April 2006. 2 PART I : Status of nuclear industry in Korea PART II : Romania-Korea Cooperation status PART III : Cooperation with Korea PART I : Status.

Slides:



Advertisements
Similar presentations
Nuclear Power: Opportunities, Challenges and Solutions Black Sea Energy Conference - April 2006 Ron Cullen General Manager and Project Director Romania.
Advertisements

New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Korean Nuclear Power Program Configuration Management Benchmarking Group (CMBG) 2014 Kent R. Freeland, P. E. PowerKnowledge Energy Systems ENERGY SYSTEMS.
CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6.
Japan’s Experience in Preparing National Communications - Financial Resources and Technology Transfer- Satoshi Ogawa Climate Change Division Ministry of.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
Romanian Energy Program, Phase III (REP3) Black Sea Energy Conference April 3-5, 2006 Bucharest, Romania Regulatory Workshop Linda Key Breathitt Senior.
DEVELOPMENT OF A REGIONAL ENERGY MARKET IN THE MEKONG AREA by Piyasvasti Amranand National Energy Policy Office, Thailand ENERGY WEEK April 1999,
SOCIETATEA NATIONALA “NUCLEARELECTRICA” SA FINANCING EXPERIENCE FOR FINALISATION OF NEW NUCLEAR UNITS IN ROMANIA Dr. IOAN ROTARU Technical Meeting on Milestones.
Nuclear Training & Education Center
TACSS Workshop Korea’s Experience on Nuclear Technology Transfer, Its Indigenous Development and Future Planning 19 September 2006 Poong Eil Juhn, Ph.D.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
International Relations (13) Korean Nuclear Power/Weapons 김 병 구
June 8, CMBG Conference. 2 Part  What is KHNP? KHNP : Korea Hydro & Nuclear Power Company - Korea’s largest power generator, sole utility.
Ashley Finan, 2006 Page 1 Nuclear Energy and Oil Sands? Ashley Finan Massachusetts Institute of Technology Department of Nuclear Science & Engineering.
Nuclear Energy in Korea
© OECD/IEA 2010 Cecilia Tam International Energy Agency Martin Taylor Nuclear Energy Agency The Role of Nuclear Energy in a Sustainable Energy Future Paris,
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Kudu Gas to Power Project – Contributing to regional supply
THE NUCLEAR POWER IN ROMANIA F. Glodeanu, G. Andrei New Cooperation Strategies in the Geopolitical and Economic European Space – UE 27 Thessaloniki, June.
Standard way of sharing product data for nuclear power plants in Korea April 11th, 2005 Soonhung Han Plant Engineering Life Cycle Conference.
China NPP Development and Financing Li Kang Department of Nuclear Power CNNC.
Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.
Tom MAZOUR IAEA, Division of Nuclear Power
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
Nuclear Power Development History and Self-Reliance Practice in China August, 2013 Rio, Brazil.
Development of Cyber ALARA Program 2012 ISOE Asian ALARA Symposium Choi, Hoon Radiation Health Research Institute Korea Hydro-Nuclear Power Company.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
WELCOME MEETING China Guangdong Nuclear Power Holding Co., Ltd. (CGNPC) and CLP Group Tuesday, 5 August 2008 Thailand Institute of Nuclear Technology (TINT)
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
Gunnar Tryggvason Acting CEO. HKI objectives Background & owners HKI Targets
Nuclear Issues in South Korea Introductory Brief of Spent Fuel Management Reform & Nuclear Power Debates in South Korea Kwanghoon Seok, Green Korea United.
Paul J. Evanson President Florida Power & Light Company Gabelli Asset Management Company 18 th Annual Conference May 17, 2003.
Energy for the Future Belene Nuclear Power Plant Project Status.
This Week in Brief 한.EU FTA 비준 국회 통과, 발효 – 세계 최대 단일 경제권, 중국 다음 교역국 – 3 년이내 공산품 / 농산품 관세 철폐 한불간 경제협력 확대 최고 경영자 회의, 파리 – 고속철, 우주항공, 신재생 에너지 등 ‘
Mutual Development of Korea and Kazakhstan Based on Public-Private Partnerships and Promotion of Development Projects Lee Youn-ho Ambassador for International.
1 RIC 2009 Current Research Issues in PSA: Korean Status Joon-Eon YANG Integrated Safety Assessment Division Korea Atomic Energy Research Institute 10.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Current Status and Challenging Issues of Nuclear Energy in Korea Park, Yong Taek President & CEO Korea Power Engineering Company, Inc. 18th World Energy.
 Copyright Atomic Energy of Canada Limited IAEA, Vienna, Austria, 9-12 Feb, 2010 AECL Perspectives on newcomer NPP owners: lessons from the Cernavoda.
ENERGY FOR THE 21 ST CENTURY the Potential for Nuclear Power Luis Echávarri Director-General, OECD Nuclear Energy Agency IAEA Scientific Forum at the General.
International Relations (9) Nuclear Power in ROK 김 병 구
ROMANIAN EXPERIENCE IN TRAINING AND QUALIFICATION OF THE NPP OWNER/OPERATOR FOR UNIT 1 OF CERNAVODA NPP Dr. Ioan Rotaru TM/WS on Topical Issues on Infrastructure.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
In the Framework of: Financed by: Developed by: DANUBE WATER PROGRAM Professional Technical Assistance Services for Business Planning and Commercial Efficiency.
Korea & the World (9) Nuclear Power in ROK 김 병 구
Korea & the World (9) Nuclear Power in ROK 김 병 구
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
Oil Sands & Nuclear Energy: Our Integrated Energy Vision Presentation for: Energy Roundtable, Calgary Presentation by Wayne Henuset, Director September.
Report on Spent Fuel Research and Analysis in the Republic of Korea Jungmin KANG CISAC, Stanford University EASSC 2006 Meeting Beijing, China, November.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA Dumitru Dina Head of Nuclear Safety Department 1WASHINGTON DC, USTDA , September.
BCĐT-ĐHN-NT1 Institute of energy NUCLEAR POWER DEVELOPMENT PLAN IN VIETNAM OVERVIEW, PROSPECTS AND CONCERNS 12/2009.
Global Energy Problems and Counter Policies and Measures of Korea
Project Manager of Project Department
MHI Products © 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.
New Actions after the Hokuriku Declaration
Maximum and Minimum Nuclear Power Paths for the Republic of Korea
The Nuclear Power Sector in the Republic of Korea: Nuclear Materials Management/ Fuel Cycle Practices, Plans and Policies Jungmin KANG CISAC, Stanford.
Coal – security of coal supply considerations of EURACOAL
CCTV System for Radiation Work Management
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
THE INTRODUCTION OF NUCLEAR POWER IN EGYPT AN OVERVIEW
Presentation transcript:

