Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Assessment of differences in market designs in the CS region Milan 18 July 2008.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
F orward C ontracts A uctions business line – electrical power.
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
IFE-CASC.EU project Forum with market parties Paris – 18th June
Milan – 16 th November 2010 Cross Border capacity allocation in 2011: CASC Project.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Towards Regional Independent Operators – a main driver for successful market integration.
EFET comments on obstacles to trading November 2007 Obstacles to Electricity Trading in Central & Eastern Europe – latest development.
CASC.EU SA and its role in Explicit auctions 16/11/2010 CASC.EU SA 1.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
E-Trace the Auction Portal Warsaw, 12 January 2005 co-ordinated.
Capacity Trades. Rules and Regulations Exchange rules must comply with a Contract on Accession to Wholesale Power Market’s Trading System Exchange commodity:
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
Transfer & Trades Special Transmission Workstream
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
SEM – One Year On Liam Ryan, Market Operations Manager.
Long term allocation 2011 Italian borders Central-South and Central-West Regions 2nd Joint RCC meeting Milan, September 28 th, 2010.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
RMC Regional Market Coordination RMC Regional Market Coordination RMC Regional Market Coordination CWE Capacity Allocation Service Company CASC Presentation.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
1 Nodal Stabilization Market Call December 03, :30 PM.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
IG Meeting Flow-based Coordinated Auction Allocation Scheme for the CEE – Region Report WG – CA Christian Todem 18 th IG Meeting, Vienna April 30 th 2008.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
Agenda Pag. 1 I.4M MC – Common parts II.Further Information on Romanian Market 1.Regulation for DAM organization and functioning with respect to price.
Overview of the Contract Carriage Gas Markets in Eastern Australia James Mellsop Director 4 December 2012 Presentation to PEA.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Treasury management Financial management of projects.
EMR Delivery Body Contract for Difference – December 2016.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
26th IG meeting 23th January 2014
Allocation of Capacity in Portugal Under the New Regulation
Pseudo-tie business procedure
GTAC Workshop Block 5 19 September 2018.
Back-up flexibility for this winter Slow R3 non-reserved power
PRISMA General Information
Pseudo-tie business procedure
RR Platform – Implementation Framework
Presentation transcript:

Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna

 Participation in Allocation Process  Collaterals  Products  Secondary Market  Allocation Algorithm  Emergency procedures  Settlement  Transparency  Additional Features Content

 Registration signed registration form extract from commercial register contact details Confirmation of the registration by CAO constitute the contract between CAO and registered entity. Entity is identified by unique EIC code (usage of more EIC codes is not allowed)  Access to CAO IT user registration qualified electronic certificates for encrypting and signature of data  Collaterals Participation in Allocation

 Rating ? “BBB-” (S&P) or “Baa3” (Moody’s) or “BBB-” (Fitch/IBCA) or higher – represents EUR of Credit Limit  Bank guarantee any bank with the required rating requirements specified by AR  Deposit on the account of CAO on the escrow account of Allocation Participant Collaterals (I/II)

 Credit Limit sum of all collaterals valid for an individual allocation process credit limit is utilized by not paid invoices and bids submitted into the system unutilized credit limit defines if the bids will be accepted for evaluation or not: o in case of daily auction bids – maximum value is checked on the input to the system o in case of yearly/monthly auction bids – preliminary evaluation is used to identify allocation participants whose bids will be excluded due to insufficient collaterals Collaterals (II/II)

 Technical parameters calculation done on the base load basis  Standard products yearly monthly daily  Block products to be defined by CAO staff flexible  Bids can be satisfied also only partially – divisible bids.  Result of the allocation is right to use the capacity (PTR) identified by source CA, sink CA Products

 Supported activities Transfer Resell valid for yearly & monthly PTRs on self-service basis via CAO IT  Transfer possible for paid PTRs by D-2, auto-rejection if not confirmed by transferee slicing is possible as regards time (hourly basis) and volume (MW) all rights and obligations (with exception of payment for the allocation of PTR) are transferred Secondary market (I/II)

 Resell possible for paid PTRs into monthly allocation (base load), slicing is possible as regards volume (MW) into daily allocation, slicing is possible as regards time (hourly basis) and volume (MW) compensation for holder of PTR is equal to the allocation price determined in the relevant monthly/daily allocation process, however the compensation may not exceed the original payment for reservation of PTR Secondary market (II/II)

 Social welfare maximization principal applied  see presentation of Mr. Todem Allocation Algorithm

 In case of emergency situation or to avoid the emergency situation TSOs may apply curtailment of PTRs via CAO  Following criteria has to be considered in such case: What is the duration of the emergency situation (e.g. How long it will take to replace the damaged network element)? When the information is available to TSOs? Trade off between accuracy of the curtailment and time of notification to the market. Emergency procedures (I/III)

 Curtailment of Allocated PTRs applicable in cases when TSOs identify necessity of curtailment longer time in advance or curtailment will be applicable for several days usage of all allocated PTRs is taken into account the highest price bids from yearly and monthly allocation up to the level of allocated PTRs are evaluated with use of the allocation algorithm taking into account actual/updated grid conditions CAO inform allocation participants about curtailment Emergency procedures (II/III)

 Curtailment of Nominated PTRs applicable in cases when TSOs identify necessity of curtailment shortly before the daily allocation or just during the calculation of daily Available Maximum Flows – i.e. after the nomination gate closure nominations submitted by market participants to TSOs are taken into account (including netting) the highest price bids from yearly and monthly allocation up to the level of nominated PTRs are evaluated with use of the allocation algorithm taking into account actual/updated grid conditions CAO inform allocation participants about curtailment TSO confirm curtailed transmission schedules to market participants Emergency procedures (III/III)

 Reservation of PTRs yearly – 12 equal installments (in advance) monthly – 1 invoice (in advance) daily – all daily allocations within calendar month (1 invoice ex-post)  Resell invoice issued by allocation participant all resells within calendar month (1 invoice ex-post)  Curtailment invoice issued by allocation participant Settlement

 Technical data Available Maximum Flows Export/Import limits PTDF matrix  Market data specification of the deadlines and product Requested PTRs Allocated PTRs Number of participants List of bids without identification of the bidder (bidding curve) Transparency

 Notice Board communication platform supporting the secondary market  Balancing Services delivery of cross-border balancing services is allowed on several borders in CEE region to allocate transparently capacity for this purpose (and set the price for such capacity), PTRs allocated within the standard allocation process may be notified to be used for balancing services provision Additional Features