Group Work Offshore Energy Case Study The Nordic Association of Marine Insurers 1.

Slides:



Advertisements
Similar presentations
Mariner – a project in the making 20 December
Advertisements

GLOBAL RISK GLOBAL COVERAGE
Presentation Contents 1.Company structure 2.The Sevan technology 3.FPSO Sevan Piranema 4.FPSO Sevan Hummingbird 5.FPSO Sevan Voyageur 6.FPSO for ENI Goliat.
© DET JURIDISKE FAKULTET UNIVERSITETET I OSLO OWNER’S LIABILITY SECOND LECTURE LIMITATION OF LIABILITY.
Presentation to Houston Marine Insurance Seminar 2009 Barbara Jennings Tuesday 22 September 2009.
Gathering Oil From the Fields
Presentation for Master students, UIO April 25th , 2007
Regulations in the North Sea Keith Mayo, Head of Offshore Decommissioning, DECC, UK Date 1/2 October 2009.
LIQUIFIED NATURAL GAS CARRIER (LNG) ?. What is LNG ? fiedLiqui Natural Gas Natural Gas At Minus 260 Fahrenheit (162 C) Reduces to 1/600 of its original.
Raymond P. Hayden “The Changing Rules on the Playground” President The Maritime Law Association of the U.S.
Tanker safety Lisbon 11 May 2010 Manager Research and Projects.
Aberdeen-Stavanger Gateway. DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group.
Presentation by Oluwadamini Ajayi School : University of Minnesota – Twin Cities Course : Mechanical Engineering (BME) Year : 400 Level Company : Shell.
WELCOME TO THE CEFOR ANNUAL SEMINAR 9 April 2015.
Presentation to C.T. Bauer College of Business – University of Houston
Ocean Marine Overview and Catastrophe Modeling Issues Steven G. Searle, FCAS SVP Instrat.
General_Presentation.ppt February 2010 Slide 1 R\200060\Commercial\Typing\_GeneralPresentation\Presentations DORIS\PresentationDORISDiapo\PresentationSimplifiée.
Insurance is contract or agreement under which one party agrees in consideration of insurance premium to pay an agreed sum of money to the insured to.
Oil Pollution and Compensation an overview of oil the international oil spill compensation regimes Tim Wilkins Regional Manager Asia-Pacific Environmental.
Marine Builders’ Risks –
Opportunities to Innovate in Aquaculture with Composite Materials Presentation at 1 st Annual Maine Aquaculture R&D Forum January 14, 2015 Stephen Von.
Chamber of Shipping DRIVING ECONOMIC RESEARCH ON THE UK MARITIME ECONOMY.
Maritime Claims An Underwriter ’ s Perspective Eamonn Magee LLB. BL.
Recent Hull Claim Trends The cause of recent claim trends: Crew, congestion and harder trade, or purely a matter of inflation? Astrid Seltmann CEFOR Analyst/Actuary.
P&I AND MARINE INSURANCE
RISK MANAGEMENT FOR ENTERPRISES AND INDIVIDUALS Chapter 15 Multirisk Management Contracts: Business.
Svein Bergstad Director of Risk & Insurance, Seadrill Management
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
StarAdvantage ® Businessowners Program 2012 Program Enhancements Agent Presentation.
André Kroneberg Gard AS
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
ASI Insurance Overview Paul R. Objective Quick Overview of ASI Hull Insurance coverage Quick Overview of ASI Hull Insurance coverage Discuss Key Points.
Energy Loss Scenario based on the Nordic Marine Insurance Plan 2013 London 13 July 2015.
Introduction to DUCO June 2005 DUCO Umbilicals 27th June 2006 Subsea North East Launch Alasdair MacDonald.
Loss of Hire Anna F. Erlandsen – Norwegian Hull Club Oslo, 8th November 2013 The Nordic Association of Marine Insurers.
The Norwegian Marine Insurance Plan
LOSS OF HIRE Presentation for Master students, UIO March 28th, 2007 Advokat Haakon Stang Lund.
IMCC Dublin 2015 Scandinavian approach to large casualties By Ivar Brynildsen, VP Gard AS.
REINSURING CLAUSES Ozlem Gurses University of Southampton.
Department of Finance City of Pasadena Insurance Renewal Presented by David Serrano, Claims Coordinator July 8, 2013.
Facilities Engineering *1 st draft By: Saha. Development options ProposalDevelopment OptionEstimated Cost (Mil) A FPSO converted to Tanker Hull 300 kbo.
Jonathan McCoy Regional Property Underwriting Manager Zurich Energy Supply chain insurance and risk assessment Protecting profitability.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
What happens next An educational comedy in one act 1.
International Group and the pooling system Lars Nilsson The Swedish Club The Nordic Association of Marine Insurers 1.
MEMBER MEETING 13 & 16 DECEMBER 2014 OSLO & BERGEN.
Marine Claims – Loss of Hire NMIP Chapter 16 By Sveinung Måkestad, Vice President, Gard AS The Nordic Association of Marine Insurers 1.
Market Structure The Nordic Association of Marine Insurers.
THE NORDIC ASSOCIATION OF MARINE INSURERS Updated as per November 2015.
NOAA’s National Weather Service Meeting America’s Needs Brig. Gen. David L. Johnson, USAF (Ret.) NOAA Assistant Administrator for Weather Services AMS.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Building Offshore Wind in England: Centres of Offshore Renewable Engineering (C.O.R.E) British Embassy, Lisbon, 25th October 2012.
T o t a l s u b s e a s o l u t i o n s AB-X-PR Subsea 7 Inc. Results for First Quarter April
Sector San Francisco USCG Sector San Francisco State ACM – 18 January 2012.
International Group of P&I Clubs Rotterdam Rules
© 2016 Global Market Insights. All Rights Reserved Mooring System Market Growth Trend & Forecast by Mooring System Market.
THIRD LECTURE LIMITATION OF LIABILITY
The Standard Club P&I Cover for Offshore Operations 25 October 2016.
Vessel Lay-up Lineslip
GLOBAL RISK GLOBAL COVERAGE
INSTRUCTOR © 2017, John R. Fanchi
The role of insurance in the offshore oil and gas industry
Subsea Systems Market report categorizes the global market by Subsea Processing, Subsea Production & Geography.
nordic plan: insuring the special needs of MOUs and their construction
GLOBAL RISK GLOBAL COVERAGE
Four Years of Implementation of Protocol on Oil and Gas Insurance Placement: Challenges and Prospects Emmanuel Wadie BSc. (Admin), ACII (UK) Senior Energy.
PROTECTION & INDEMNITY
Marine Pollution Response Service
Presentation transcript:

Group Work Offshore Energy Case Study The Nordic Association of Marine Insurers 1

Details of the insured interests UNIT: FPSO “Offshore Producer 1” Owner: Nilssen Offshore AS Field: Lovely field – UK sector of the North Sea Operator: Hammer Oil & Gas Limited Tied in fields: Friend, East Lovely and Heartbreak Operator: Hammer Oil & Gas Ltd, but different joint venturers The Nordic Association of Marine Insurers 2

FPSO “Offshore Producer 1” The Nordic Association of Marine Insurers 3

FPSO Specifics Built: 2007 Contract duration: (2025) Oil production capacity: 80,000 bbls/d Water injection capacity: 100,000 bbls/d Gas compression capacity: 10 mmscfd Storage capacity: 1,800,000 bbls Mooring: Turret The Nordic Association of Marine Insurers 4

Hull, Hull Interest and Loss of Hire insurances FPSO: USD 625,000,000 (USD 500,000,000 Hull & Machinery + USD 125,000,000 Hull interest), Mooring system and subsea equipment owned by Nilssen Offshore AS (4 Risers, riser bases and flowlines, 2 umbilicals on Lovely Field) USD 100,000,000 separate insurance H&M + USD 25,000,000 H.I. (Other 6 risers and 3 umbilicals and all further subsea infrastructures were owned by the other field joint ventures, riser/umbilicals value USD 150,000,000, other subsea equipment value USD 500,000,000) Deductible USD 10 million per casualty under H&M insurance. Loss of Hire insured for USD 250,000 per day with 360 days indemnity per accident and in the aggregate in excess of a 120 day deductible. Term of Insurance: 1 January 2013 – 31 December 2013 Insured on the basis of the Nordic marine Insurance Plan 2013, Chapter 18, Sections 1 – 4. Lead Insurer H&M, H.I. and LOH: Academy Insurance Limited, Oslo, Norway The Nordic Association of Marine Insurers 5

P&I and CGL entry P&I insured for a limit of USD 750,000,000, deductible USD 250,000 per incident (Gard Rules for MOUs) CGL insurance for a limit of USD 25,000,000, deductible USD 50,000, but if incident involves the P&I insurance the combined deductibles not to exceed USD 250,000. (Extract of coverage attached) Entered with Solid P&I Club, Oslo, Norway, for the term: 12 months from 20 February 2013 Hammer Oil & Gas Ltd was a named co-insured under the H&M and H.I. insurances and Protective Co-Insured under the P&I and CGL insurances. The Nordic Association of Marine Insurers 6

The incident On 22 February 2013, during hurricane conditions, the FPSO, due to operator error, lost its heading against the weather and waves. This caused first one anchor line to break and further four more of the 10 anchor chains breaking within the space of 3 hours. This caused the FPSO to drift 250 meters away from its station with consequential destruction of the attached risers and umbilicals and damage to connected subsea flowlines. Production had been stopped, wellheads closed and risers depressurised at the onset of the hurricane. The FPSO had 800,000 barrels of produced oil in the storage tanks on board. Sales value USD100 per barrel. The Nordic Association of Marine Insurers 7

The Nordic Association of Marine Insurers 8

Immediate actions Tugs and anchor handlers were called in to assist in holding the FPSO on station and attempt to reconnect the broker anchor chains. Due to the threat of further bad weather the decision was taken to cut the risers, umbilicals and remaining anchor chains to move the FPSO to port. The Nordic Association of Marine Insurers 9

Heads of claims Salvage/Loss mitigation costs : USD 15,000,000 Removal of mooring/anchor system:USD 5,000,000 Removal of Lovely Risers/Umbilicals etc:USD 10,000,000 Removal of other fields’ risers etc.USD 15,000,000 FPSO turret damage repairs:USD 12,000,000 Mooring system (enhanced 12 anchor legs)USD 18,000,000 Lovely Risers/Umbilicals replacementUSD 80,000,000 Lovely Risers/Umbilical installationUSD 25,000,000 Other fields’ risers etc. repairs/replacement, incl. installationUSD 180,000,000 Total costs:USD 360,000,000 It is estimated that repairs will be completed and production to resume on 22 November 2014 The Nordic Association of Marine Insurers 10

Group Work Group 1 & 2 Consider the Salvage/Loss Mitigation costs claim Group 3 & 4 Consider the removal costs claim Group 5 & 6 Consider the repair/replacement costs claim All Groups Consider the Loss of Hire claim The Nordic Association of Marine Insurers 11