STRIVING TO MAKE STORMWATER GREEN PCSM Plans Common Mistakes, Notes, etc. Presented by Aneca Y. Crews PADEP-SERO.

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
MCM 5 – Post-Construction Runoff Control (DRAFT) YES NO Post-construction stormwater management for that construction activity is in compliance with MCM5.
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
Stormwater 101: How to stay out of trouble with TDEC.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Antrim Township Stormwater Management Reviewing Engineer: Dewberry-Goodkind, Inc.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Design of Infiltration Practices
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
SAINTPAUL SUSTAINABLE BUILDING POLICY Saint Paul Sustainable Building Policy Training Module 7 Stormwater Management.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Construction Site Best Management Practices and the Project Design Process.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Low Impact Development (LID)
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
San Rafael, California November 12, 2015
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Benefits of the Pre-Application Meeting Informal Pre Application Meeting Discuss general design concept Bring up any issues with meeting the regulations.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
City of Clarksville Storm Water Management Manual Revisions 2014.
Municipal Separate Storm Sewer System (MS4) Permit
Supervisor, RIDEM RIPDES Permitting Program
Critical Stages – What is required on the plan and in the field
TPDES Construction Management at the City of Laredo
What is Required to Achieve Worksheet 10
Stormwater Management Program
EPA Public Meeting Dallas, Texas May 10, 2005
Presentation transcript:

STRIVING TO MAKE STORMWATER GREEN PCSM Plans Common Mistakes, Notes, etc. Presented by Aneca Y. Crews PADEP-SERO

2 Agenda Common Mistakes PCSM Plan Notes Stormwater BMP Information Chart 5B

3 Common Mistakes

4 Insufficient infiltration documentation –No testing performed, not enough tests performed, test field logs not provided, –Unacceptable testing techniques utilized Testing not performed at location(s) or elevation(s) of proposed system(s) Avoid using the “perc” test Use infiltration test that determines hydraulic conductivity. –No geotechnical information provided –Reduction factors not used

5 Common Mistakes Runoff from impervious surfaces are conveyed directly to infiltration systems –Pretreatment should be provided for stormwater runoff prior to entering a subsurface infiltration system. Clogging from sediment and debris→Failure Off-Site Discharges –Discharges are not going to well defined drainage features –Not identified in the Notice Of Intent (NOI)

6 Off site discharge (Section C) Becoming a common problem.

7 Off Site Discharges –Easements (Legal Issue) Fact Sheet Follow bulleted items –Analysis of discharge Discharges to non-surfaces waters need to demonstrate that the discharge will not cause erosion or damage –Discharge to Non-Surface Water: Level Spreader Conveyance Inflow h Y X Level Spreader Undisturbed Ground Profile View N.T.S. Plunge Pool Outflow Suitable rigid measures and protective geofabric (TRM)- min. 3 ft. or as needed. Optional Drain. 2” ductile iron Driven horizontally

8 Common Mistake Modified Rational Method used for Runoff Volume calculations. –National Resources Conservation Service (NRCS) methods must be used for Volume calculations. –The Modified Rational Method is not acceptable. Potential Pollutants/Contamination –Not identified on the NOI –Contamination documentation not provided –For Site Specific Standard or Non-residential Statewide Health Standards proper Erosion and sediment (E&S) not utilized

9 Common Mistake Not requesting a Pre-application meeting –Projects of complex nature or varying from PA Stormwater Best Management Practices (BMP) Manual should request pre-application meeting. –Conservation District and/or DEP Inconsistencies between plans, details, and calculations –Inconsistent submittals will cause confusion and increase review time.

10 Common Mistakes Structural/Non-Structural (NS) BMP Volume Credit –Volume reduction credit can only be taken for runoff reaching the proposed BMP during the 2-yr 24 hour storm or a smaller event –No more than 25% of required volume reduction achieved through NS –Can not claim volume credits on Worksheet 5 for extended detention

11 Non Structural Credits from WS 3 Other credits for Non-Struct. BMPs are listed in Chapter 8 of BMP Manual such as: BMP Protect/Utilize Natural Flow Paths Credit = ¼” x Area BMP (pt. 2) Revegetate/Reforest Credit = 6 cf/tree Deciduous or Credit = 10 cf/tree Evergreen

12 Checklist: Criteria and Credits for Non Structural BMPs Checklists are found in Ch. 8 (Section 8.8) Checklists are required when seeking NS Volume Credit To receive credit, each box should be checked.