April 2006

2 PART I : Status of nuclear industry in Korea PART II : Romania-Korea Cooperation status PART III : Cooperation with Korea PART I : Status of nuclear industry in Korea PART II : Romania-Korea Cooperation status PART III : Cooperation with Korea

PART I STATUS OF NUCLEAR INDUSTRY IN KOREA

4 Status of Electric Power 28.5% (17,716) 28.9% (17,965) 26.6% (16,552) 7.4% (4,605) 6.2% (3,885) 40.3% (146,779) 36.6% (133,657) 16.0% (58,250) 4.8% (17,883) 1.4% (5,153) *The others : 1,537 MW(2.5%)*The others : 3,349 GWh(0.9%) (As of the end of 2005) Nuclear Coal Gas Oil Hydro Total : 62,260MWTotal : 364,571GWh

5 Installed Capacity NuclearCoalOilGasHydro 367MW Capacity X 1,000 MW 62,260 MW 28.5% 28.9% 7.4% 26.6% 6.2% 21,111MW 9,835MW ,628MW ,858 MW 27.0% 30.5% 9.6% 25.3% 7.6%

6 HydroOilGasCoalNuclear Long-term Power Development Plan X 1,000 MW 90 Capacity ,260MW (26.6%) 78,630MW (26.1%) 86,340MW (26.8%) 88,040MW (26.3%) 17,716 (28.5%) 18,716 (23.8%) 26,640 (30.9%) 26,640 (30.3%) (28.9%) (30.9%) (25.7%)(25.3%) (7.4%) (6.2%) (2.7%) (3.8%) (6.2%) (8.0%) (7.3%) (7.1%)

7 Status of Nuclear Power Plants Seoul Ulchin #1 ∼ 6 Kori #1 ∼ 4 ► Shin Kori #1~2 Wolsong #1 ∼ 4 ► Shin Wolsong #1,2  Yonggwang #1 ∼ 6 Site In Operation Under Const. Total Kori4 (3,137)2 (2,000)6 (5,137) Wolsong4 (2,779)2 (2,000)6 (4,779) Yonggwang6 (5,900)- Ulchin6 (5,900)- Total 20 (17,716) 4 (4,000) 24 (21,716) (Unit: MW) (As of the end of 2005)

