Risk Engineering The proposed OSHA crane standard Zurich Services Corporation.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Working Around/Under Loads
Tower Crane Safety Regulations
Presenter Name Presenter Title Event Name
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Crane Safety Vincent J. Giblin, General President.
Subpart R Steel Erection
Rigging, Signals, Power Line Safety & Assembly / Disassembly in Construction Safety Standard WAC This presentation is intended to “summarize” the.
Powered Platform Safety. © Business & Legal Reports, Inc Session Objectives You will be able to: Identify powered platform components Recognize.
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide To the OSHA
Washington State’s New Construction Crane Rule
Presented by: John Cole General Manager, CICB – Definitions – Crane Inspections – Wire Rope Selection and Inspection Criteria.
OSHA 29 CFR Part 1926 Cranes & Derricks In Construction
Morrow Equipment C O M P A N Y, L. L. C. Peter Juhren Corporate Service Manager Morrow Equipment Co. L.L.C. Salem, OR USA Peter Juhren Corporate Service.
Contractor Safety Management
Crane Operations Objective
Washington State’s New Construction Crane Rule (Phase 1)
Crane Safety, Subpart N
Cranes, Hoists and Truck Hoists
Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
WAC Part L Construction Cranes, Rigging, and Personnel Lifting
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
Hydraulic Crane Safety. Hydraulic Cranes Can be stationary or attached to trucks, trains and boats Can be stationary or attached to trucks, trains and.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
Excavating and Lifting Part 3
Subpart CC Qualified person means a person who, by possession of a recognized degree, certificate, or professional standing, or who by extensive.
LOCKOUT/TAGOUT.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction.
Module 4: Overhead and Underground Power Lines. Overview of Module 4 Background on power lines Hazards of overhead and underground power lines Injury.
Controlling Hazardous Energy
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Safety and Health Programs
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Electrical Safety.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
1a.  Exposed part  Live or energized part  De-energized part 1a.
OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)
Risk Engineering Be prepared for OSHA! Patric E. McCon, CSP, CFPS, CHMM Sr. Risk Engineering Consultant Zurich Services Corporation.
Jonathan McCoy Regional Property Underwriting Manager Zurich Energy Supply chain insurance and risk assessment Protecting profitability.
Florida Marine Contractors Association
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
Log dumps, Ponds and Yards Section L of the Forest Activities Code.
Crane & Derricks In Construction
Electrical Work Practices City of Council Bluffs Presented by: SilverStone Group © 2012 Zywave, Inc. All rights reserved.
Cranes and Derricks Safety
Cranes, Derricks, Hoists, Elevators, and Conveyors - Subpart N Section 6 Robert Poole St. Paul Fire & Marine Insurance Company.
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Presented by: ETTA, OSH Division,
The Control of Hazardous Energy (Lockout-Tagout)
Control of Hazardous Energy Lockout/Tagout 29 CFR
Lifting & Rigging Continuing Education Fourth Quarter 2016
SAFE WORK INSTRUCTIONS
Subpart O Motor Vehicles EO 11.1 Describe requirements in Subpart O that protect workers from common motor vehicle hazards 1.
Overhead and mobile crane safety
The Control of Hazardous Energy (Lockout-Tagout)
LINE CLEARANCE TREE TRIMMING OPERATIONS Quad State Instructors, Inc.
Personal Protective Equipment
The three-point system
Electrical Safety.
Control of Hazardous Energy
Line Clearance Tree Trimming Operations
Presenter Name Presenter Title Event Name
10-hr. Construction – Cranes
Presentation transcript:

Risk Engineering The proposed OSHA crane standard Zurich Services Corporation

Risk Engineering What and when Based on the final publication of the Crane and Derrick Advisory Committee (CDAC), published in 2004 OSHA finally published the Proposed Rule October 8, The public comment period expires today – January 22, 2009

Risk Engineering Why is a new standard needed? OSHA and are 39 years old There have been no revisions since original publication There were some oversights in the original There have been many technological advances for crane equipment in the last for decades The new standard gets away from SHOULD and includes more SHALL statements Focusing on competent persons and giving more defined descriptions of personnel’s responsibilities Taking multiple ANSI/ASME standards and creating their own (some are more stringent)

Risk Engineering Comparison of standards OSHA – 17 pages OSHA – 15 pages ASME B30.5 – 46 pages New Subpart N – 1,110 pages Photo credits: 1) US Army (public domain), 3 by Bill Davis, 1 from Craneaccidents.com with permission