13 NPDES Application (rev. 12/2009)

14 Updated Worksheet 5 NEWOLD

15 Worksheets Worksheets 1 thru 5 and 10, should be completed for each point of interest.

16 Nitrates Compliance Worksheet 10 can be misleading. Only use when can meet Volume Control Guidance (CG-1). –If not, complete WS 11 to 13 Should control runoff from at least 90% of the disturbed area. –If not, also need WS 12 & 13. –WS 12 – Pollutant Loading –WS 13 – Pollutant Reduction

17 Standard Notes

18 Standard Notes Ownership, Operations, and Maintenance Procedures (Must be included on drawings) –Applicant or entity (association, company, agency, etc.) listed as responsible party Provide Quality Control of Materials. As with all BMPs, the final product is only as good as the materials and workmanship that went into it. The designer is encouraged to review and approve materials and workmanship, especially as related to aggregates, geotextiles, soil and topsoil, and vegetative materials.

19 Standard Notes Do not compact soil infiltration beds during construction. Prohibit all heavy equipment from the infiltration area and minimize all other traffic. Equipment should be limited to vehicles that will cause the least compaction, such as tracked vehicles. Protect the infiltration area from sediment until the surrounding site is completely stabilized. Methods to prevent sediment from washing into BMPs should be clearly shown on plans. Where geo-textile is used as a bed bottom liner, this should be extended several feet beyond the bed and folded over the edge to protect from sediment wash into the bed during construction, and then trimmed. Runoff from construction areas should never be allowed to drain to infiltration BMPs. This can usually be accomplished by diversion berms and immediate vegetative stabilization. If an infiltration area is also to be utilized as a temporary sediment basin, excavation should be limited to within 1 foot of the final bottom invert of the infiltration BMP to prevent clogging and compacting the soil horizon, and final grade removed when the contributing site is fully stabilized. All infiltration BMPs should be finalized at the end of the construction process, when upstream soil areas have a dense vegetative cover.

20 PCSM Notes & Permit Special Conditions 1. A Notice of Termination (NOT) will be required to be submitted following approval of the final as-built plans. Prior to accepting the NOT, the Department and/or Conservation District will perform final inspection to ensure site stabilization and verify adequate installation and function of stomwater best management practices (BMPs) 2. As-built plans for the stomwater BMPs for each project phase shall be provided within six months following the completion of each phase. The as- built plans shall be signed and sealed by a PA Registered Professional Engineer. 3. The Permittee shall provide engineering construction oversight for the proposed stormwater BMPs. Additional soil testing may be required prior to the installation of infiltration BMPs to ensure proper location and function. 4. The permittee shall provide for engineering construction oversight for the proposed stormwater best management practices (BMPs). A licensed professional engineer knowledgeable in the design and construction of stormwater BMPs, preferably the design engineer, shall conduct oversight.

21 STORMWATER BMP INFORMATION CHART 5B

22 Stormwater BMP Info Chart 5.B Why is this needed? –A condensing of the calculations for proposed BMP’s –Highlights common mistakes Supporting calculation/documentation should be included in Stormwater Report

23 Stormwater BMP Info Chart 5.B

24 Infiltration Information

25 Stormwater BMP Info Chart 5.B

26 Drainage Information

27 Stormwater BMP Info Chart 5.B

28 BMP Information

29 Stormwater BMP Info Chart 5.B Foot notes reference Appendix C of the PA BMP Manual under Site conditions and constraints and Design consideration

30 2-year 24-hour storm only Similar to WS 4 but limited to drainage to indiv. BMP (Post Dev)

31 Section C – E&S and PCSM Stormwater BMP Chart 5B should match the summary table in section C.2 of the NPDES application. Both should match Stormwater Report

32 How to expedite the review Submit a complete application Follow the application instructions and BMP Manual. Provide volume control for difference in 2-year w/o any voodoo hydrology. Utilize Worksheets and supporting checklists. (for each point of interest) Request a preapplication meeting with CD and/or DEP. Communicate with reviewer to better understand outstanding issues and find viable solution

33 Timeframes* for NPDES Approval: Varies among by region and county. PAG-2: –45 to 100 days Individual Permit: –3 to 6 months Add another 60 days if a public hearing is required. Each deficiency letter allows 60 days to provide a complete response *Timeframes above assume a reasonably quick turnaround by designers to comments.

34 Stormwater BMP Highlights Chapter 3- Principles & Control Guidance Chapter 5- Non-structural BMPs Chapter 6- Structural BMPs Chapter 8- Methods & Worksheets Appendix C – Site Evaluation & Soil testing NOI checklist & instruction

35 FIN Questions? Contact Info: Aneca Y. Crews Stormwater Section PA DEP - SERO

36 Checklists Criteria and Credits for Non-Structural BMPs. –Plan requirements –Required for most submittals requesting NS Credits.