The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Update of Control System Plans for the TPS C. Y. Wu, C.H. Kuo, Jenny Chen,

Slides:



Advertisements
Similar presentations
RTEMS and Linux at the Canadian Light Source Tony Wilson Canadian Light Source University of Saskatchewan.
Advertisements

Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
SPEAR Upgrade – EPICS Status
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011 Status of the TPS Control System Kuo-Tung Hsu On-behalf of the TPS Control Team NSRRC, Hsinchu, Taiwan.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Mar. 12, 2008 Li, Chuan: NSRL Control System NSRL 1 NSRL Control System Presented by Li, Chuan National Synchrotron Radiation Laboratory.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
OPC Overview OPC Device Support (PLC Gateway for 3.14) Ralph Lange – EPICS Collaboration Meeting at SLAC, April 2005.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
1 EPICS Collaboration Meeting Fall Status of TPS Control System Yung-Sen Cheng Instrumentation and Control Group NSRRC, Hsinchu, Taiwan.
EPICS 2008 Meeting, Shanghai, March 12-14, 2008 Status of the TPS Control System Kuo-Tung Hsu NSRRC, Hsinchu, Taiwan.
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Development of EPICS Embedded Image Processing System Takashi Obina, Jun-ichi Odagiri, Ryota Takai KEK, Accelerator Laboratory.
Power Supply Controller Architecture
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
Ralph Lange: OPC Gateway (Device Support) OPC Gateway (Device Support) Ralph Lange – EPICS Collaboration Meeting March SSRF.
Status of the control system of Alba Introduction The construction of ALBA, the 3 GeV Synchrotron Light Source near Barcelona (Spain) is proceeding according.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011 Pei-Chen Chiu On-behalf of the TPS Feedback Team NSRRC, Hsinchu, Taiwan Power Supply Control Interface.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 EPICS IOC Embedded on PLC for TPS Pulse Magnet Power Supply Control Chun-Yi Wu TPS Control.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Fast Fault Finder A Machine Protection Component.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
February 2010 ALBA Synchrotron Light Source Francis Perez.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
The recent history and current state of the linac control system Tom Himel Dec 1,
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
MicroTCA Development and Status
SESAME Control System Status
Status of the ASTRID2 facility
Current Status of IPM-Linac Control System
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
SESAME Control System Status
Coupling Correction at the Australian Synchrotron
Reliability of the Taiwan Photon Source
Electronics requirements for special diagnostics for the XFEL
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Update of Control System Plans for the TPS C. Y. Wu, C.H. Kuo, Jenny Chen, C.J. Wang, P.C. Chiu, K.H. Wu, Y.S. Cheng, K.T. Hsu Reported by Chun-Yi Wu TPS Control Team NSRRC, Hsinchu, Taiwan

2 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Outline  Overview of TPS project  Hardware selection of TPS  Interface standard  Some subsystems control interface  Software environment  Summary

3 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Taiwan Photon Source Project Storage Ring Booster User ADM Center Utility-III, Guest TPS Storage Ring & Booster Synchrotron TLS Storage RingTLS Booster Synchrotron TPS Parameters Scheduled commissioning start in late 2013 Most probably ground breaking: late 2009~ H2-new Circumference C (m)518.4 Energy E (GeV)3.0 Natural emittance ε x0 (nm-rad)1.6 Revolution period (ns) Revolution frequency (kHz) Radiofrequency (MHz) Harmonic number h864 SR loss per turn (dipole) (MeV) Betatron tune ν x /ν y /13.28 Momentum compaction (α 1, α 2 )2.4×10 -4, 2.1×10 -3 Natural energy spread σ E 8.86×10 -4 Damping partition J x /J y /J s /1.0/ Damping time τ x /τ y /τ s (ms)12.20/ / 6.08 Natural chromaticity ξ x /ξ y -75 / -26 Dipole bending radius ρ(m)

4 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Technical Selection for the TPS Control System  Control system framework => EPICS toolkit.  Commitment to the funding agency and budget consideration : Acquire as many of parts from local vendors as possible => Adopt cPCI/PXI, AdvancedTCA, and other embedded solutions for IOC layer.  Borrow available resources from other labs.  Goals of 2009: Refine control system planning and design. EPICS IOC test bed. Timing testbed: MRF’s cPCI EVR/EVR solution Simemns S7/300 PLC testbed: turnkey from EU (Siemens or VIPA) Yokogawa M3R PLC testbed with embedded EPICS IOC Prototype OPI Database planning Work out on EPICS driver/devices support for selected hardware Cultivate EPICS peoples.

