Watershed Programme (IWDP/DPAP) in Jharkhand by B. NIJALINGAPPA Additional Secretary Department of Rural Development, Jharkhand, Ranchi Date- 2-3 August.

Slides:



Advertisements
Similar presentations
PRIs Structure in Rajasthan Date:. 73 rd Constitutional Amendments Regarding PRIs. PRIs Structure in Rajasthan.
Advertisements

National Conference on Agriculture for Rabi Campaign 2014 Department of Agriculture & Cane Development Jharkhand.
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Copyright © 2014 by The University of Kansas Small Area Analysis.
Development of Lands of Poor Rural Development, Govt. of A.P.
The structure is intended to secure minimum information for appraisal of new projects by the Steering Committee for IWMP. States are free to bring forth.
Potential of convergence with NREGS and Inland fishery in rainfed area By: Neelkanth RRA Network.
Chief Executive Officer Jharkhand Watershed Mission
SUCCESS STORIES OF WATERSHED MANAGEMENT IN KARNATAKA
Presentation on RRA CP project at Bankura By PRADAN (7-8 May, 2013, New Delhi)
Presentation on Annual Action Plan for IWMP STATE: MEGHALAYA 1.
CONVERGENCE OF MGNREGA DEPARTMENT OF AGRICULTURE GOVERNMENT OF TRIPURA.
(P)PM&E problem/issues Issues in PPM&E that need to be addressed in order to enhance our organisational performance T.K. Orgle GHANA MINISTRY OF LANDS.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
INITIATIVES………. LAB to Land…… Punjab. Bring out a strategy for effective implementation of development programs in a convergent & coordinated approach.
INTEGRATED NATURAL RESOURCE MANAGEMENT (INRM) UNDER MGNREGA
Integrated Natural Resource Management(INRM) under MGNREGS in Kandhamal District.
PLANNING PROCESS FOR INTEGRATED NATURAL RESOURCE MANAGEMENT O/o. Commissioner, Rural Development, Andhra Pradesh, Hyderabad.
Committed to rural prosperity Proposal to Government of India for funding support System of Rice Intensification Capacity Building for Field Adoption.
Page 1 While there's life, there's hope! Watershed Success Stories from Andhra Pradesh Dr Suvarna Chandrappagari Special Commissioner, RD, GOAP.
DROUGHT – SOCIAL PERSPECTIVES 60% of net cultivated area is under rainfed Rainfed areas housing a majority of our rural poor & marginal farmers Major.
Convergence.
NATIONAL CONFERENCE Department of Agriculture, BIHAR, KHARIF-2014.
Welcome Chhattisgarh. BGREI Central Steering Committee (CSC) Review Meeting Meeting Dated - 20 Dec., 2013 Department of Agriculture, Chhattisgarh.
DEPARTMENT OF LAND RESOURCES
Meghalaya. C&RDDepartment Directorate of C&RD DRDA BDO SDPOADC State Institute of Rural Development Extension Training Centre.
Status of Farmers’ Organizations in Watershed villages of Mali AFRICA RISING SITES – KOUTIALA DISTRICT SIKASSO, 26 to 27 February 2015 By Dr Birhanu ZEMADIM.
Lab to Land Initiative Uttarakhand Institute of Rural Development UIRD Campus Rudrapur, Udhamsingh Nagar Uttarakhand.
11 th Meeting of General Council (GC) of National Food Security Mission (NFSM) 26 th August, 2015 Presentation by: Ajay Kumar Singh State Mission Director.
Meghalaya.  established in 1986 as  Autonomous Institution  Apex Level Institute for Training and Research in Rural Development NODAL AGENCY FOR CAPACITY.
Instructions for On Line feeding of IWMP projects (On departmental website)