Risk Engineering Comparison of standards Operator qualifications – nothing – nothing – 8 pages Photo credit: Bill Davis

Risk Engineering Comparison of standards Tower cranes – nothing – ¼ page – 7 pages Photo credit: Bill Davis

Risk Engineering Comparison of standards Floating cranes – nothing – 1 page – 9 pages Photo credit: Bill Davis

Risk Engineering Comparison of standards Overhead and gantry cranes – nothing – ½ page – 1 page Photo credit: Bill Davis

Risk Engineering Comparison of standards Signaling – nothing – nothing – 3 pages Use of standard signals is mandatory Signalers must be qualified Photo credit: Bill Davis

Risk Engineering Comparison of standards Wire rope – nothing – nothing – 3 pages Photo credit: Bill Davis

Risk Engineering Comparison of standards Ground conditions – nothing – nothing – 1 page Photo credit: Bill Davis

Risk Engineering Comparison of standards Assembly and disassembly – nothing – nothing – 6 pages Photo credit: Bill Davis

Risk Engineering Comparison of standards Power lines – nothing – ¼ page – 11 pages Photo credit: Bill Davis

Risk Engineering Comparison of standards Inspections – 4 pages – nothing – 11 pages Photo credit: Bill Davis

Risk Engineering Comparison of standards Personnel platforms – nothing – 8 pages – 12 pages Photo credits: Bill Davis

Risk Engineering What’s new? Inspection criteria Fall protection Signal person qualification Power line safety (really big) Ground conditions Authority to stop operations Operational aids The really big one – Operator qualifications Photo credit: Bill Davis

Risk Engineering What’s included? Hoisting personnel Tower cranes Derricks Wire rope Multiple crane lifts Overhead and gantry cranes Design, construction and testing Photo credits: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Crane on rails Photo credit: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Crane crawlers Photo credit: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Carry-deck cranes Photo credit: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Locomotive cranes Photo credit: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Rough terrain cranesCommercial truck mounted cranes Photo credits: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Cranes on bargesFloating cranes Photo credits: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Boom trucks Photo credits: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Derricks Photo credit: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Tower cranes Photo credit: Bill Davis

Risk Engineering What is a crane (what is included in the standard?) Mechanic’s trucks with hoisting devices* Pedestal cranes Side boom tractors Dedicated pile drivers Any other machine configured to hoist and lower, and horizontally move a suspended load Photo credit: Bill Davis

Risk Engineering What is not a crane (not included in the standard)? Concrete pump Photo credit: Bill Davis

Risk Engineering What is not a crane (not included in the standard)? Excavators Photo credits: Bill Davis

Risk Engineering What is not a crane (not included in the standard)? Wheel Loader Track Loader Power Shovel Dummy in a bucket Photo credit: Bill Davis

Risk Engineering What is not a crane (not included in the standard)? Fork lifts Photo credit: Bill Davis

Risk Engineering What is not a crane (not included in the standard)? Digger derricks Photo credit: Bill Davis

Risk Engineering What is not a crane (not included in the standard)? Tow trucks* Vehicle mounted work platforms Self-propelled elevating work platforms Stacker cranes Mechanic’s trucks with hoisting devices* Photo credit: Bill Davis

Risk Engineering What is not a crane (not included in the standard)? Come-a-longs and chainfalls Dedicated drilling rigs Gin poles for communication tower work Tree trimming Photo credit: Bill Davis

Risk Engineering Big definitions for people A/D supervisor Appointed person Competent person Dedicated spotter Operator Qualified evaluator Qualified person Qualified rigger Photo credit: Bill Davis

Risk Engineering Crane setup Ground conditions and supporting material Must be ensured to be adequate by the GC/CM or other controlling entity – where there is no controlling entity, requirements shall be met by the employer Good Not good Photo credit: Bill Davis

Risk Engineering Crane setup (continued) Lengthy procedures for crane assembly/disassembly Specifications on supervision knowledge and authority Crew training and instructions No person under the boom during pin removal Proper outrigger blocking is mandatory Photo credit: Bill Davis

Risk Engineering Crane setup – power lines No part of crane, line or load may be able to reach within 20 feet of a power line during setup Exceptions: De-energize and ground power lines – or - Use of a dedicated spotter – or - Proximity alarms* Assembly/disassembly below power lines is prohibited Photo credit: Bill Davis

Risk Engineering Power lines in crane operations Must identify work zone and either mark boundaries, use range limiting devices or range control warnings Must determine if any part of crane, line or load could get within 20 feet (if less than 350kV of a power line – 50 foot clearance for all lines over 350kV If yes, must either deenergize and ground Or maintain 20 foot clearance Or use table A Photo credit: Bill Davis

