Isolde logging data analysis application Andrea Moscatelli Emiliano Piselli Jose-Luis Sanchez Alvarez.

Slides:



Advertisements
Similar presentations
LEARNING PLAN REMEMBERING TIPS. CONSTRUCT A timeline for studying the material.
Advertisements

BE/OP/PSB Section meeting, 23 Oct 2012 Martino Giordano Ferrari - Emiliano Piselli 1 Synoptic Editor & Player …past, requirements, project status, future...
By Rohen Shah – rxs07u.  Introduction  Different methodologies used  Different types of testing tools  Most commonly used testing tools  Summary.
Morbadevi Softwares Work with ease… Ready-Made Garments Management Software Demo By Morbadevi Softwares®2014, All Rights Reserved.
Network Performance Measurement
Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB.
© Tally Solutions Pvt. Ltd. All Rights Reserved Customisation of Shoper 9 October 2009.
Lime is… …an interactive visual analysis tool connected to Dynamics NAV Graphical representation of NAV data in your browser Real-time visualization of.
Visual Database Optimization Team Clint Johnson, Sunpreet Jassal, Thanh Nguyen-Huynh & Masamichi Sugihara. Oct. 17, 2006.
Micro Manager Performance Tracking System Rashed Hossain Sponsor: Nizam Ahmed Director of Finance and Administration Market One Enterprises.
The Jukebox Orian Paz & Yair Cleper Instructor: Viktor Kulikov Semester: Spring 2009 Final Presentation.
Automating Tasks With Macros. 2 Design a switchboard and dialog box for a graphical user interface Database developers interact directly with Access.
Modeling: where to start A state of the art and other amenities M. Risoldi - Oct. 11, 2005 A state of the art and other amenities M. Risoldi - Oct. 11,
Group # 3 Week 6. Progress so far ► Choice of platform and technology ► Start coding for GUI.
Domain Specific Kit for Business Rule Management By Netsoft.
Implementation classes and developing relational databases IS Development Lecture 9.
Computer Science & Engineering 2111 CSE 2111 Lecture Querying a Database 1CSE 2111 Lecture- Querying a Database.
Advanced Workflow. Agenda 1. Understanding the Overall Architecture 2. Setting up Outlook for Workflow 3. Launching Workflow from Applications 4. Getting.
CERN ORACLE DEVELOPERS FORUM 5 Nov 2001 Adding Mathematica Software to an ORACLE database Roberto Terenzi CNR-IFSI & INFN CERN.
Web Database Design Session 6 and 7 Matakuliah: Web Database Tahun: 2008.
MySQL GUI Administration Tools Rob Donahue Manager, Distributed Systems Development May 7th, 2001 Rob Donahue Manager, Distributed Systems Development.
Unit B065 – Coding a solution PREP WORK 1)Make sure you keep a work log / diary. Use the table on page 16 of the hand book as a template 2)Keep a bibliography.
Final Year Project Interim Presentation Software Visualisation and Comparison Tool Presented By : Shane Lillis, , 4th Year Computer Engineering.
Spring 2011 CIS 4911 Senior Project Catalog Description: Students work on faculty supervised projects in teams of up to 5 members to design and implement.
Errors Part I Error Messaging Error Handling Conclusion Questions What is an Error What is VBA Types of Errors Error Commands Error Flow Error Trapping.
Team and Client Rajiv Chalasani- Project Manager Mark Goesmann – Lead Designer Kevin Staake – Lead Implementer Dave Nyman – Quality Manager Client : Mr.
CYBORG Domain Independent Distributed Database Retrieval System Alok Khemka Kapil Assudani Kedar Fondekar Rahul Nabar.
Technische Universität München Application Performance Monitoring of a scalable Java web-application in a cloud infrastructure Final Presentation August.
A ISP free video conferencing application for mobile devices using wireless and VoIP Technology.
CMW-Admin Joel Lauener BE-CO-IN. CMW-Admin Administration GUI for CMW device servers (FESA, FGC, GM, PROXY, PVSS) Major changes under the hood New log.
Creating new system models file design fundamentals relational databases revisited file design for sunrise systems form design revisited the cornucopia.
