CornellVideo Talk. Dec 9 2006 page 1 John Byrd Experimental studies of the fast- beam ion instability in the ALS- The Sequel John Byrd Lawrence Berkeley.

Slides:



Advertisements
Similar presentations
John Byrd 26 Sept-7 Oct 2011MEPAS, Guanajuato, Mexico1 Collective Effects in Storage Rings Lecture 2 John Byrd Lawrence Berkeley National Laboratory.
Advertisements

Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune shift for 45 and 115 bunch positron trains with 14ns.
Beam-ion Instabilities in SPEAR3 Lanfa Wang, SLAC KEK accelerator physics Seminar 2/15/
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
Recent electron cloud studies at CESR David Rice Cornell University Laboratory for Elementary-Particle Physics.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Simulation of Beam Instabilities in SPring-8 T. Nakamura JASRI / SPring-8
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Observations and Analysis of Fast Beam-Ion Instabilities at SOLEIL International Workshop on Linear Colliders 2010 Accelerator Working Group 2, October,
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
ATF Damping Ring in 2010 autumn Multibunch instability study Measurement (S. Kuroda, T. Naito and K. Kubo) and Calculation of ion trapping (Kubo)
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Electron cloud beam dynamics G. Dugan, Cornell University CesrTA Advisory Committee 9/11/12.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
1 Update on Ion Studies Guoxing Xia, Eckhard Elsen ILC2007 Workshop, May 30~Jun 2, 2007 DESY, Hamburg.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
BPM and BSM Tune Measurements August 2, 2007 B. Cerio, R. Holtzapple.
LCWS, UTA, Reaching ultra-low emittance at SLS through (systematic and) random optimization LCWS 2012 Joint CLIC/ILC Working Group – Damping.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
KoPAS 2015, IBS, Daejeon July Collective Instabilities (Part 1) John Byrd Lawrence Berkeley National Laboratory John Byrd Lawrence Berkeley.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Two-beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Observations of Electron Cloud Phenomena at PETRA III Presentation at the ECLOUD 2012 workshop Rainer Wanzenberg ECLOUD 2012 June 5-8, 2012 Hotel Hermitage.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Experiments on Fast Ion Instability at PLS
Bocheng Jiang SSRF AP group
Electron Cloud R&D at Cornell ILCDR08--7/8/08
Session 5: Instability Modeling, Observations and Cures
Fast Ion Instability Study at DESY
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Status of Fast Ion Instability Studies
e- Cloud Machine Studies-Tune Shift Studies
Beam Optics Set-Up at SLAC End Station A
Fast Ion Experiments at ATF
CESRTA Measurement of Electron Cloud Density by TE Wave and RFA
E-cloud instability at CESR TA
e+/e- Vertical Beam Dynamics during CHESS Operation-Part II
CesrTA Experimental Schedule and Priorities
Electron cloud studies at CESR
Study of Fast Ions in CESR
CLIC damping rings working plan towards the CDR
Instability measurement plans at ATF
Ions in ATF ISG-X June 20th, 2003.
Passive harmonic cavities for bunch shortening
Presentation transcript:

CornellVideo Talk. Dec page 1 John Byrd Experimental studies of the fast- beam ion instability in the ALS- The Sequel John Byrd Lawrence Berkeley National Laboratory

CornellVideo Talk. Dec page 2 John Byrd Motivation FBII predicted in First experimentally observed in dedicated tests at ALS and PLS in Initial tests mostly done as an existence proof. Since observed in several other rings. Predicted to be severe in ILC DR and serious for ultralow emittance operation of 3.5 generation light sources. Simulations indicate mitigating effects on growth rates (Landau damping, ion frequency spread, etc.) Further experimental evidence needed to inform ILC DR design. –direct measurement of growth rates via grow/damp technique to compare with theory and simulations –effectiveness of feedback to control instability –evaluation of incoherent and coherent growth

CornellVideo Talk. Dec page 3 John Byrd Indirect Growth Rate Measurement at a given pressure, we can vary the instability growth rate by varying the length of the bunch train (using a fixed current/bunch) for the experimental conditions, the theory predicts a growth rate of ~1/msec at about 8 bunches. Our FB damping rate for 0.5 mA/bunch is ~1.2 msec.

CornellVideo Talk. Dec page 4 John Byrd FBII Revisited Several things have changed in the ALS since the original expts. low vertical emittance mode (C. Steier) Achieved 5 pm vertical emittance (6.75 nm ALS motivated to understand effects limiting brightness HOM damping of main and harmonic cavities nearly eliminates effects of conventional instabilities. improved instrumentation digital bunch-to-bunch recording of BPM difference signal new pinhole array synch light monitor; possibility of using gated camera (F. Sannibale) optical streak camera mature understanding of transverse feedback system Try to observe and characterize FBII under conditions approaching ILC DR!

CornellVideo Talk. Dec page 5 John Byrd ALS Experimental Plan Demonstrate grow/damp technique under nominal conditions evaluate resolution of turn-by-turn vertical motion measure growth rates of conventional instabilities and optimize damping rate of TFB Re-establish low-emittance mode record vertical beam size vs. emittance, bunch number, etc. observe FBII via vertical spectrum and beam size establish conditions where TFB can control FBII; increase pressure if necessary measure FBII growth rates via grow/damp

CornellVideo Talk. Dec page 6 John Byrd Summary Potential exists to characterize FBII in a situation which approaches ILC DR conditions –low vertical emittance –< 1 ntorr vacuum Several experimental techniques available –beam size; time resolved via streak camera or gated CCD –turn-by-turn data analysis sideband spectra amplitude/phase shift along train –direct growth rate measurement via grow/damp to compare with simulation/theory –variable fill patterns Please let us know if you want to help!