8 In Operation NSSS: Nuclear Steam Supply System, A/E: Architectural Engineering  20 units (17,716 MW) Plant Reactor Type Capacity (MW) NSSS Supplier Plant A/E Commercial Operation PWR W/H Gilbert Bechtel/KOPEC Apr. ’78 July ’83 Sep. ’85 Apr. ’86 #1 #2 #3 #4 Kori Korea has accumulated experience in various type of reactors PHWR AECL AECL/DOOSAN AECL AECL/KOPEC Apr. ’83 Jun ’97 Jun. ’98 Sep. ’99 #1 #2 #3 #4 Wolsong PWR 950 1,000 W/H DOOSAN Bechtel/KOPEC KOPEC Aug. ’86 Jun ’87 Mar. ’95 Jan. ’96 May. ’02 Dec. ’02 #1 #2 #3 #4 #5 #6 Yonggwang PWR 950 1,000 Framatome DOOSAN Framatome KOPEC KPPEC Sep. ’88 Sep ’89 Aug. ’98 Dec. ’99 July. ’04 Apr. ’05 #1 #2 #3 #4 #5 #6 Ulchin

9 Under Construction/Planning  8 units 9,600 MW * OPR : Optimized Power Reactor, APR : Advanced Power Reactor Today, Korean companies are taking the leading role in NPP Projects Construction Plant TypeCapacity (MW)Reactor TypeProject PWR 1000 OPR1000 Dec Dec #1 #2 Shin-Kori RemarkCommercial Operation Construction PWR 1000 OPR1000 Oct Oct #1 #2 Shin-Wolsong Planning PWR 1400 APR1400 Dec Dec #1 #2 Shin-Ulchin Planning PWR 1400 APR1400 Sep Sep #3 #4

10 Nuclear Power Development Plan Ulchin 3& / Yonggwang 3& / 1996 Yonggwang 5&6 Ulchin 5&6 Shin-Kori 3&4 Shin-Kori 1& / / 2014 Shin-Ulchin 1& / 2015 APR 1400 Nth APR 1400 Development Shin-Wolsong 1& / 2012 OPR 1000 (Operation) OPR 1000 (Construction) APR /2005  2010  2005  2000  1995  1990 

11 Site View of Kori

12 Site View of Wolsong

13 Site View of Yonggwang

14 Site View of Ulchin

15 Site View of Shin-Kori RCB Unit 2 Unit 1

16 Site View of Shin-Wolsong

17 Operational Performance Unplanned shut down / Unit Capacity Factor (Korea) Unplanned shut down / Unit Capacity Factor(%) Capacity Factor (World Average) shutdown C.F.(%) `92`93`94`95`96`97`98`99`00`01`02`03 `04 `05

18 Outstanding Performance in 2005 KHNP’s 5 units take all the top five spots on the list of 50 best capacity factors World Generation Ranking : -No. 1 : Kori #4 (104.85%) -No. 2 : Younggwang #3 (104.14%) -No. 3 : Ulchin #1, YGN #1 (103.80%) (* two units in third ) -No. 5 : Wolsong #3 (102.29%) World Generation in 2005 (Nucleonics Week, ’06.2.9)

AECL / Doosan 〃 〃 NEI- Parsons Doosan / GE 〃 〃 Apr ’83 Jun ’97 Jun ’98 Sep ’99 Turnkey Non- Turnkey 〃 〃 May ’77 Oct ’91 Aug ’ Unit Capacity (MWe) Manufacturer ReactorT/G Contract Type Construction Period Outlines of Wolsong CANDU NPPs ExcavationCODMonths

20 Period Performance of Wolsong CANDU NPPs UnitWorld Rank (*)Capacity Factor (%) ( *) : The number of NPPs in the world #1 #3 #4 Apr 1, ’85 ~ Mar 31, ’86 Apr 1, ’89 ~ Mar 31, ’90 Jul 1, ’91 ~ Jun 30, ’92 Oct 1, ’91 ~ Sep 30, ’92 Jan 1, ’93 ~ Dec 31, ’93 Jan 1, ’97 ~ Dec 31, ’97 Jul 1, ’98 ~ Jun 30, ’99 Oct 1, ’99 ~ Sep 30, ’ (277) 2(341) 2(356) 1(360) 1(421) 2(427) 1(376) 1(417)

