Broward County Cities Kickoff Meeting Thursday, December 19, 2013 9:00 – 11:00 am BC GCW.

Slides:



Advertisements
Similar presentations
CONTENTS 1.Technology Paradigms a.Old Paradigm example b.Old Energy Paradigm, Model, Costs and Status c.New Paradigm example d.New Energy Paradigm 2.Key.
Advertisements

Solar Power Presented By G2Power Technologies Saint Louis, MO.
Fiscal Equity: Florida’s Intra-District Distribution Of Ad Valorem Revenue Association of Education Finance & Policy 38 th Annual Conference – New Orleans.
BROWARD COUNTY GO SOLARFEST ACCESSING AFFORDABLE SOLAR FINANCING THROUGH PACE.
Solar Implementation in SE Florida: Go Solar Florida Dec 10, 2013 RCAP Implementation Workshop “Catalyzing Solar Development and Implementation in Southeast.
By Dale A Gulden, Solar Direct CEO. Solar Electric – Basic Components 1. Modules – solar electric collectors. 3 basic types in the marketplace: Mono crystalline,
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
Welcome and Introductions CoServ Presentation & Member Input.
PRACTICAL ASPECTS OF CUSTOMER OWNED GENERATION A DISCUSSION OF INTERCONNECTION POLICIES, METERING STRATEGIES AND BILLING CONSIDERATIONS IMUA ANNUAL CONFERENCE.
1 RELIABILITY AFFORDABILITY ENVIRONMENTAL STEWARDSHIP Bringing Solar to the Community Jennifer Szaro, Orlando Utilities Commission.
Enterprise Zone Quarterly Report to the City of Leesburg.
Brian Ross, Principal, CR Planning, Inc. Local Best Practices for Solar: Planning, Zoning, Permitting 1 Solar Minnesota November 26, 2012.
Broward County-wide Master Reuse Plan
Shawn Murphy September 29, Shawn Murphy, PE ENGR10 Guest Speaker  Solar Photovoltaics ◦ Electricity Generation, the CEC and PUC ◦ Silicon Solar.
Go SOLAR Broward Rooftop Solar Challenge. What is Go SOLAR Broward Rooftop Solar Challenge? U.S. Department of Energy Grant Broward County and 14 partner.
Keynote: Building a National Solar Market. Building a National Solar Market Tom Tansy Chairman of SunSpec Alliance and Program Manager of Solar 3.0.
1 ENCO Utility Services How Could a Boulder Municipal Utility Run Its Electric Distribution System? June 1, 2011 Boulder, Colorado
Go Solar Florida Update March 25, 2015 Gold Coast Association of Code Enforcement Board.
Rooftop Solar Challenge II Planning Meeting What was accomplished in Phase I? What are the plans for Phase II? How can your municipality get involved?
Link Building PV project By: Culver Matt Labaume Natasha Narnio Guillaume Roux Arnaud Stanton Andrew Thompson Matt Troyano Joana ENS Renewable.
Solarize [municipality] Solar. Simple. Together. [Add Solarize URL to website]
Community Planning and Permitting for Solar Energy Efficiencies.
The Role of Renewable Energy in Addressing Climate Change Australian Government Support for Renewable Energy Denis Smedley Director Renewable Energy Technologies.
Agenda 1.Welcome and Introductions 2.Go SOLAR Program Update 3.Go SOLAR Online Permitting System 4.Guide to Go SOLAR – for home owners and small business.
Solar Express Year-End Review Leslie Moynihan January 13, 2014.
Go SOLAR Broward Rooftop Solar Challenge Go SOLAR Broward Rooftop Solar Challenge Challenge Overview Identification of Key Stakeholders Standardized Permitting.
Welcome Go SOLAR Outreach Committee Meeting September 12, 2012.
Go Solar Florida Spanish Delegation to Renewable Energy Forum, November 14, 2014 Matthew R Anderson, Outreach/Marketing Chair- Go Solar Florida 1.
Small Wind 101: An Overview of Small-Scale Wind Electric Systems Affordable, Clean Energy for Homes, Farms & Businesses.
Go SOLAR Broward Rooftop Solar Challenge. Go SOLAR Broward Rooftop Solar Challenge Challenge Overview Proposed Permitting Solution Solar Contractors Feedback.
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
Planning and Zoning Required Deliverables – Go SOLAR Florida Planning and Zoning Best Management Practices Phase 1: Planning and Zoning Best Management.
Agenda Welcome Go SOLAR Grant Mid-Year Status Update On-going Challenges – In-kind Exchange Agreement for Structural Designs Potential solutions from.
We hear much about energy problems; supply shortages, pollution issues and high prices, but the solutions to these problems are here now in the form of.
Large Users Meeting FY 2012 Large User Rate Estimate.
Considering a Community Solar Program for Grafton Presentation to the Board of Selectmen December 1, 2015.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
CRA What is it and how can it help me? What defines a CRA AreaWhat defines a CRA Area and how was it formed? CRA Goals and ObjectivesCRA Goals and Objectives.
Distributed Generation Chau Nguyen, Pricing & Sales Support
Go Solar Florida Status Update Overview For Today The Go SOLAR Florida Status Grant Progress - Context The Way Forward.
Hawai’i Over 77,000 PV systems interconnected or approved statewide. 17% of customers 500+ MW of PV installed Oahu: 32% of single family homes have.
POWER SYSTEMS CONFERENCE POWER SYSTEMS CONFERENCE Analysis of a Residential 5kW Grid-tied Photovoltaic System Presented by: Yacouba Moumouni Co-authors:
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Department of Financial Services
Calvin, Giordano & Associates, Inc.
GIS CONSULTANT SERVICES · RFP# · JUNE 18, 2015
YGRENEWORKS CLEAN ENERGY GREEN CORRIDOR
CITY OF HALLANDALE BEACH
Go Solar Florida Spanish Delegation to Renewable Energy Forum, November 14, 2014 Matthew R Anderson, Outreach/Marketing Chair- Go Solar Florida.
Distributed Generation Chau Nguyen, Pricing & Sales Support
Carvalho's Cleaning – The Art of Clean
Photovoltaic Systems Engineering Session 27
What is Go SOLAR Broward Rooftop Solar Challenge?
Broward County Cities Kickoff Meeting
Go SOLAR Outreach Committee Meeting
Monthly Status Teleconference
A quick walk through of how the system will work
Customer Dedicated Solar
SOLID WASTE disposal WHERE ARE WE?
City Council April 30, 2018 Item 13
Solar Implementation in SE Florida: Go Solar Florida
Go Solar Florida Spanish Delegation to Renewable Energy Forum, November 14, 2014 Matthew R Anderson, Outreach/Marketing Chair- Go Solar Florida.
A quick walk through of how the system will work
Monthly Status Teleconference
SOLID WASTE disposal WHERE ARE WE?
Rooftop Solar Challenge II: Go SOLAR Florida
The Vision of Go Solar Florida
Go SOLAR Outreach Committee Meeting
Photovoltaic Systems Engineering Session 23
Presentation transcript:

Broward County Cities Kickoff Meeting Thursday, December 19, :00 – 11:00 am BC GCW

Kick-off Agenda 1.Welcome and Introductions 2.Go SOLAR Overview a.Go SOLAR Broward b.Go SOLAR Florida 3.What we Need From You a.Broad participation in Second Annual Go SOLAR & Renewable Energy FestSecond Annual Go SOLAR & Renewable Energy Fest Marketing Exhibit Sponsors Attendance b.Execute the Inter-local AgreementInter-local Agreement c.Adoption of Model Zoning Ordinance & recommendations for modifications to the Go SOLAR Planning & Zoning Best Management PracticesZoning Ordinance d.Your Building Department Sign Off on preapproved plans including zoning approval (plans on CD handed out today) e.Your attendance at a Training Session (to be scheduled) on how the Go SOLAR Online Permitting System Works f.Information SheetInformation Sheet g.Agency Questionnaire FormAgency Questionnaire Form h.High Resolution Logos 4.Any Questions?

Self-introductions Please state name, title, agency you represent and experience with solar

SunShot is the Apollo Mission of Our Time

Panel Prices Plummeted Source: Mints, P. (2011). Photovoltaic Manufacturer Shipments, Capacity, & Competitive Analysis 20010/2011. Report # NPS-Supply6. Palo Alto, CA: Navigant Consulting Photovoltaic Service Program.

However...

Soft Costs MaintenanceInstallation Customer Acquisition PermittingFinancing Over 64% of the cost of solar installations are due to soft costs. Our group can work on reducing permitting soft costs.