Risk Engineering Power line minimum clearances Table A - (almost the same as ASME B30.5) Voltage (kV)minimum clearance distance (feet) Up to to to to to to Over 1000as established by line owner

Risk Engineering Power lines in crane operations (continued) Special requirements for working below power lines Non-conductive rigging required Training of operators and crew required to include: Procedures to follow after power line contact Operator’s emergency procedures Safest means to evacuate equipment Danger of a potential energized zone Need for crew to avoid approach Safe clearance from power lines Photo credit – OSHA website (public domain)

Risk Engineering Power lines in crane operations (continued) All power lines are presumed to be energized unless confirmed to be deenergized by the utility owner/operator AND visibly grounded at the worksite All power lines presumed to be uninsulated Shall understand limitations of insulating links, proximity alarms and range control devices, if used Dedicated spotters shall be trained Diagram: D. Dickie, used with permission

Risk Engineering Inspection criteria Each shift (daily or more often) Monthly Annual comprehensive After modification After repair or adjustment Photo credit: Bill Davis

Risk Engineering Inspection criteria Documented monthly inspections Kept on file for three months Annual inspection by a qualified person Documented Detail inspection criteria Functional testing Kept on file for 12 months or next annual inspection

Risk Engineering Inspection criteria (continued) Severe service Shock load, corrosive atmosphere, etc. Inspect exposed items/conditions Document Not in regular use Idle more than three months Monthly inspection must be performed Document

Risk Engineering Wire rope inspection Shift inspection Monthly inspection Annual inspection Photo credit: Bill Davis

Risk Engineering Safety devices Mandatory equipment Crane level indicator Boom stops (except hydraulic booms) Jib stops Locks for foot pedal brakes Integral check valves for hydraulic outriggers Rail clamps and stops for equipment on rails

Risk Engineering Operational aids Required equipment – must be in service except where specified temporary alternative measures are met Boom hoist limiting device Luffing jib limiting device Anti two-block device (cranes manufactured after 2/28/92) Exceptions: Lattice booms used for dragline Clam shell Scrap magnet Drop ball Marine operations Pile driving work

Risk Engineering Operational aids (continued) Boom angle or radius indicator Jib angle indicator (luffing jibs) Boom length indicator (telescopic booms) Load weighing devices (load moment indicators, rated capacity indicators or rated capacity limiters - cranes manufactured after 3/29/03) Outrigger position indicators (cranes manufactured after 1/1/08) Hoist drum rotation indicator (if drum is not visible to operator)

Risk Engineering Fall protection Fall protection above six feet, with exceptions: While at a work station or going to and from a work station When walking point to point along a horizontal lattice boom that has been lowered to the ground and supported

Risk Engineering Fall protection (continued) Anchorages may be any part of the boom or to any substantial piece on the equipment (existing equipment only). Exception: Fall protection must be used when working over 15 feet during the assembly or disassembly.

Risk Engineering Operator certification Photo credit: Bill Davis

Risk Engineering Operator certification (continued) No physical examinations or mandatory drug testing requirements Re-certification must be completed every five years Four acceptable methods of certifying employees

Risk Engineering Operator certification (continued) Option (1) – Certification by an accredited crane operator testing organization: Accredited by a nationally recognized accrediting agency Certification is portable Valid for five years Program must be reviewed by a nationally recognized accrediting agency every three years

Risk Engineering Operator certification (continued) Option (2) – Qualification by an audited employer program: Developed or approved by an auditor certified by an accredited crane operator testing organization Auditor is not an employee of the employer Tests should be administered per nationally recognized test administration standards Program shall be audited within the first three months, then once every three years. Qualification is not portable and valid for five years.

Risk Engineering Operator certification (continued) Option (3) – Qualification by the US military: Qualification is not portable Valid for the period of time stipulated by the issuing entity

Risk Engineering Operator certification (continued) Option (4) – Licensing by a government entity: Meets or exceeds requirements of this subpart Valid only within the jurisdiction of the government entity Valid for time specified by the government entity, but no longer than five years

Risk Engineering Pennsylvania requirements Operators must get a state license by October 2010 To get a license, must have an accredited certification Applies to most construction cranes – excludes mobile cranes less than 15 tons, tower cranes less than 10 tons, digger derricks, forklifts, tow trucks, bucket trucks, longshore, manufacturing, coal mining

Risk Engineering Operator certification (continued) Certification criteria Written test – Controls and operational performance – Ability to calculate the load/capacity – Procedures for power line contact – Site preparation – Ability to read/locate manuals/charts relevant to the equipment being operated

Risk Engineering Operator certification (continued) Certification criteria (continued) Practical examination – Ability to perform pre-shift inspection – Operational and maneuvering skills – Application of load chart information – Application of safe shut-down and securing procedures Photo credit: Bill Davis

Risk Engineering Operator certification (continued) Employer must revoke operators license if they have reason to believe the employee is not qualified to operate. All programs shall have provisions for retraining employees. The current training records must be on file during the operator’s employment.

