MS4 Opening Meeting 2007 Palm Beach County MS4 Year 4 Audit.

Slides:



Advertisements
Similar presentations
Compliance Monitoring Orientation. Monitoring Components Focus Site Review/Fiscal Monitoring SPAM.
Advertisements

Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Course Content Purpose of the Form I-9 Purpose of the Form I-9 Introduction to the Form I-9 Introduction to the Form I-9 Form I-9, Section 1 Form I-9,
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
OSEP QUARTERLY CALL WITH PARENT CENTERS PART B FINAL REGULATIONS RELATED TO PARENTAL CONSENT FOR THE USE OF PUBLIC BENEFITS OR INSURANCE Office of Special.
High-Quality Supplemental Educational Services And After-School Partnerships Demonstration Program (CFDA Number: ) CLOSING DATE: August 12, 2008.
Final Determinations. Secretary’s Determinations Secretary annually reviews the APR and, based on the information provided in the report, information.
Division of Housing & Community Development
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
What is it and what can it do for me?
SMARTS Training definitions CGP transition plan Pilot project discussion SMARTS Manual review 1.
1 Susan Weigert, Project Officer GSEGs Overview of GSEG Management.
National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Opening Meeting 2009 Palm Beach County NPDES MS4 Year 6 Audit.
Awarded School GME Training March 28, 2013 AZ CSP FY
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
Title I Technical Assistance Training Federal and State Programs.
First 5 LA Invoicing & Budget Modification Workshop OHCD Contractors FY
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
CPSP Application Overview Candice Zimmerman, CPSP Manager Lorraine Cardenas, Program Analyst November 2, 2011.
OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring and Reporting 2009 CSP Grant OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
School Budget (Draft)
WEBGRANTS.COMMUNITY.UTAH.GOV Division of Housing & Community Development.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
VI. Developing a VSMP Program General Stormwater Training Workshop.
HIPAA PRACTICAL APPLICATION WORKSHOP Orientation Module 1B Anderson Health Information Systems, Inc.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Monitoring and 638 Contract Close-out. Contract Monitoring and Close-out After Award ▫ Meet with Tribe to discuss the Agreement  Include Monitoring Plan.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Rhonda Anderson, RHIA, President  …is a PROCESS, not a PROJECT 2.
On Site Review Process Office of Field Services Last Revised 8/15/2011.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Presented by: Jan Stanley, State Title I Director Office of Assessment and Accountability June 10, 2008 Monitoring For Results.
Schoolwide Consolidation Consolidation Legislation and Guidance Title I Schoolwide Fiscal Guidance issued February, 2008 [Section E] Designing Schoolwide.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
MS4 Opening Meeting 2008 Palm Beach County MS4 Year 5 Audit.
Title I, Part A Preparing for Federal Program Monitoring Lynn Sodat Virginia Department of Education Office of Program Administration and Accountability.
Overview of 3 rd Party Inspection Program for USTs.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Brimbank IMS Club Manager Ashley Fleming Sport and Recreation Coordinator.
PH - (405) Fax - (405) Municipal Separate Storm Sewer System (MS4) Audits: The Oklahoma Experience Carrie Evenson, Ph.D., P.E. Oklahoma.
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
NJDOE Testing for Lead in School Drinking Water
NetDMR.
Construction Oversight
After the FCC Form 471 E-rate Program Applicant Training
The Federal programs department September 26, 2017
Acceptance Process for Manufactured Products by Certification:
NH MS4 Stormwater Permit -- Guidance for NHDES related provisions
Compliance Monitoring Activities State Inspections
Overview of the FEPAC Accreditation Process
Campus ESSA Grant Packet Training
Division of Food and Recreational Safety
FY19 Federal Grant Monitoring: Titles I, II, IV
Management Verifications & Sampling Methods
Confidentiality Frequently Asked Questions
How Do I Write a Good Technology Plan?
Multi-Sector General Permit: MSGP
System Safety Regulation
Presentation transcript:

