Omega KDC-10 Air-to-Air Refueling Procedures. KDC-10 Tanker Former Japan Airlines DC-10-40 modified for air-to-air refueling (AAR) Flight Refueling Limited.

Slides:



Advertisements
Similar presentations
Ferry Fuel System Reference: Pilot Int’l PI-1200M Manual dtd
Advertisements

Training the Best…To Lead the Rest Lt Col Regan ‘Claw’ Patrick
CPL Air Law ATC Chapters 3.
Air Traffic Management
Air Refueling Procedures Brief
Cessna C500 Fuel System hello and welcome to my talk on the c500 fuel system.
Engine Systems J-52-P408 &J-52-P6/P8
FP-2 T-44 Ops Limits Overview System Limitations Propeller Limitations Starting Limitations Engine Limitations Airspeed Limitations Miscellaneous Limitations.
Contact Maneuvers.
High-Pressure Air Bags 101
Omega Tanker K-707 Air Refueling Procedures Brief
Aerodynamic Theory Review 2
PROFILES & PROCEDURES FOR PIPER WARRIOR & CHEROKEE
SAFETY MEETING Off Highway Trucks. Brakes There are four separate controls used for braking Service Brake Retarder Secondary Brake Parking Brake.
Love the One You’re With Tom Bell Go Home with the One That Brought You or.
Omega Tanker (K-707) Air Refueling Procedures Brief
Instrument Ground Training Module 5
Instrument Ground Training Module 4 & 5
4th Oct Ephesus - Turkey 4th of October 2003 Fly in Precise landing International competition Safety Briefing.
By “Leech” 18/11/08 v1.0 GT-1.6a Air-to-Air Refueling 1 st Virtual Fighter Wing Initial Qualification Training.
Colorado Space Grant Consortium DemoSat-B Colorado State University Matthew Jui, Ian Patterson, Mark Spowart, Todd Wallis July Colorado Space Grant.
6. COMMUNICATIONS Radio Telephone (R/T) and Radio Navigation (R/N) services R/T Communications English is the standard language for all commercial flights,
Aircraft Systems Oxygen Systems A-4N/TA-4. Aircraft Systems Oxygen System LESSON OBJECTIVES To give the TP information on the Oxygen System to include.
Launch Procedures No-Go Criteria 1.Winds exceeding 10 knots steady from any direction 2.Cloud ceiling below 10,000 ft AGL 3.Data acquisition systems not.
Oculus Superne. 2 System Definition Review Mission Objectives Concept of Operations Aircraft Concept Selection Payload Constraint Analysis and Diagrams.
Eights-on Pylons Not to be confused with Eights around pylons Eights across a road Eights along a road.
Normal and Emergency Communication Procedures
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
Omega Tanker (K-707) Air Refueling Procedures Brief
Topics of Discussion:  Introduction  Identify & describe the protocols & processes for: Lockouts Sheltering in Place Lockdown Evacuation  Active Shooter.
Airports And ATC Written for the Notre Dame Pilot Initiative
Signals,Road Markings, Intersections, Sharing the Road
DISPENSING FUEL HSE CONSIDERATIONS 1. FUEL TANKERS Road tankers or bowsers which refuel vehicles, plant, and equipment shall be subject to scheduled inspection.
B757 Review Questions.
4136 S. Mc Cann Springfield, Mo
SWA MEMORY ITEMS.
Headquarters Air Mobility Command Enabling the “Global” in “Global Vigilance, Reach and Power!” Allied Tactical Publication-56(B) Difference Training.
Cirrus Transition Course
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
October 2006 NASA Dryden Status Aerospace Control & Guidance Sub-committee Williamsburg, VA October 2006 John Bosworth (661)
Results of NASA/DARPA Automatic Probe and Drogue Refueling Flight Test Keith Schweikhard NASA Dryden Flight Research Center
Leading Cadet Training
Engine drills & Limitations.
Signals,Road Markings, Intersections, Sharing the Road.
TW-4 Deliberate ORM Analysis COLLEGE STATION – EASTERWOOD FIELD (KCLL) NIGHT OPERATIONS TEAM VISIT 14 FEB 08.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
Transportation Emergencies
US IL Flying Club June 1 st, VERSION 4.
Advanced Multi-Engine Formation VT-31 UPDATED MARCH 2012.
February 2007 NASA Dryden Status Aerospace Control & Guidance Sub-committee Boulder, CO February 2007 John Bosworth (661)
Diesel Fuel - Fill Place all spill safety equipment where needed
CHAPTER 10 TRAFFIC SIGNALS AND PAVEMENT MARKINGS.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ATC COURSE RULES Organization Class “C” Airspace
HOT-LOADING SAFETY TRAINING FOR THE NEPTUNE BAE 146.
86th Flying Training Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e #1 Flying Training Squadron in the World T-1 Formation and Mission.
Flight Mission IUT NFORM-02 Introduce Basic Night Formation Flying.
T-6B On-Board Oxygen Generation System (OBOGS)
Air Line Pilots Association, International EMB 145 Oral Questions Emergency/Abnormal Procedures Select “Slide Show” Use the space bar on your computer.
Jacking The aviation technician must be familiar with the jacking of aircraft in order to perform maintenance and inspection. Jacking procedure is vary.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
86th Flying Training Squadron
14 Refrigerant Recovery, Recycling, and Recharging.
Advanced Multi-Engine Formation
FP-2 T-44 Ops Limits 5/6/15.
UNIT -4 AERODROME DATA.
SAFE WORK INSTRUCTIONS
T-6B On-Board Oxygen Generation System (OBOGS)
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Omega KDC-10 Air-to-Air Refueling Procedures