Risk Engineering Signal-person qualification Qualified evaluator must conduct the training Training requirements: Know and understand signals to be used, as well as all forms of signals (i.e., voice, hand, radio, etc.). Be competent in the application of the type of signals to be used. Have basic understanding of crane operation and limitations, including the crane dynamics involved in swinging and stopping loads and boom deflection from hoisting loads. Must be able to effectively communicate to crane operator (i.e., english-english, spanish-spanish, etc.)

Risk Engineering Power line safety Photo credit: Bill Davis

Risk Engineering Power line safety – assembly/disassembly If any part could get within 20 feet from the power line, then: Employer must confirm with the utility operator that the line has been de-energized Or else Determine the line’s voltage and the minimum approach distance permitted in specified table

Risk Engineering Power line safety – assembly/disassembly (continued) Prevent encroachment by: Conducting a planning meeting with a competent, qualified person Utilizing a dedicated spotter who is in constant contact with the operator When boom is elevated, additional measures must be in place (i.e., proximity alarm, device limiting the range of movement, elevated warning line or barricade, etc.)

Risk Engineering Power line safety – assembly/disassembly (continued) No part of the crane is allowed below a power line unless the utility operator has confirmed proper grounding. If the chart is used to determine encroachment distance, then the utility operator must provide voltage information within two working days of request. All lines must be assumed energized, unless confirmation is given from utility operator. There must be at least one electrocution hazard warning sticker conspicuously placed in the cab.

Risk Engineering Power line safety – crane operations Work zone must be identified. An insulating link or device must be installed at a point between the load and the load line to prevent the load from becoming energized Non-conductive rigging must be used if the rigging may be within the table distances. Use non-conductive tag lines, if needed.

Risk Engineering Power line safety – crane operations (continued) Non-conductive barricades to prevent unauthorized personnel from entering If power line is energized then no one other than the operator can touch the crane or rigging. Only essential personnel are permitted within the work area. Crane must be properly grounded. Procedures from the pre-lift meeting on working within safety zone of power lines must be documented and available on-site.

Risk Engineering Power line safety – crane operations within Table A Prohibited except where the employer demonstrates the following: Determines it is not feasible to do the work without breaching the minimum-approach distance After consulting with the utility operator, it is determined that de- energizing the line is not feasible

Risk Engineering Power line safety – crane operations within Table A (continued) The utility operator, or PE qualified in electrical power transmission, determines the minimum clearance distance that must be maintained. Factors include conditions affecting atmospheric conductivity, time necessary to bring the equipment to a stop, wind conditions, etc. Power lines are presumed energized, unless the utility operator confirms the line is de- energized. Photo credit: Bill Davis

Risk Engineering Power line safety - crane operations within Table A (continued) A planning meeting with the employer and utility operator/PE is held to determine the procedures that will be followed to prevent electrical contact such as: – Deactivate the device that automatically reenergizes the circuit in the event of a power line contact – Use of a dedicated spotter The utility operator or employee of the utility operator supervises and has the authority to stop work at any time to ensure safety.

Risk Engineering Ground conditions The controlling entity shall: Ensure that ground preparations necessary to meet the requirements of a good, level, drained site is adequate to support the equipment in use. Locate all hazards that are identified in documents available. Photo credit: Bill Davis

Risk Engineering Authority to stop operations Whenever there is a concern as to safety, the operator shall have the authority to stop and refuse to handle loads until a qualified person has determined that safety has been assured. Photo credit: Bill Davis

Risk Engineering Operational aids Operations shall not begin unless the operational aids are in proper working order, except where the employer meets the specified temporary alternative measures: Category I Category II

Risk Engineering Operational aids – Category I Boom hoist limiting device Luffing jib limiting device Anti two-blocking device If a deficiency occurs, the employer must be able to demonstrate that the replacement parts have been ordered within seven days of notification. Repairs shall take place within seven days of receipt of the parts. Photo credit: Bill Davis

Risk Engineering Operational aids – Category II Boom angle or radius indicator Jib angle indicator Boom length indicator Load-weighing device, load- moment indicator, rated capacity indicator or rated capacity limiter Outrigger position monitor/sensor (new) Drum rotation indicator (new) Photo credit: Bill Davis

Risk Engineering Operational aids – Category II (continued) If a deficiency occurs, the employer must ensure the part is repaired within 30 days. Exception: If the employer has documented the replacement parts were ordered within seven days of occurrence, the repair shall be completed within seven days of receipt of the parts.