MS4 Opening Meeting 2007 Palm Beach County MS4 Year 4 Audit

DEP & SAIC Points of Contact SAIC MS4 Inspector: Robert van den Akker SAIC Science Drive Orlando, FL Ph: (407) Fax: (703) DEP Contact: Sarah Jozwiak Ph: (850)

Overview  Audit Schedule  Annual Permit Assessment Process  Audit Opening Meeting Opening Meeting Records Review Records Review Special notes Special notes  Annual Report Section VII, Columns C – F Section VII, Columns C – F Attachments Attachments Signatory Requirement Signatory Requirement  Permit Reapplication

Year 4 Audit Schedule DateTimeActivityPermitteeLocation July 16th MON. 1:00 – 5:00 Records Review/ Site Visits City of West Palm BeachCity of West Palm Beach Offices July 17th TUE. 8:00 – 12:00 Records Review/ Site Visits Village of WellingtonVillage of Wellington Offices 1:00 – 5:00 Records Review/ Site Visits Village of Royal Palm Beach Village of Royal Palm Beach Offices July 18th WED. 9:00 – 11:30 Joint MeetingAll Permittees Northern Palm Beach County Improvement District Offices 357 Hiatt Drive Palm Beach Gardens 1:00 – 3:00 Records Review/ Site Visits City of GreenacresCity of Greenacres Offices 3:00 – 5:00 Records Review/ Site Visits City of Lake WorthCity of Lake Worth Offices July 19th THURS. 8:00 – 12:00 Records Review/ Site Visits City of Boynton BeachCity of Boynton Beach Offices 1:00 – 3:00 Records Review/ Site Visits City of Riviera BeachCity of Riviera Beach Offices 3:00 – 5:00 Records Review/ Site Visits Village of North Palm Beach Village of North Palm Beach Offices *Reserve date* July 20th FRI. 8:00 – 10:00 Possible Records Review/Site Visits City of Lake WorthCity of Lake Worth Offices 10:30 – 12:30 Possible Records Review/Site Visits Village of North Palm Beach Village of North Palm Beach Offices

Annual Permit Assessment Process Submit: Annual Report Receive: Audit Notification *and AR Comments* Letter **Possibly Submit: AR Comment Response **Possibly Provide for Review: Audit Materials (records & ordinances) **Possibly Receive: Audit RAI Letter **Possibly Submit: Audit RAI Response Receive: Year 3 Permit Assessment Letter **Possibly Submit: Permit Assessment Response **Possibly Receive: Addendum to Permit Assessment Letter

Audit: Opening Meeting  AR Comments Inspector’s AR comments...some in addition to DEP’s Inspector’s AR comments...some in addition to DEP’s Any questions on DEP’s AR Comments Any questions on DEP’s AR Comments Submittal of response Submittal of response  Permit reapplication to be submitted with Year 4 AR  General questions?

Audit: Records Reviews  The records reviews focus on correlating the data reported in the AR in Column C with the permittee’s documentation/records reported in Column D for each reporting item.  When a large number is reported, need to see at least a sample of the record reported.  Provide records from the reporting year only.  The implementation of any non-reportable requirements, such as legal authority, policies, procedures, will also be reviewed.  Site visits will be conducted as time allows.

Audit: Satisfactory Records  Must have a record/documentation for every value reported in Column C. Just like taxes...you need receipts for those deductions! Just like taxes...you need receipts for those deductions!  Can estimate values for certain reporting items but still need to document how the estimate was arrived at.  The record must be an actual record documenting the value reported. A copy of the Construction Activities brochure does not document that 75 of them were distributed. A copy of the Construction Activities brochure does not document that 75 of them were distributed.  The record must clearly reflect the reporting item was accomplished. A list of construction projects does not demonstrate that pre- construction reviews for E&S controls were performed for them. A list of construction projects does not demonstrate that pre- construction reviews for E&S controls were performed for them.