KDC-10 Tanker Former Japan Airlines DC modified for air-to-air refueling (AAR) Flight Refueling Limited (FRL) 909E pod mounted under each wing Looks like USAF KC-10 - No centerline hose or boom Complies with NATOPS / USAF / NATO (ATP-56B) AAR procedures

Tanker Characteristics Hose and drogue configuration Flight Refueling Limited AAR system 75’ long black hose 4 (1 ft) white markings 2 (5 ft) White markings 20 ft refueling range

5’ White marks Refueling range 5’ White marks Refueling range 75’ Hose, 1’ White marks Every 10’ Outer limit Inner limit KDC-10

Tanker Exterior Lighting Position Lighting –Red-lower beacon –Green- lower fueling beacon –White- nacelle (dimmable), fuselage (dimmable), logo (not dimmable) Navigation Lighting –Standard aircraft green / red / white per 14 CFR

AAR Pod Lighting Status Light (Dimmable) –Red - Dead hose / tanker not ready - Flashing red means “emergency disconnect” –Amber - Solid amber means “tanker is ready” - Flashing amber means “approaching inner limit of the refueling range” –Green - Transfer pumps energized and fuel is flowing Pod “covert lighting” for NVD operations (not normally available)

KDC-10 Status Lights

Tanker Responsibilites Tanker arrives 5-15 min prior to ARCT or “on station” time Tanker provides WX avoidance Tanker maintains ATC or CV comms (Strike / control freq + boom freq)

Rendezvous Procedures Standard ATP-56B / Navy refueling anchor – KIAS –Left-hand turns unless otherwise required –ATP-56B comm / terminology Check-in / Join up Procedure (AAR freq) –Call sign / offload request –Cleared to Port Observation –Maintain 1000’ altitude (below) 1 NM lateral separation until visual with tanker aircraft –Cleared to climb / join with visual and positive comm

AAR Procedures From observation position (port or starboard), tanker will clear receiver, “Astern to the left or right hose” Hose in trail, steady amber light - tanker READY. From the pre-contact position, when stable and cleared “CONTACT,” receiver initiates contact –1-3 kts closure at contact recommended Once in contact, move hose in ft to initiate fuel transfer Green light onGreen light on / amber light off means tanker refueling transfer pumps operating

Proper AAR position is aft and slightly left of the pod centerline, below the chord of the wing, at the natural trail point of the basket – Hose length centered between the two 5’ white marks (50-70 feet of hose extended) gal/min flow rate: depends on receiver’s fuel state (usually lower fuel state= higher flow rate) and fuel tank cross-feed setup All AAR operations monitored / recorded by video cameras (pod and fuselage mounted) F/E calls: “forward 10”; “back 10”; “up 5” etc. AAR Procedures

MA-4 coupler on the drogue assembly physically ensures AAR pressure at 50 PSI max –Actual refueling pressure is not gauged, depends on aircraft configuration/ambient pressure, etc. –Prowler flow rate gal/min at nominal 50 PSI Nominal AAR envelope –5,000 to 33,000 MSL –200 to 300 KIAS –Must trail / retract hoses below 290 KIAS AAR Procedures

Proper F/A-18 Series Day Sight Picture

Post AAR Procedures After pre-briefed offload, when cleared by the tanker, receiver initiates disconnect “Reform RIGHT, or reform LEFT” as directed to await wingmen When AAR is complete, cleared to depart normally high and to the right (or as directed) Tanker will report offload prior to receivers departing

Abnormal Procedures Approaching inner limit of the refueling range (no 5 ft white markings showing) amber status light will flash, then extinguish. Green light also extinguishes. Slide aft to resume refueling As you approach the outer limit of the refueling range (both 5 ft white markings showing) green light will extinguish and fuel flow will stop. Move forward to resume fueling Emergency disconnect (BREAKAWAY!) –Called by anyone due to an unsafe condition –RED status tanker light will flash Tanker system failure - both baskets stowed –Tanker will RTB / notify controlling agency

Abnormal Procedures Dead hose - steady RED light –AAR will not be attempted on dead hose –Basket stowed for the remainder of flight –AAR may continue with a serviceable drogue on the opposite wing Emergency disconnect (BREAKAWAY!) –Called by anyone due to an unsafe condition –RED status tanker light will flash Downed aircraft - tanker will mark position and maintain orbit until SAR arrives –UHF / VHF and HF equipped. Can initiate long-range SAR via HF if necessary

More Information Available on the Omega Air Refueling website –Pictures –Videos of AAR operations –Mission planning information – and telephone contact information

Urgent Schedule or Other Operational Changes Notify Omega Ops Phone: Ryan Murphy Robert Proano