Material Requirements Planning

Slides:



Advertisements
Similar presentations
ISEN 315 Spring 2011 Dr. Gary Gaukler. Hierarchy of Planning Forecast of aggregate demand over time horizon Aggregate Production Plan: determine aggregate.
Advertisements

Material Requirements Planning
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Master Production Scheduling (MPS) – Basic Techniques pom
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
Principles of Operations Management
4. Production and Material Planning
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
MRP, MRP II, and ERP.
Material Requirement Planning (MRP)
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
11/10: MRP continued. Review: Material Requirements Planning Need to know: –Master Schedule –Bill of Materials –Lead times –Due date. Go to spreadsheet.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Materials Requirements Planning
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 22 1.
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Lecture 9 Materials Requirements Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
1 Operations Management MRP Lecture 22 (Chapter 14)
Hierarchy of Production Decisions
4/4: Material Requirements Planning Dependent inventory model For in-house inventory planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Chapter 15 Resource Requirements Planning: MRP and CRP.
BA7201: Operations Management Assignment - II Q1: Compute the Net Requirement and timing of production for each component Q2: Draw up the projected available.
Master Production Scheduling
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Introduction to Materials Management Chapter 4 – Material Requirements Planning.
Low Level Coded Product Structure Tree
Material Requirements Planning (MRP) and ERP
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
INVENTORY CONTROL OF MANUFACTURING SYSTEMS Prof. Dr. Orhan TORKUL Res. Assistant M. Raşit CESUR.
1 By: Prof. Y. Peter Chiu MRP & JIT ~ HOMEWORK SOLUTION ~
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Chapter 16 Materials Requirements Planning
Introduction to Materials Management
Material Requirement Planning (MRP)
MRP Introduction EXAMPLES
Presentation transcript:

Material Requirements Planning Dependent Inventory Model. For in-house inventory planning.

Requirements of MRP Master production schedule (what to made, when) Specifications, or Bill of Material (how to make the product) Inventory availability Purchase orders outstanding (what is on order) Lead times (how long it takes to get various components)

Master Production Schedule Tells us what is required to satisfy demand and meet the production plan. Statement of what is to be produced, NOT a forecast of demand.

Specifications, or Bill of Material A list of quantities of components, ingredients, or materials to make a final product. Provides the product structure. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D).

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C 2D 2E

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C 2D 2E 2F 2E

EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of one circuit board (G) and one speaker (D). A 2B 3C 2D 2E 2F 2E G D

Note that the numbers here are only relevant to the level above them! EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of one circuit board (G) and one speaker (D). Note that the numbers here are only relevant to the level above them! A 2B 3C 2D 2E 2F 2E G D

Called an “exploded” product structure. Items above a level are PARENTS; items below a level are COMPONENTS or CHILDREN. A 2B 3C 2D 2E 2F 2E G D

4 levels here. Level 0 level 1 level 2 level 3 A 2B 3C 2D 2E 2F 2E G D

Low-level coding Necessary for identical items existing at diff. levels in the BOM. An item is coded at the lowest level at which it is used. Level 0 level 1 level 2 level 3 A 2B 3C 2D 2E 2F 2E G D

Low-level coding Useful in calculating quantities of components needed. Level 0 level 1 level 2 level 3 A 2B 3C 2E 2F 2E 2D G D

Lead times Time required to acquire (purchase, produce, or assemble) an item. Manufactured part: lead time made of move, setup, and assembly or run times for each component. Purchased part: lead time made of difference between when part is ordered and when it is received.

Time-phased product structure. Lead times A 1 wk. B 2 C 1 D 1 E 2 F 3 G 2 Rotate BOM below and reflect lead times with time as the X axis. A 2B 3C 2E 2F 2E 2D G D

Time-phased product structure. Rotate BOM below and reflect lead times with time as the X axis. 8 7 6 5 4 3 2 1 0 2D 2B Lead times A 1 wk. B 2 C 1 D 1 E 2 F 3 G 2 2E G A 2F D 3C 2E

Gross Material Requirements Assume we need 50 “Blast ‘em, dude” speaker kits in eight weeks. We need to calculate when and how many of each component we need to start making. (go to Excel).

Lot sizing lot-for-lot (L4L): order exactly the amount you want. Lot req. sized: order in certain amounts (ex. a dozen eggs).

Scheduled Receipts Units (of any component) that you have already scheduled to come in at a particular time.

On-Hand Inventory Units (of any component) that you already have in stock (at the beginning).

Gross Req. vs. Net Req. Gross required is the total amount of a component you need. Net required is (Gross) - (On-hand inventory) - (Scheduled receipts)

Planned Order Receipts What you PLAN to RECEIVE what you ORDERED. What you PLAN to RELEASE in an ORDER. Planned Order Releases