Diamond Diamond is the new UK Synchrotron Light Source

Slides:



Advertisements
Similar presentations
RTEMS and Linux at the Canadian Light Source Tony Wilson Canadian Light Source University of Saskatchewan.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SPEAR 3 Upgrade SSRL/SLAC January 2001  Computer Control System  Beam Monitoring and Feedback Systems  Timing System  Machine Protection Systems 
Single Board Computers and Industrial PC Hardware at the CLS
AS Diagnostic Collaboration Mark Boland
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
Daresbury Laboratory Mark Heron Overview of DIAMOND to the European EPICS Meeting at PSI May 2001 Overview of DIAMOND to the European EPICS Meeting at.
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Diamond and the UK new light source Chris Christou, X-band workshop, Cockcroft Institute, 1 st December 2008.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
Operation Status of the RF Systems and Taiwan Photon Source
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
Report Technical Director Storage-Ring-Installation Completed
PETRA III, Status and Upgrade
SESAME Control System Status
Status of HESR 18th March Gießen Dieter Prasuhn.
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Orbit Control For Diamond Light Source
PLC-based control systems at SOLEIL - ICALEPCS 2017
Snr Power Supply Engineer
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Advanced Research Electron Accelerator Laboratory
Status of the ASTRID2 RF systems
ThomX – Commissioning Meeting – 25/01/2018
LCLS Control System Personnel Linac & BC2 Controls progress
SNS-PPU upgrades the existing accelerator structure
MEIC Alternative Design Part V
Presentation transcript:

Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Diamond Diamond is the new UK Synchrotron Light Source Located at the Rutherford Appleton Laboratory (RAL) Oxfordshire Due online early 2007 Electron Beam Energy 3 GeV Storage ring circumference 561.6 m Number of cells 24 Straight section lengths 6 x 8 m ( 4x ID, RF & Injection) 18 x 5 m Beam current 300 mA(500 mA) Emittance (hor., vert.) 2.7, 0.03 nm rad Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Programme Plan Linac Issue tender Oct. 14th ‘02 Place order Dec. 13th ‘02 Install Aug. ‘04 - Apr. ‘05 Commission with beam May. ‘05 – Jul. ‘05 Booster Tender for main components Feb. ‘03 Order main components Jun ‘03 Install Aug. ‘04 – Aug. ‘05 Commission with beam Sep. ‘05 - Dec. ‘06 Storage Ring Start to order main components May. ‘03 Girder assembly Aug. ‘04 - Jul. ‘05 Girder installation Nov. ‘04 - Nov. ‘05 Plant commissioning Dec. ‘04 - Dec. ‘05 Commission with beam, no IDs Jan. - Mar. ’06 Install IDs Apr. ’06 Commission with IDs and FE May – Jul. ‘06 Beamlines Install beamlines Jan. ‘05 - Aug. ‘06 Commission with beam Aug. ‘06 - Dec. ‘06 Diamond facility Start of operations 8th Jan. 2007 Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Diamond Accelerators Linear accelerator (Linac) : 100 MeV energy Booster synchrotron : 100 MeV - 3 GeV 158 m in circumference Storage Ring : 3 GeV energy 562 m in circumference Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Location on the RAL site, Oxfordshire Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Diamond Building Concepts Courtesy of Crispin Wride Architectural Design Studio, JacobsGibb Ltd. Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Diamond Building Detail Courtesy of Crispin Wride Architectural Design Studio, JacobsGibb Ltd. Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Picture Courtesy of Angelos Gonias Diamond Site June 2003 Picture Courtesy of Angelos Gonias Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Linac ‘Turn-key’ contract for 100 MeV Linac with Accel Gmb Includes installation and commissioning to a performance spec. EPICS Controls, subcontracted DLS supplies vacuum, and diagnostic equipment. Progress Contract placed: Dec 02 Design Review: May 03 Installation starts: Sept 04 Services available: Dec 04 Final acceptance: June 05 Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Booster 22 Cell FODO lattice with 36 dipole magnets Missing dipole straights used for injection, extraction, RF and diagnostics 3Hz or 5Hz repetition rate Current Call for Tender for Magnet and vacuum assembly units Separate procurement of other components Installation and assembly by DLS Control system by DLS Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Storage Ring 24 Cells Double Bend Achromat 72 Girders for Lattice 48 Dipoles (1 circuit ), 240 quads, 168 Sext 696 Steerers 168 BPMS 384 Ion pumps, 196 Vac Gauges 21 straights for IDs, 3 Straights for Injection, RF and Diagnostics Calls for Tender RF Cavities, Amplifiers, Girders, Vessels Contract placed for Quads Installation and assembly by DLS Control system by DLS Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Control Instrumentation Areas (CIA) CIA per Cell CIAs house instrumentation racks in a clean temperature controlled environment IOCs for each technical area Quad/Sext PSUs, Steerer PSUs, BPMS, Vacuum, MPS, Girder Alignment, 2x Front Ends, 2x IDs, PSS Design once, build 24 CIAs linked to MCR using FOs 2x Computer networks, Timing signals, Reflective memory, MPS, Video and Point to Point Analogues Minimise Copper connections CIA to CIA Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

SR RF System 2 SC RF cavities for Day 1 (7 IDs and 300 mA) 3rd cavity being designed in Independent RF systems (IOTs/klystron) Single cryo-plant Calls for Tender issued for cavities and amplifiers Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Beamlines Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Proposed Beamline Layout Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Control System Architecture Based on EPICS using Two Layer Model Primary interface to CS through VME IOCs Use VME64x, IP carriers, IP Modules and transition board for rear connection Hot Swap capability Will use PLCs to manage interlocks for protection Avoids Watch Dogs on IOCs and allow warm reboot of IOCs AB Control Logix PLCs for low end applications, eg Vac Valve control Siemens S7/300 and S7/400 for high end applications, eg Linac and Cryoplant Serial Interface to Instrumentation Potentially several thousand Serial support through Stream Device and ORNL Serial Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Hardware Development Consoles IOCs Linux for Development Running EPICS 3.13.4 will move to 3.14.x Consoles PCs running Linux Will support Win2000 IOCs VME64x PPC Processor boards Select processor Autumn 2003 Will use IP carrier and modules Primarily 7 slot crates Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Recent Developments Standardised on SLS PSU controller for 1300 PSUs Full digital regulation CS Interface through high speed point to point link Development of APS/SLS Event System with SLS and Micro Research Move to 2.5Gbit transmission, reduce jitter, enable distribution of RF clock and recovery using VCO Development of Application Development Environment Define processes and sequences of building applications Local development on Linux PCs, CVS for revision control and server for final check out to operations Need to integrate upload to RDB seamlessly Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Further CS Developments are Presented Personnel Safety System Martin Wilson Vacuum Controls Steve Singleton Control System for a Helical Undulator Pete Owens Relational Database Design Vijayan Krishnamurthy Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03

Progress Report on the DIAMOND Light Source to the EPICS Meeting DLS June 03