Audit: Special Notes  Inspectors may change from year to year  The program is evolving – it is not static  Purpose of the annual report review and audit is for DEP to get an in-depth view of how well the permit requirements are being implemented  The annual report is also for: Your benefit for next year’s report Your benefit for next year’s report Analysis of yearly MS4 activities Analysis of yearly MS4 activities  EPA and DEP

AR: Most Common Reporting Errors  Not explaining why reporting “0” activities in Column C for: Pro-active illicit discharge inspections Pro-active illicit discharge inspections Training (illicits, spills, construction) Training (illicits, spills, construction) Inspections (MS4, muni. facilities, constr. sites) Inspections (MS4, muni. facilities, constr. sites) Pesticide/herbicide certifications (if report “0” for both personnel & contractors) Pesticide/herbicide certifications (if report “0” for both personnel & contractors)  Leaving gaps in Column D or Column E when reported a value in Column C  Not reporting an actual document name, or the correct document name, in Column D

AR: Section VII, Column C  Only numbers or a frequency (if specified in the reporting item) are to be inserted here.  Do not leave Column C blank or insert “N/A” if no activities, rather insert a “0” and explain why the lack of data.  Only report a value in Column C if have a record to support it. If no record, need to report “0.”  Place any notes/comments regarding the reported values in Column F.

AR: Section VII, Column D  Be as specific as possible about the actual title of the record/document.  Avoid generic terms such as: Log, spreadsheet, folder, file, checklist, report, Log, spreadsheet, folder, file, checklist, report, Paper records, electronic file, Excel, database Paper records, electronic file, Excel, database Public Works files Public Works files  Avoid the name of an entity such as: Streets Dept. Streets Dept. Bob Green Bob Green Volunteers Volunteers

AR: Section VII, Column D (cont.) Indicate the full title and type of the record from which the values in Column C were obtained: Commercial/Residential Construction Site Inspection Checklists Commercial/Residential Construction Site Inspection Checklists Green Turf Monthly Invoices Green Turf Monthly Invoices JMC Services, Inc. Invoices (2/3/06, 6/10/06) JMC Services, Inc. Invoices (2/3/06, 6/10/06) to Bob Green, Public Works Director, from Jane Smith, WAVE, on 8/6/06 to Bob Green, Public Works Director, from Jane Smith, WAVE, on 8/6/06 Streets Division Monthly Summary Reports – Activities #60 and #61 (or name the line items) Streets Division Monthly Summary Reports – Activities #60 and #61 (or name the line items) Smirnoff Database – Search Code 112 Smirnoff Database – Search Code 112 Daily Work Orders – SW Codes 4, 5, and 9 Daily Work Orders – SW Codes 4, 5, and 9 Illicit Discharge Training Sign-in Sheet (6/12/06) Illicit Discharge Training Sign-in Sheet (6/12/06) DEP Qualified Stormwater Management Inspector Certifications DEP Qualified Stormwater Management Inspector Certifications

AR: Section VII, Column E  Be as specific as possible. Include the department name as well as the particular division, and even the responsible person’s position title. Include the department name as well as the particular division, and even the responsible person’s position title.  If more than one entity conducts the activities under a single permit requirement, such as the municipality and the county, list both with detail – do not simply state “Palm Beach County” as the other entity. Also, include the POC for that entity.  Be sure to include the name of any contractors hired to perform an activity.

AR: Section VII, Column F  Reasons for permit requirements not completed  Reasons for variances from normal activities  Notes/comments regarding the entities performing the activities  Listing of names of certified/trained staff (if short list)  Indicate if number in Column C is an estimate and how it was arrived at  Provide information on any additional activities not recorded (so can’t be reported in Column C)

Permit Reapplication: Comments Requested by DEP  Part II of the permit Particularly Table II.A.1.a...need to include all components of your MS4 and inspection and maintenance frequencies Particularly Table II.A.1.a...need to include all components of your MS4 and inspection and maintenance frequencies  Part III of the permit  Tailored MS4 AR Form Column B reporting items ONLY (all other parts of the form are per Rule (2), F.A.C.) Column B reporting items ONLY (all other parts of the form are per Rule (2), F.A.C.)

