High gradient studies in simple setups (for discussion) T. Higo.

Slides:



Advertisements
Similar presentations
Single-Cell Standing Wave Structures: Design
Advertisements

CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Single cell standing wave tests data analysis Jiaru Shi Sep 27, 2011 LCWS11, Granada, Spain.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
High gradient features from Nextef on recent CLIC prototype structures US-HG workshop, SLAC 9 February 2011 T. Higo representing X-band group of KEK.
CLIC RF structure master schedule and CERN production
Report from Nextef IWLC10, Genève, Oct. 20 T. Higo (KEK)
Working Group 1: Microwave Acceleration Summary 10 July 2009.
Dual Mode Cavity for Testing Effects of RF Magnetic field on Breakdown Properties A. Dian Yeremian, Valery Dolgashev, Sami Tantawi SLAC National Accelerator.
High Gradient and High Q R&D Topics 1- Explore Q > for TESLA parameter flexibility –higher luminosity through higher rep rate, longer rf pulse… 2-
R&D For Accelerating Structures H. Padamsee. TESLA Niobium, one meter length, rf = 1.3 GHz Copper, 53 cm, rf = 11.4 GHz.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
KEK activities on CLIC X-band Accelerating Structures Tsinghua Univ., March 24 T. Higo (KEK)
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
R&D status and future strategy in KEK X-band area May 16, 2011 T. Higo (KEK)
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
Structure Nick-Names and Documentation Germana creates/created a structure traveler describing the handling (Features: each step, with date and description,
040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
H 2, partial gas, vacuum furnace for diffusion bonding against brazing 25 Nov. 2014, CERN Toshi Higo (KEK)
TD24 R05 N1 after high-power test analysis plans A. Degiovanni, M. Aicheler, N. Mouriz Irazabal, A.T. Perez Fontenla, R. Wegner CLIC RF Structure Development.
10/2007 M.Taborelli, TS-MME Structure Manufacturing, Achievements and Challenges M.Taborelli -Technology -Shape accuracy -Surface quality -Assembly accuracy.
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
Engineering perspectives on quadrants (1/2) Experience on our first quad (Higo) (2/2) Perspective on quad (Higashi) CLIC09, Oct T. Higo (KEK)
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Surface Treatment Issues for RF Structure Fabrication Juwen Wang SLAC National Accelerator Laboratory X-Band Accelerating Structure Review November, 2014,
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
Electron Stimulated Desorption of OFE Copper Chiara Pasquino, Politecnico di Milano 9th March 2011, RF Structure Meeting.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
W. Wuensch CLIC project meeting High-power rf structure testing.
CLIC09 WG4 RF Structure1 Engineering Perspectives on Quadrants (2) CLIC09 Workshop KEK Y.Higashi.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
High-gradient rf constraints W. Wuensch X-band workshop
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Discussion on critical issues for testing: breakdown identification, preparation for test, processing protocol, etc. 4 th Annual X-band Structure Collaboration.
Some information from Nextef For poster session in IWLC T. Higo.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Update on PETS experiments (Igor for the CLIC collaboration)
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Test Accelerating Structures Designs, Objectives and Critical Issues
KEK Status and plans of structure production and testing
Effort to identify the critical issues for high gradient
Testing Infrastructure, Program and Milestones
CLIC rf structure program
T24 results and comparison to the preceding studies on CLIC prototype structures May 17, 2011 T. Higo (KEK)
5th X-Band Structure Collaboration Meeting
Presentation transcript:

High gradient studies in simple setups (for discussion) T. Higo

Aim and the way to proceed We want it to complement the tests with CLIC prototype structure evaluation. It should give us an insight to the basic mechanism. It should be done in well defined situation. It should be done in cheap and fast turn around mode.

Possible RF facilities and their capacities SLAC – Single-cell stand 10 tests/yr?? – Pulse heating specific to pulse heating?? – ASTA depends on other programs with high power?? – NLCTA conflict against prototype tests?? KEK – KT1-B 1 test/month X 8/yr ?? CERN Others

What do study ? Geometry – (a,t)  C10/CD10 – undamp / heavy damp / DDS / choke – Quad-like junction SW / TW – 1-, 3-, 10-cell SW vs 10-cell TW Es / Hs – Two-mode

What do study? Material – Impurity – Inclusion; Ag, Zr, … – Crystal structure Fine Grain, Large Grain Machining – Turning – Milling Carbide, diamond, Ra, ball end mill, end mill, …. – Burr, chamfer, step, rounding, ……

What do study? Surface treatment – HPR or other cleaning such as dry ice – CP, EP – Melting by EBW High temperature treatment – Vacuum bake – Hydrogen furnace – Partial hydrogen gas + vacuum

How to study with single-cell setup Need a reference processing protocol – Valery’s is well established and suitable? Without stopping by BD, fast, …..? – Should be applied to full range of study items Try to see the processing stage – Stop and inspect at very early stage Evaluate at various target levels – Evaluate such as BDR at medium Eacc=80MV/m? before going to ultimately high level 100—120 and level

C10 / CD10 On-going? How seriously do we proceed now? Need to evaluate for TW case

Pulse heating In-situ time-dependent evaluation It help us understand the evolution and possibly the key mechanism Any specific study proposal?

DC breakdown/FE setup CERN Uppsala SLAC KEK Saitama U. Any comment?

Coupon surface study CERN vast study exists in EDMS SLAC has experience compiled well? KEK has experience not well documented Each group does as needed to confirm each technology Do we need any specific in collaboration?

Discussion on RF study Can we confirm vast experimental data taken by Valery’s setup? Some of them may be worthwhile to restudy. What can we or should we do in a similar setup but in other view point? Proposal, comment, ……