Welcome Ethiopia teams visit to WASSAN, Hyderabad 14 th to 16 th March ‘13.
1 Drought Management Strategies – 2009 Dr.J.S. Samra, CEO National Rainfed Area Authority Ministry of Agriculture Government of India New Delhi.
KRISHI KARMAN AWARDS MEETING OF THE SCREENING COMMITTEE Date: 14 th December’2013 Krishi Bhawan, New Delhi.
Govt. of Jharkhand Deptt. of Agriculture & Cane Development.
GOVERNMENT OF TRIPURA TRIBAL WELFARE DEPARTMENT Presentation by Mr. L.H. Darlong, Secretary.
PRI & BNV Retreat Hyderabad Presentation by D.K.Jain Jt. Secretary MGNREGA Divison, MoRD 22 nd Sept; 2012.
National Conference of Project Directors of District Rural Development Agencies 23 rd June, 2011.
Process of Preparing District Human Development Reports in MP Amitabh Kumar Singh Debate.
Rajiv Gandhi Mission for Watershed Management Panchayat & Rural Development Department Government of Madhya Pradesh.
Mid Day Meal Nagaland. Nagaland at a glance Total Area : 16,579 Sq. kms. State Capital : Kohima (1, Mtrs. Above Sea level) Population : 19,80,602.
DHAN Foundation, Hyderabad
Review meeting on preparedness of Kharif Season, State : Assam Date : 2 nd June, 2015.
Journey of Watershed Approach in India B. Pradhan Department of Land Resources Ministry of Rural Development Govt. of India B. Pradhan Department of Land.
Presentation Format MGNREGA PMGSY Rural Housing : IAY BRGF Integrated Action Plan.
On 20 th & 21 st Nov, 2015 at Hyderabad SLNA, KERALA.
Workshop Gujarat State Watershed Management Agency (GSWMA) Gujarat State Commissionerate of Rural Development.
Dr Ranu Rani Sethi Senior Scientist ICAR-IIWM, Bhubaneswar, Odisha District Irrigation Plan (A case study of Nayagarh district of Odisha)
National Conference On Agriculture For Kharif Campaign-2015 Group-I : Strategy To Issue Soil Health Cards In Time Bound Manner.
© Mick Minard/REEF Reports Empowering Rural Communities ©Mick Minard/REEF Reports.
TRAINING FOR ALL:INTENSIVE TRAINING PROGRAMME IN A DISTRICT- RAJASTHAN A DoPT Initiative Department of Personnel and Training Government of India.
Hydrology and Water Resources Engineering ( ) Government Engineering College Rajkot Civil Engineering Department Faculty Guide: Prof V.G.Yadav DROUGHT.
PANCHAYAT RAJ AND TRADITIONAL CUSTOMARY PRACTICES & GOVERNANCE IN SCHEDULED AREAS Dr Dhuni Soren “Boarijore” 33 Longmeadow Road, Knowsley, Liverpool L34.
Institutionalizing People’s Participation in Water Resources Planning & Manageme nt- गाँव बढ़े तो देश बढ़े Taking Rural India >> Forward.
Panch-phal scheme in Chittorgarh district A panchayat horticulture initiative under MGNREGA.
REJUVINATION OF SPRINGS FOR CLIMATE RESILIENT DEVELOPMENT IN MEGHALAYA: A PROJECT UNDER NATIONAL ADAPTATION FUND FOR CLIMATE CHANGE (NAFCC)
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Proposals for State: ……..
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Pradhan Mantri Krishi Sinchayee Yojana
AQUIFER MAPPING ARTIFICIAL REACHARGE STRUCTURES ROLE OF CGWB
MDM-PAB Meeting- Jharkhand
LAB to Land…… Punjab INITIATIVES………..
Proposals for State: ……..
LAB -TO –LAND (Kakching C.D. Block)
For internal circulation and discussion only
National Conference On Agriculture For Kharif Campaign-2015
National Conference On Agriculture For Kharif Campaign-2015
MDM-PAB Meeting- Jharkhand
STRENGTHENING PP governance for resilient water resources
Presentation transcript:

Watershed Programme (IWDP/DPAP) in Jharkhand by B. NIJALINGAPPA Additional Secretary Department of Rural Development, Jharkhand, Ranchi Date- 2-3 August 2004 Place- Hyderabad Organiser- WASSAN

Jharkhand at a Glance Capital-Ranchi Total Geographical Area-79,714 Sq. km. Division-5 Districts-22 Sub-Division-35 No. of Blocks-211 No. of Villages-32,620 Total Numbers of Panchayats-3,759 Total Numbers of Lok Sabha Seats-14 Total Numbers of Assembly Seats-82 Total Population-2,69,09,428 Density of Poverty-338 persons/Sq. km. Total ST Population-28% of total population Total SC Population-12% of total population Literacy Rate-54.13% BPL-54.00%

Land Use Pattern Total Geographical Area lakh hec. Total Cultivable Land lakh hec. Net Sown Area lakh hec (25%) Net Irrigated Area lakh hec (8%) Forest Area lakh hec (29%) Wasteland lakh hec (18.97%)

Land Administration in Jharkhand 1. Chhotanagpur Tenancy Act (1908) 2. Santhalparagna Tenancy Act (1949)- Dumka, Sahebganj, Godda, Deoghar, Pakur 3. Bihar Schedule Area Regulation Act, Wilkinson Rules (Under Bengal Regulation XIII of 1833) 5. Indian Forest Act Forest Conservation Act Joint Forest Management Resolutions 1990 & Mining (Coal Bearing Act)

Rainfall in Ranchi, Palamu & Hazaribag Districts in Jharkhand State Rainfall in Ranchi, Palamu & Hazaribag Districts in Jharkhand State

SCHEDULE AREA IN JHARKHAND

DPAP BLOCKS IN JHARKHAND

DPAP PROJECTS IN JHARKHAND

IWDP PROJECTION IN JHARKHAND

Evaluation of IWDP Projects By SIRD, Ranchi

Outcome of the Watershed Workshop-11th March 2004 Proposals 1.WDT members- Quality training, Exposure visits, Project management. 2. Regular district level watershed committee meeting should be held. 3.Block level committee should also be formed so that full involvement of block level officials is ensured. 4.Block level officials should also be included in the district WAC. 5.NGOs, WDT, Govt. Officials should be trained in renowned institutions like MANAGE or MYRADA. 6.One PIA should get at least 5000 hec. Area for implementation. 7.Cost of the project should be based on quantum and nature of work required for eventual requirement. 8.One percent project cost to prepare DPR to be given to PIA. 9.Line departments should be the partners with WDT for planning, evaluation and implementing.

Impact Assessment Study of Watershed Development Projects in Jharkhand State Points for action  Guidelines for implementation of these projects were not meticulously followed, watershed association and watershed committees were not as per the guidelines.  Assets created was not satisfactory and most of them abandoned. Non use of assets.  Communities involvement in planning and designing was generally weak.  There were only 920 training camps were organised in four years and 772 persons were trained, which included 16% females consequently the projects have not succeeded in arousing community awareness for managing the land and water resources in an eco friendly manner.  Positive impact of the programmes was observed in terms of irrigability and crops coverage, the productivity increase has been inadequate and reflecting feeble of the watershed projects.

Some of the findings of the Study are listed below:  Performance of both DPAP and IWDP in the assigned districts was quite unsatisfactory in terms of the utilisation of financial allocations. In case of IWDP, the utilization was 67% and for DPAP, it was 65%.  The land use pattern in the selected watershed project areas in the assigned districts has shown improved land utilisation. The impact of the watershed development programmes is seen in the decrease in current follows by 9% and unused cultivable lands by 16% in the watershed area under DPAP. The net sown area and gross cropped area have recorded a moderate increase of 4% and 9% respectively after implementation of watersheds, which in turn increased the cropping intensity to 63.8% from 57.9% in the pre project period. There is no such change reported under IWDP.  The soil and water conservation works carried out in the watershed area under DP AP have effected augmentation of ground water as a result of deep percolation of rainwater and continuing stream flows. Also, water storage in percolation tanks and check dams have helped in improving the soil moisture regime. Area under irrigation, particularly during rabi season has increased.  The watershed districts have been found to be rich in animal population. Through watershed programmes, the animal population has increased by 12.9%. In case of poultry and fisheries, the change is extraordinary, registering an increase of 31 % and 158.6% respectively.  The watershed projects in almost all the districts have generated employment opportunities for the inhabitants of the project area.  The quality of maintenance of the functional assets is rated as 20% very good, 63% good and 16% fair. Only 1 percent is of poor quality, confined to Bokaro (1 earthen check dam and 2 nurseries) and Deoghar (4 gully control measure, 3 nala bank stabilization, 4 contour bunds and 7 nurseries).