21 ROMANIA-KOREA COOPERATION STATUS PART II

22 History for Cooperation MOU was signed between MOIR-Romania and KHNP for cooperation in Nuclear Power Projects MOU was signed between MOIR-Romania and MOCIE-Korea for cooperation in Cernavoda nuclear projects Technical Cooperation Agreement was signed between SNN and KHNP ~ Romanian key persons visited Korea to discuss to enhance mutual cooperation in Cernavoda Projects, including Minister of Foreign Affairs, President of Senate, etc RAAN supplied 16 tons of heavy water to KHNP

23 History for Cooperation (Con’d) MOU was signed at 1st Romania-Korea Industrial Cooperation Committee(ICC) in Bucharest RAAN supplied 16 tons of heavy water to KHNP Romanian high level and working level delegations visited Korean nuclear industry, including State Secretary of MOEC Romanian President, Mr. Traian Basescu visited Korea (10.18~ 10.19) and talked with KHNP CEO, Mr. Lee Joong-Jae Nuclear Cooperation Agreement was signed by both gov’ts nd Korea-Romania ICC was held in Seoul

24

25 Technical Assistance Agreement (TAA) for Units 1, 2 was signed between SNN & KHNP in March ’02 Technical Assistance for Units 1,2 Owner consulting services for schedule control for Unit 2 -2 KHNP experts were dispatched to Cernavoda in May ’02 -Contributed to significant reduction of construction schedule PSA Services for Part 1 (Fuelling related Systems) for Unit 2 -Contract award to KHNP in November ’05 To expand technical cooperation areas -Greatly contribute to enhance economy and safety of Unit 1 operation and Unit 2 construction -PSR, design modifications, training, commissioning, etc.

26 Joint Study Team -SNN (Leader), KHNP, AECL & Ansaldo -Financial Advisor (Phase 2 only) Phase 1 Study from March to September ’03 -Technical, economic advantages of the Project were proven -Results were approved by Inter-Ministerial Committee in December ’03 Phase 2 Study in progress from October ’03 -To establish appropriate financing model and to draw project ownership -7 potential investors in equity of Project Company, including KHNP, were selected (November ’04) Joint Development of Units 3,4 Project Phases 1 and 2 Joint Feasibility Study

27 As a major shareholder of PCO and the major participants in EPC/O&M, provided that the appropriate securities are established - Reliable long term PPA - Licensing, Public Acceptance and Political Risk - Nuclear Liability and Radwaste Disposal - Protection of Investors against bad financial situation of PCO, etc. Joint Development of Units 3,4 Project (Con’d) KHNP's Indication of Interest under JVPC ※ Model (March '06) ※ JVPC : Joint Venture Project Company

28 Joint Development of Units 3,4 Project (Con’d) Cooperation with Korea in Units 3,4 Project Korea’s involvement in Unit 3,4 will certainly contribute to constructing the most successful plant with the highest economy and safety in the world

29 Joint Development of Units 3,4 Project (Con’d) Cooperation with Korea in Units 3,4 Project (Cont’d) Korea is the best partner to Romania for Cernavoda Project -Benefiting from its world-top class technologies and experience gained through continuous implementation of 20 NPP projects, including 4 CANDU units, for more than 30 years -Korean nuclear industry with systematically established infrastructure is willing to share its technologies with Romania in every field of nuclear power project implementation

30 COOPERATION WITH KOREA PART III

31 Increased Necessity of Nuclear Power Rapid increase of energy price Environmental regulation (Kyoto Protocol) Instability of energy supplies Securing of stable energy source in the medium and long terms Introduction of NPPs considering each country’s own energy circumstances Circumstances of Energy in the WorldGlobal Renaissance of Nuclear Power

32 Strength of Korean Nuclear Industry  Continuous and intensive implementation of NPP Projects since introduction of first NPP in the 1970’s Steady and definite policy in Nuclear Power Projects  Systematically established nuclear power infrastructure  Steady and definite policy in nuclear power project

33 Cooperation with KHNP NPP Technology Self-reliance & Localization Training Program F/S for OPR1000 Technical Assistance Sharing Korean Experience & Resources Joint Venture T/T & T/A Near-term Cooperation Long-term Cooperation

34 Benefits of Cooperation with Korea Latest and Proven Technology Favorable Financing Korean Experience of Localization

35