Permit Reapplication: Permit Changes  All provisions will likely be applicable to all permittees but need to be implemented only as applicable. For example, Part III.A.5 now only applicable to County will likely be expanded to all munis. For example, Part III.A.5 now only applicable to County will likely be expanded to all munis.  For the purpose of greater clarity:  Additional requirement details, either pulled directly from Part II or new language.  Additional annual reporting detail, but not the full list of items in tailored forms. Trying to sync the permit more with the annual report form.  Moving around/splitting/combining  Moving around/splitting/combining of some provisions.

Permit Reapplication: Next Steps  Permit will not be reissued by expiration date Current permit will automatically be administratively continued until it is reissued Current permit will automatically be administratively continued until it is reissued Have no set schedule for when permit will be reissued Have no set schedule for when permit will be reissued  Use flow chart as guidance for permittee responsibilities and timing of steps  3 official versions: Draft → Intent to Issue → Final  Public notice required of: Draft & Intent to Issue  Facility Decision Schedule will be the first item you receive

SAMPLE FACILITY DECISION SCHEDULE Process Elements Projected Date of Completion Permit Application received (is complete)1/1/07 Effective Date of Permit Application (date of Decision Schedule Letter)1/7/07 Draft Permit/Fact Sheet to Applicant and EPA1/14/07 (A) Applicant to Publish Public Notice of Draft Permit (no later than)2/14/07 (B) Applicant to Provide Proof of Publication of Draft Permit Notice (no later than)3/1/07 (C) Public Comment Period Ends (no later than)3/16/07 (D) Intent to Issue (ITI) Permit/Fact Sheet to Applicant and EPA4/15/07 (E) Applicant to Publish Public Notice of ITI Permit (no later than)5/15/07 (F) Applicant to Provide Proof of Publication of ITI Permit Notice (no later than)5/23/07 (G) Public Petition Period Ends (no later than)5/30/07 (H) Final Permit to Applicant and EPA6/30/07 (I) USE THE FOLLOWING GUIDANCE TO FILL IN THE SCHEDULE: A. Draft Permit/ Fact Sheet to Applicant and EPA (Date 0)* B. Applicant to Publish Public Notice of Draft Permit (A + 30 days) C. Applicant to Provide Proof of Publication of Draft Permit Notice (B + 14 days) D. Public Comment Period Ends (B + 30 days) E. Intent to Issue (ITI) Permit/Fact Sheet to Applicant and EPA (D + 30 days) * F. Applicant to Publish Public Notice of ITI Permit (E + 30 days) G. Applicant to Provide Proof of Publication of ITI Permit Notice (F + 7 days) H. Public Petition Period Ends (F + 14 days) I. Issue Final Permit (F + 30 days)* * These are estimated dates that are not based on the administrative timelines for permitting.

Future Reporting  Year 5: 10/01/06-09/30/07, due 03/30/08  Year 1: 10/01/07- 1yr. from re-issuance date, due 6 months later Will be longer than 12 months Will be longer than 12 monthsExample If the permit is reissued on 12/10/07: Year 1: 10/01/07-12/09/08, due 06/09/09 Year 2: 12/10/08-12/09/09, due 06/09/10

Permit Template Review  DEP developed a permit “template” to try to achieve more consistency…your permit will likely look very much like the template  DEP is striving for more consistency in the permits: With DEP rules & policy With DEP rules & policy With Federal rules & policy With Federal rules & policy Between permits Between permits Among like permittees (e.g., FDOTs) Among like permittees (e.g., FDOTs)

DEP & SAIC Points of Contact SAIC MS4 Inspector: Robert van den Akker SAIC Science Drive Orlando, FL Ph: (407) Fax: (703) DEP Contact: Sarah Jozwiak Ph: (850)