$aveZone Milestone 2 - Update $aveZone Milestone 2 - Update Fifth team: Dima Reshidko Oren Gafni Shiko Raboh Harel Cohen.
Analysis, & future direction A FRAMEWORK FOR OFFLINE VERIFICATION OF BEAM INSTRUMENTATION SYSTEMS.
3D Visualisation of Sensor Information on Google Android platform Final Year BEng Project Maciej Gryka, University of Surrey,
By : SAG3 Members.  Cross platform client interface for Time recording/capturing  MS Project integration to Time tracker  integration to Time.
Computer-Controlled Railroad Simulator Adrian Anderson
Visual Studio.NET Using J# Based on Microsoft.NET Training Summer 2004 Slides adapted from
Debt Collector Tool Raul Graterol Sponsor by A Snap On Dealer.
Data analytics and mash-up Real time analytics of employment data Team Shadowfax 1/25/2016 CMPE Class Project 0.
Charting Tool A tool for a computerised Master chart (developed for Mumbai Central Division, Western Railway) IIT Bombay, Western Railway Presentation.
Presentation Layer (Graphical User Interface) AppGUI Logic Layer (Business Logic and data access) Network Discovery Device Information Extraction Network.
Historical view for CMS job monitoring CERN, Summer student 2009 Student: PAVEL ŠIKTOROV Supervisor: JULIA ANDREEVA.
Mr. Justin “JET” Turner CSCI 3000 – Fall 2015 CRN Section A – TR 9:30-10:45 CRN – Section B – TR 5:30-6:45.
PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL.
Introduction Characteristics of USB System Model What needs to be done Platform Issues Conceptual Issues Timeline USB Monitoring David Harding Front page.
CS 6361 Fall 2005 University of Texas at Dallas Semi-Formal Specification of Synergy Distributed Meeting Scheduler Jeannette Bennett Roberto Bruni Mike.
SAL-I PROJECT PROPOSAL Development of a Web-based GUI for SAL.
IT274 Intermediate C# Programming Instructor : Vladimir Gubanov, PhD AIM : vladimirg77.
Iterative Design and Evaluation of Event Architecture for Pen-and-Paper Interfaces HCI Group Stanford University Ron B. Yeh Andreas Paepcke Scott R. Klemmer.
Java SWING and Model View Controller (MVC)
ANDROID APP FOR HIVETRACKS.COM SERVICE
MS Access Introduction Database Design.
Gabe Cano, Altarum Institute  Mark Perry, Altarum Institute 
Multilevel Marketing Tree Viewer
Objectives of the Presentation
Use of Multiple Devices
Belkin Router Customer Service
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Java API for Database Connectivity
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
Graphical Analysis of Motion
Graphical Representation of Data 1: Tables
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
THANK YOU for helping make tonight possible
Presentation transcript:

Isolde logging data analysis application Andrea Moscatelli Emiliano Piselli Jose-Luis Sanchez Alvarez

Objective 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Implement a GUI using standard BE-CO java libraries in order to visualize Isolde devices log’s data Define devices list to be logged

CERN Graphic libraries CERN Graphic libraries CERN DataBase CERN DataBase : Interface: Data mining: 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Data flow

Application 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez

Device selection Quick selection/deselection 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Application

Selection interval Quick choices Customized choice 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Application

Graphical representation Floating legend 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Application

Detailed value table 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Application

The table appears on the right side 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Application

Final considerations While getting data the application could becomes slow. 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Values retrieved VariablesInterval timeDelay  week81 ms  week234 ms  week2,463 s  week4,732 s  week10,474 s Soon connected to the working set Soon connected to the elogbook

Thanks! 16/09/2011A.Moscatelli - E.Piselli - J.L. Sanchez Alvarez Questions?