12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.

Slides:



Advertisements
Similar presentations
______________________
Advertisements

Planning and Timely Implementation of Structural Funds Interventions Katarína Mathernová Director, DG Regional Policy European Commission 24 November 2005.
Implementation Modalities
Empowered lives. Resilient nations. Khan Younis Waste Water Treatment Plant 1 / KY WWTP.
Process and Requirements of the Accreditation of National Implementing Entities for Direct Access under the Adaptation Fund for the Pacific Sub Region.
More CMM Part Two : Details.
Single Audit Strategy LATVIA. Audit System The Audit Authority functions are carried out by the Internal Audit Department of the Ministry of.
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
Contractor Safety Management
Session V: Programme Roles and Responsibilities
Facilitate by: Mr. Ok Libounna Director for Financial Affair, Church World Service (CWS)
Managing the Information Technology Resource Jerry N. Luftman
Tomislav Skračić, MA Undergraduate English Course for MARITIME MANAGERS 6th Semester Essential reading: T. Skračić, Waypoint – English Textbook for Maritime.
"Integrity Pacts - Civil Control Mechanism for Safeguarding EU Funds"
Process Engineer’s Role in Project Management Dr Abdullah Malik.
1 ICAO TECHNICAL COOPERATION BUREAU Financial and Budgetary Control and Audit.
Performance Monitoring and Financial Reports Performance Monitoring and Financial Reports UNAIDS and Unified Budget and Workplan (UBW)
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
What is Chapter Affairs? Global View and Support –Leadership Forum –Chapter Executive Workshop –Chapter Awards Program Liaison between Chapters and ACC.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
1 The United Nations Development Programme Ministry of Housing, Utilities & Urban Development General Organization for Physical Planning “GOPP” Participatory.
MINISTRY OF ECONOMY AND FINANCE C.S.F M.A SPECIAL COORDINATION SERVICE FOR THE IMPLEMENTATION OF THE OPERATIONAL PROGRAMMES COMMUNITY SUPPORT.
Project Implementation Plan and Principal Activities
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
The Project Governance Inception Workshop and the First Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches.
Session 7 Development of a Water Sector Integrity Vulnerability Mitigation Plan Maria Jacobson, UNDP Water Governance Facility, SIWI Marie Laberge, UNDP.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
Towards Greater Policy Coherence: Lessons from Mauritius Mr S. Puran Analyst Ministry of Finance Mauritius 27 OCT 2008.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
1 1 UNDP’s Financial Management and Assurance March 2007.
 Sana Riaz  Registration No  Saira Khalid  Registration No
Report on the Evaluation Function Evaluation Office.
Croatian Experience with Management of EU Funds Nataša Mikuš, Deputy State Secretary Central Office for Development Strategy and Coordination of EU Funds.
Strategic Plan th October Management and Governance “GeSCI’s corporate structures and management arrangements were appropriate for.
Specification & Quantities Estimating
Relationship: PAC's, SAI's and Accountant General in Improving transparency and accountability process Contributions for discussion from Mozambique National.
Working with the private sector – experience from Russia Business Focal Points Workshop Bratislava, 25 October 2004 United Nations Development Programme.
VI. Developing a VSMP Program General Stormwater Training Workshop.
SOPAC GEF Sustainable Integrated Water Resources and Wastewater Management Project (Pacific IWRM Project)
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Support for Large scale Investment deals 1 June 2014.
Efficiency ׀ Transparency ׀ Accountability Multi-Donor Trust Fund Office Fund Management for Development Assistance UN-REDD Programme Policy Board Panama,
Water Services Trust Fund A presentation for Water Services Boards and Water Service Providers Eng. John Orwa 1  Support provided by the WSTF  Expectations.
A compliant value proposition Carsten Højlund, Head of Group Internal Audit.
Water Services Trust Fund Official Signing of the 2 nd Call for Proposals Contracts Tuesday 30 th March, 2010 WSTF-Funded Projects: WSTF Support, Expectations.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
CHILDREN OF PRISONERS PARTNERSHIP What is the Children of Prisoners (CP) Partnership? The CP Partnership is a funding project between PFI and selected.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
BUSINESS DEVELOPMENT PACKAGE Designed for Foreign Contractors, Consultants & Suppliers Specifically for Iran Infrastructural Projects 1.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
MOH 2 February Identify needs Prioritize needs Finalize list of endorsed needs Submit needs to MOPAD Consult with donor Negotiation (intra- and.
Minimum Set of Requirements for Suppliers
Donor Coordination Process
ICAO TECHNICAL COOPERATION BUREAU
Water Services Trust Fund Field Monitors Training Workshop
Uniper Energy Services
strengthening the elements of governance in Tajikistan
Minimum Set of Requirements for Suppliers
Implementation of the IPS MDTF
Clinical Engineering Lecture (3).
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
Sustainable Transition / Handover of malaria TB and HIV Global Fund Grants Generic 2018.
DTF implementation Roles and responsibilities
ESF IMPLEMENTATION IN CYPRUS
WITHIN THE INTERNATIONAL RECONSTRUCTION FUND FACILITY FOR IRAQ
Construction Management Services April 16, 2018
Presentation transcript:

12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements

KY WWTP Project Partners 12-May-152 Kuwait Fund for Arab Economic Development Islamic Development Bank Government of Japan United Nations Development Programme Palestinian Water Authority Coastal Municipalities Water Utility Municipality of Khan Younis PartnersDonors

Project Organization Structure 12-May-153 Project Board Main Beneficiary Deputy Head of PWA, CMWU Director, Mayor of Khan Younis Municipality Main Beneficiary Deputy Head of PWA, CMWU Director, Mayor of Khan Younis Municipality Executive UNDP/PAPP Deputy Special Representative Executive UNDP/PAPP Deputy Special Representative Main Supplier Government of Japan and Kuwait Fund / Islamic Development Bank Main Supplier Government of Japan and Kuwait Fund / Islamic Development Bank Programme Overall technical Assurance UNDP/PAPP Programme Analyst Programme Overall technical Assurance UNDP/PAPP Programme Analyst Project Support Project Manager Local Construction Company for Construction of Emergency Pressure Pipeline Local Construction Company for Construction of Emergency Pressure Pipeline International Construction Company For Construction of KY WWTP, Phase I International Construction Company For Construction of KY WWTP, Phase I International Construction Supervision Firm in Joint Venture with Local Firm UNDP/PAPP Project Implementation Unit Technical Quality Assurance UNDP/PAPP Local Construction Company for Construction of Electrical Power Line Local Construction Company for Construction of Electrical Power Line

12-May-154 Quality assurance, accountability and transparency International standards of procurement Experience in financial management of large scale programmes Internal and external audits at local and headquarter levels Global knowledge networks and international experience Coordination mechanisms to access materials into Gaza Role of the United Nations Development Programme (UNDP) Role of the United Nations Development Programme (UNDP) Executive and Implementing

12-May-155 Assign a Programme Analyst and PIU for quality control and assurance, monitoring and follow-up of project issues for effective implementation. Receive and administer the funds from Donors. Prepare Agreements with all counterparts. Review all received progress reports from the CMWU to ensure full accountability and compliance. Role of the United Nations Development Programme (UNDP) Role of the United Nations Development Programme (UNDP) Executive and Implementing

12-May-156 Recruit an international firm for pre contractual services and construction supervision. Review the project tender documents followed by tendering process according to Global UNDP procurement rules and regulations. Evaluate the received tenders and award the contract with PWA and CMWU Cooperation. Fully accountable for the full implementation of the project components excluding infiltration. Role of the United Nations Development Programme (UNDP) Role of the United Nations Development Programme (UNDP) Executive & Implementing

12-May-157 Ensure that the executive board of the project meet on quarterly basis to discuss the project progress and challenges; Ensure the full visibility of the donors and highlight the role of counterparts. Coordinate with UNDSS to provide security update on daily basis for all staff. Report to donor on quarterly basis and when needed. Role of the United Nations Development Programme (UNDP) Role of the United Nations Development Programme (UNDP) Executive and Implementing

Main Beneficiary and Regulator 12-May-158 Follow up on the land acquisition issue for the infiltration basins; Secure the power supply needed to run the treatment facility; Agreement with UNDP on cooperation and implementation; Review and Approve any changes to the detailed designs and specifications of the project that had already been approved in the design stage as of Dec ; Assign focal persons to ensure that the quality is maintained in the tendering and implementation stages. Role of the Palestinian Water Authority (PWA)

12-May-159 Assign a mechanical and electrical engineer at the construction stage and report directly to the Project Manager; Responsible for the implementation of the infiltration basins; Receive the funds from UNDP/PAPP to manage the capacity development component and prepare progress reports in that respect; Assign a team responsible for operation and maintenance, during the one year operation stage. Follow up on the land acquisition issue for the infiltration basins. Role of Coastal Municipalities Water Utility (CMWU) Main Beneficiary and Final Operator

12-May-1510 Work closely with counterparts to secure the land for the infiltration basins and the construction permits; Support in presenting the project objectives to the residents of Khan Younis Governorate; Play a key role with UNDP/PAPP in responding to the residents’ concerns; Participate at the project board as senior beneficiary of the project and attend quarterly and annual review meetings. Role of Khan Younis Municipality (KY M) Main Beneficiary

12-May-1511 Quality of KY WWTP Project Project Manager International consultant Two project engineers One electromechanical engineer One project Assistant TOOLS 1.Day to day management. 2.Weekly meetings. 3.Shop drawings, work plans and method statements. 4.Approval of materials. 5.Financial processes utilizing Global Atlas system. 6.Monthly, quarterly, annual reports. 7.As built drawings. Project Board (PWA role as regulator) Program Analyst TOOLS 1.Progress quarterly meetings with all stakeholders. 2.Quality assurance monitoring forms. 3.Highlight reports to project board in case of issues. 4.Donor reports. 5.UNDP financial / administrative system (HR, procurement, finance) 6.Internal and external Auditing (financial and programmatic). Quality AssuranceQuality Control Press for detail

ou !! hank T Y Empowered lives. Resilient nations. We Can Make a Difference