatment infrastructure in Rankin Inlet – which are the subjects of this application All other NWB regulated infrastructure and operations in Rankin inlet are licensed by the Hamlet or other partiesAll other NWB regulated infrastructure and operations in Rankin inlet are licensed by the Hamlet or other parties

Application History Original Type ‘B’ Licence issued in 2002Original Type ‘B’ Licence issued in 2002 Expired November 2007Expired November 2007 Type ‘A’ Licence now required due to the size of the Hamlet and water usageType ‘A’ Licence now required due to the size of the Hamlet and water usage Type ‘A’ application includes a Public HearingType ‘A’ application includes a Public Hearing

Supporting Documents Operation and Maintenance PlanOperation and Maintenance Plan Emergency Contingency PlanEmergency Contingency Plan Monitoring and QA/QC PlanMonitoring and QA/QC Plan DFO intake guidelines assessmentDFO intake guidelines assessment Various engineering plans and reportsVarious engineering plans and reports

Agency Review The application and supporting documents reviewers included:The application and supporting documents reviewers included: -Nunavut Water Board (NWB) - Environment Canada (EC) - Environment Canada (EC) - Indian and Northern Affairs (INAC) - Indian and Northern Affairs (INAC) - Fisheries and Oceans Canada (DFO) - Fisheries and Oceans Canada (DFO) -GN – Department of Environment (DOE) -GN – Department of Environment (DOE)

Sewage Treatment Facility Utilidor and trucked sewageUtilidor and trucked sewage Sewage treatment plant operationSewage treatment plant operation Discharge of treated effluent to Hudson BayDischarge of treated effluent to Hudson Bay Disposal of sewage sludge at the Hamlet landfill siteDisposal of sewage sludge at the Hamlet landfill site

Sewage Treatment Facility Issues 1.Effluent discharge quality 2.Impacts of the effluent discharge on the marine environment 3.Sewage sludge disposal agreement with the Hamlet

Addressing the Issues Consulting engineers are working on design modifications to upgrade the plant and improve effluent qualityConsulting engineers are working on design modifications to upgrade the plant and improve effluent quality An environmental consulting company specializing in marine environments has been retained to study discharge impactsAn environmental consulting company specializing in marine environments has been retained to study discharge impacts The Hamlet and GN have agreed on a draft waste disposal agreementThe Hamlet and GN have agreed on a draft waste disposal agreement

Requested Conditions – Plant Upgrades Submit an engineering report outlining the proposed Sewage Plant upgrades and expected improvements to effluent quality by December 31,2010Submit an engineering report outlining the proposed Sewage Plant upgrades and expected improvements to effluent quality by December 31,2010 Submit a schedule for constructing the upgrades by December 31,2010Submit a schedule for constructing the upgrades by December 31,2010

Requested Conditions – Marine Impacts Submit a report on the findings of the Marine Impact Study including conclusions and recommendations by December 31,2010Submit a report on the findings of the Marine Impact Study including conclusions and recommendations by December 31,2010 Submit a schedule to conduct action as per the recommendations by December 31,2010Submit a schedule to conduct action as per the recommendations by December 31,2010

Requested Conditions – Sludge Disposal Submit a copy of a written agreement with the Hamlet for the disposal of sewage sludge in accordance with applicable waste disposal regulations by December 31,2010Submit a copy of a written agreement with the Hamlet for the disposal of sewage sludge in accordance with applicable waste disposal regulations by December 31,2010

Water Treatment Facility Nipissar Lake sourceNipissar Lake source Pipeline to reservoirPipeline to reservoir Storage and treatmentStorage and treatment Distribution systemDistribution system NWB licence is focussed on environmental impacts of the system not the quality of the delivered waterNWB licence is focussed on environmental impacts of the system not the quality of the delivered water

Water Intake Facility Issues 1)Amount of water pumped from the lake needs to be accurately determined 2)Impacts to Nipissar Lake due to drawdown needs to be assessed 3)Sustainability of supply needs to be determined 4)Impacts to fish habitat needs assessment

Addressing the Issues A consulting engineering firm was retained in 2009 to conduct studies and evaluate impacts of withdrawals including:A consulting engineering firm was retained in 2009 to conduct studies and evaluate impacts of withdrawals including: - current and projected volumes - current and projected volumes -distribution system losses -distribution system losses -impact on Nipissar lake and recommendations for additional supply -impact on Nipissar lake and recommendations for additional supply

Requested Conditions Submit an assessment of the water supply capacity of Nipissar Lake and a detailed assessment of Hamlet water supply requirements for the future including conclusions and recommendations by December 31,2010Submit an assessment of the water supply capacity of Nipissar Lake and a detailed assessment of Hamlet water supply requirements for the future including conclusions and recommendations by December 31,2010 Submit a schedule to address recommendations by December 31,2010Submit a schedule to address recommendations by December 31,2010

Summary CGS is requesting a Type ‘A’ NWB licence for water supply and sewage treatmentCGS is requesting a Type ‘A’ NWB licence for water supply and sewage treatment Documents outline the information available and provide detailed plans to operate the facilities and address data gapsDocuments outline the information available and provide detailed plans to operate the facilities and address data gaps Recommended ‘Conditions’ include a realistic scheduleRecommended ‘Conditions’ include a realistic schedule

Input from Elders needed Have you seen any impacts to fish, marine mammals or water quality from the sewage discharge?Have you seen any impacts to fish, marine mammals or water quality from the sewage discharge? Have you seen any impacts on the water levels in Nipissar Lake caused by taking water for the Hamlet?Have you seen any impacts on the water levels in Nipissar Lake caused by taking water for the Hamlet?

Questions and Comments? Thank you - QujannamiikThank you - Qujannamiik