APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May 12 2009.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
Beam Noise APEX May 1, 2009 Carl Schultheiss Michiko Minty.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
RHIC pp 500 GeV development M. Bai C-A Department.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Simulation of Spin Interference and Echo Effect Abstract Successively jumping across a depolarization resonance twice produces interesting spin dynamics.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
Accelerating Polarized Protons to High Energy Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
APEX Schedule April :30am12:30pm5pm IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm Nonlinear Chromaticity (Response.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Beam-Beam simulation and experiments in RHIC By Vahid Ranjbar and Tanaji Sen FNAL.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Operational experience of the AGS eIPMs
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Wire almost entirely through beam before BLM triggers dump
Wednesday h18: 228b fill lost just before start of ramp.
Presentation transcript:

APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May

APEX Schedule April am9pm7pm11:30pm Injection 08-29, Polarimeter study Huang, Zelenski +team 2am Ramps BBQ DA measurement with AC dipole Bai Pilat 7am Injection BBQ 10 6 turn BPM AC dipole 07-19, Noise from Main PS Schultheiss Minty D0-DX study MacKay Satogata Long Range beam-beam Fischer +team Store BBQ Injection

APEX Schedule May 4 th amnoon Injection 3pm Ramps BBQ 4pm 07-19, Noise from Main PS Schultheiss Wilinsky D0-DX study MacKay Satogata

RHIC/AGS Polarimeter Study Fixed target polarization for two intensities (1.4 and 1.6*10 11 ) with 12 bunches in both rings with two polarimeters. AGS measurements were done with similar intensity. Polarization profile measurements were done with both rings and both planes with 56 bunches. AGS horizontal and vertical profiles were taken the same time. Sweep and fixed target measurements were done with 56 bunches for comparison. Note: Keith tuned emittance down for AGS before the study, we did not see much change on AGS IPM or CNI target scan, but the polarization profiles measured in AGS is flatter than before. Huang, Zelenski+team

Polarization Profiles of RHIC and AGS Ring Horizontal P 0 sigma Vertical P 0 sigma AGS Blue Blue Yellow The profiles are consistent between AGS and RHIC with the statistics. The  actually is  P /  I. These numbers from last year at 100GeV are averaged 2.5, this year is about 3(average of many fills). Given the large error bars, I can’t say there is profiles developed in RHIC ramp.

PS beam noise - summary Four ramps were executed with different configurations of the electrostatic shield and a capacitor across the grounding resistors. Schultheiss, Minty

Ramp 1 Results

Conclusions Floating the Electrostatic Shields in the Dipole Ramp PM reduced the noise during the ramp. Yellow showed more reduction than Blue. The Capacitor had a less dramatic reduction in the noise. The present configuration is with the shields floating and no capacitor.

Plan for the experiment Use pattern BBLR_34x34 (28x non-colliding bunches), 2e 11 /bunch, accelerate and collide, will not ramp up the RF voltage CNI emittance measurement => emittances measured around 35 (Blue) and 22 (Yellow) mm.mrad : BBQ was left one during the ramp 5A, position scan in Blue and Yellow, orbit and BTF measurements Retract, CNI emittance measurement => around 50 (Blue) and 22 (Yellow) mm.mrad 50A, position scan in Blue and Yellow, orbit and BTF measurements Retract, CNI emittance measurement Time permitting, change chromaticity, repeat one scan Fischer Robert-Demolaize Calaga

Conclusion Plan executed: distance scans with both 5A and 50A scans in both beams, including head-on beam-beam. Suffered from larger than usual emittance (about 30 mm.mrad); BBQ should be off next time. Additional beam time to study in details the behavior of non-colliding bunches + chromaticity changes ?

MacKay, Satogata

APEX Schedule May am10pm7pm1am Injection High intensity 3am Space charge and Beam-beam Fedotov + team 7am Off-momentum beta-beat Calaga Glenn Long Range beam-beam Fischer Demolaize +team Store BBQ Injection High intensity Gamma-T No snakes Bunch length limit Ptitsyn+ team Impedance Calaga