Risk Engineering Wire rope Competent person to conduct visual inspections before each shift, monthly and annually Categorize deficiencies in: Category I Category II Category III Photo credit: Bill Davis

Risk Engineering Wire rope (continued) Shift inspection – before each shift Monthly inspection – all wire ropes, including running ropes (documented) Annual inspection – At least every 12 months, unless not feasible due to set-up. More detailed, including wire rope that is normally hidden during daily/monthly inspections, etc. (documented)

Risk Engineering Wire rope – Category I Category I Severe distortion, significant corrosion, electric arc, etc. If a category-I deficiency is identified, an immediate determination shall be made by the qualified person as to: – Replacement of the wire rope, or – If the deficiency is localized, the wire rope may be severed at the bad spot and may be continued to be used. Photo credit: Bill Davis

Risk Engineering Wire rope – Category II Category II Visual broken wires Reduction of nominal rope diameter If a Category II deficiency is identified, an immediate determination shall be made by the qualified person as to: – Based on manufacturer recommendations, remove or monitor the wire rope for continued deterioration.

Risk Engineering Wire rope – Category II (continued) The qualified person determines when to replace the wire rope (no more than 30 days the deficiency is identified). A qualified person assesses the deficiency in light of the load and other conditions of use and determines it is safe for continued use. A qualified person establishes the parameters of use. All workers who conduct shift inspections are notified. The qualified person’s findings and procedures are documented.

Risk Engineering Wire rope – Category III Category III Electrical contact to power line Core protrusion or other distortion indicating core failure in rotation- resistant wire rope If a category-III deficiency is identified, operations involving use of the wire rope shall be prohibited until: – Wire rope is replaced (power line contact) – Deficiency is localized and problem corrected

Risk Engineering Multiple-crane lifts A multiple-crane lift must be planned with the following requirements: Plan must be developed by a competent, qualified person Plan must be designed to ensure that the requirements of the Subpart are met Lift must be supervised by a competent,-qualified person Photo credit: Bill Davis

Risk Engineering Overhead and gantry cranes All permanently installed cranes must meet except for (b)(1) All cranes not permanently installed must meet the same requirements, except a few definitions and manufacturer dated standards Photo credit: Bill Davis

Risk Engineering Design, construction and testing Shall meet certain sections of ASME B30.5 Sections not covered in ASME B30.5 have been added Allows two options when testing mobile cranes Applies to all cranes, manufactured after date of standard, used in the United States.

Risk Engineering Mandatory training Overhead power lines Signal persons Competent/qualified persons Operators Crush/pinch points Tag-out Photo credit: J. McRoy, face in the photo is the author – Bill Davis

Risk Engineering Conclusion (what should we do now?) Start training signal people (and instruct others to keep their hands in their pockets) Plan on how, when and where to get crane operators trained, and tested CCO already mandatory in these states: CaliforniaMinnesotaNew Jersey HawaiiWest VirginiaNevada MontanaNew MexicoOregon Rhode IslandUtah Washington(2010) Pennsylvania (in progress) South Carolina (DOT projects only) Make sure the equipment and supporting documentation meets the new rules

Risk Engineering © 2008 Zurich Services Corporation. All rights reserved. The information in this publication and presentation was compiled by Zurich Services Corporation from sources believed to be reliable. Further, all sample policies and procedures herein should serve as a guideline which you can use to create your own policies and procedures. We trust that you will customize these samples to reflect your own operations and believe that these samples may serve as a helpful platform for this endeavor. Any and all information contained herein is not intended to constitute legal advice and accordingly, you should consult with your own attorneys when developing programs and policies. We do not guarantee the accuracy of this information or any results and further assume no liability in connection with this publication and presentation and sample policies and procedures, including any information, methods or safety suggestions contained herein. Moreover, Zurich Services Corporation reminds you that this cannot be assumed to contain every acceptable safety and compliance procedure or that additional procedures might not be appropriate under the circumstances. The subject matter of this publication and presentation is not tied to any specific insurance product nor will adopting these policies and procedures ensure coverage under any insurance policy.