Go SOLAR Broward Our first grant from DOE in 2012 Partners – Coconut Creek – Dania Beach – Town of Davie* – Deerfield Beach – Fort Lauderdale – Hallandale Beach * – Hillsboro Beach – Lauderdale by the Sea* – Miramar – North Lauderdale – Oakland Park – Pompano Beach – Sunrise – Tamarac – Unincorporated BC * Did not sign ILA yet Accomplishments Partners signed ILA Removed verbiage from zoning/planning that restricted solar Created electronic permit process (gosolar.broward.org) Agreed to one fee ($500 + surcharges) Preapproved plans Created Financing Best Practices Trained participants in use of electronic permit system Held Go SOLAR Fest January 2013

Go SOLAR Florida Alachua, Broward, Miami-Dade, Monroe, Orange, St. Lucie Counties and the City of Venice Cooper City, Hollywood, Lauderdale Lakes, Lauderhill, Lighthouse Point, Margate, Pembroke Pines, Plantation and Wilton Manors Florida Solar Energy Center (FSEC) Florida Atlantic University (FAU) Partners Increase grid-tied solar systems in Florida through improved awareness, electronic permitting processes, and financial options for installation Goal Standard, successful model for inexpensive and rapid solar permitting Increase the Florida grid-tied solar market State program for solar Financial Options Priorities

Go SOLAR Florida Objectives Develop & market a consortium of early adopter counties in Florida Lower soft costs of PV by standardizing permitting process in 7 counties Standardize solar-related zoning Enhance financing options Expand net metering & interconnection standards Market Our second grant from DOE in 2013 City Partners – Cooper City – Hollywood – Lauderdale Lakes – Lauderhill – Lighthouse Point – Margate* – Pembroke Pines – Plantation – Wilton Manors * Already signed ILA

What we Need From You a.Broad participation in Second Annual Go SOLAR & Renewable Energy FestSecond Annual Go SOLAR & Renewable Energy Fest Marketing Exhibit Sponsors Attendance b.Execute the Inter-local AgreementInter-local Agreement c.Adoption of Model Zoning Ordinance & recommendations for modifications to the Go SOLAR Planning & Zoning Best Management PracticesZoning Ordinance d.Your Building Department Sign Off on preapproved plans including zoning approval (plans on CD handed out today) e.Your attendance at a Training Session (to be scheduled) on how the Go SOLAR Online Permitting System Works f.Information SheetInformation Sheet g.Agency Questionnaire FormAgency Questionnaire Form h.High Resolution Logos

Second Annual Go SOLAR & Renewable Energy Fest June 6 &7, 2014 Greater Fort Lauderdale/BC Convention Center Free to attend $200 to Exhibit Sponsorship packages available Register today Fest2014/AboutGoSOLARFest/Pages/RegisterN ow.aspx

Sign the Inter-local Agreement due Inter-local Agreement BC agrees to accept the online application & permit fee, and to disseminate both to the city City agrees to give BC the authority to receive applications, to issue permits & distribute fees to city City retains authority to conduct inspections & re- inspections City agrees to modify zoning regs to allow web based applications shall not be subject to further zoning review, inspections or fees. Already received from Margate

Zoning Ordinance due Intent is to remove barriers to installation of rooftop solar photovoltaic systems Provisions for web based applications for pre- approved installations Nothing shall be deemed to prohibit installation of rooftop pv solar systems

Building & Zoning Dept Sign-off on Pre-approved Plans These plans have already been approved by Go SOLAR Broward Cities Plans provided to each Go SOLAR Florida city on CD Approval requested by January 31, 2014

Information Sheet due Already Received From: Margate Plantation Wilton Manors Thank you!

Agency Questionnaire Form due

Any Questions?

Terms Net Metering -Net metering is a billing mechanism that credits solar energy system owners for the electricity they add to the grid. For example, if a residential customer has a PV system on the home's rooftop, it may generate more electricity than the home uses during daylight hours. If the home is net-metered, the electricity meter will run backwards to provide a credit against what electricity is consumed at night or other periods where the home's electricity use exceeds the system's output. Customers are only billed for their "net" energy use. On average, only 20-40% of a solar energy system’s output ever goes into the grid. Exported solar electricity serves nearby customers’ loads. Interconnection (and related standards) refers to the technical and practical aspects of connecting the solar generator to the grid Soft costs – non-hardware costs include permitting, installation and interconnection Source: Solar Energy Industries Association and DOE

Resources DOE Rooftop Solar Challenge Second Annual Go SOLAR & Renewable Energy Fest t2014/Pages/Default.aspx t2014/Pages/Default.aspx Go SOLAR Online Permitting Kay Sommers