5 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 TPS Control System Infrastructure PC/Linux Control Ethernet Consoles and Servers Hard IOCs - cPCI, aTCA IOCs - Intel CPU/Linux (fully preemptive kernel ) - Hard real-time - High volume I/O - High speed serial connection (GbE, … etc.) cPCI IOC Soft IOCs - Pentium/XScale/ARM/IXP/IOP Linux - Soft real-time system - GPIB/IEEE-488 Instruments - RS-232/422/485 Devices - CCD camera server - PLC (safety type system) - Bunch-by-bunch feedback system interface - Special applications DB Server, Beam Physics Server, Alarm Server, AP Server, … etc. Storage Server IOC (Input Output Controller) aTCA IOC Signal Conditioning Soft IOC Safety Type System Router Intranet Network attached EPICS Devices (e.g. EPICS oscilloscope, … etc.) PLC-IOC

6 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Candidates of EPICS IOC - Hardware Building Blocks ACQ IOC (Linux) Intel IOP + ADC, DAC 128 Bits DI/DO cPCI CPU board CompactPCI IOC (Linux) aTCA IOC (Linux) BI, BO, AI, AO Network attached devices BI, BO, AI, AO, Timing, Network attached devices Compute Blade Switch Blade Carrier Blade PLC Embedded EPICS IOC EVGEVR ADC/DAC + Power Supply Controller Scope IOC ( bits) CompactRIO EPICS IOC Libera IOC (Intel XScale. Linux) Adapter (in study)

7 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Interface Standard  cPCI I/O modules  32/64 channel 24 bits ADC (with transient signal capture capability, D-tACQ))  16/32 channel 18 bits DAC (D-tACQ)  128 bit DI, 128 bit DO (ADlink)  EVG, EVR (cPCI & PMC form factor, MRF)  In house designed electrical/optical fanout, patch panels  aTCA crates system  Network attached devices  Fast feedback  Main power supply control interface  GbE interface, waveform support for the booster synchrotron main power supply  Small power supply control interface  Analogue interface  Support feedback interface  Booster energy ramping support (optional)  Timing  Event system based upon cPCI EVG/EVR

8 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Interface Standard – cont.  Fast waveform capture  Scope IOC  Camera  GigE Vision  Ethernet and LXI Compliant devices  Power supply  Diagnostics  Electronics instruments, DMM, temperature monitor,..  Motion control  Ethernet based motion controller  Interlock  PLC with embedded EPICS IOC  RS-232C/422/485 devices  Ethernet to RS-232/422/482 serial device servers or IOC  Software  EPICS toolkits  Miscellaneous Interface …

9 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Power Supply Control Interface  Large (Digital regulator)  Ethernet interface  ENOB > 18 bits  Communication protocol is still pending  Medium power supply  Ethernet interface  ENOB > 18 bits  Communication protocol is still pending  Booster synchrotron large and medium power supply  Ethernet interface with waveform capability  Small power supply (analogue power supply)  Analog interface (18 or 24 bits bits)  cPCI 18 bits DAC (D-TACQ ?)

10 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Turnkey System Interface  Many of turnkey systems compliant with EPICS based controls.  Possible turnkey systems included:  Linac (contracted out in December 2008)  RF transmitter (2 sets contracted out in December 2008)  Outsource insertion devices  Monochromator and other beamline components  ………. etc.  Possible turnkey EPICS devices included:  BPM electronics, Scope IOC, Motion control solution, …  Minimize workload of integration and maintenance  Standard components should be chosen to get consistency of hardware  Provide EPICS development environment and documentation  Follow TPS PV name convention

11 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Linac System Control Environment TPS Control Network Diagnostic IOCs (Transient Digitizer, GigE Vision Camera,… etc.) EPICS OPI TPS Control Environment Modulator #1 Linac Control Ethernet Switch Modulator #2Gun Local Controller (PLC,..etc.) Power Supply Vacuum Interlock,…etc. Local Controller (PLC,..etc.) Local Controller (PLC,..etc.) Local Controller (PLC,..etc.) Linac RF, Diagnostic, …etc Linac Timing Box Scope IOCs Timing Network Event Receiver cPCI CPU board Fine delay + Fanout (Electrical, Optical) + + Linac Timing IOC (Linux) cPCI IOC + Trigger Signal Gun grid pulser, Klystron Current/ Voltage, RF, Faraday Cup, Current Transformer, … etc. ACCEL’s EPICS Soft-IOC Gun Trigger Optical Fiber Local Control Panel Local Controller (PLC,..etc.) Local Controller (PLC,..etc.) Modulator #3 Local Controller (PLC,..etc.) Rf

12 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Booster Synchrotron Control Environment Booster Correctors for one Cell Power Supply Crate Hor: 10 sets Vert: 6 sets (waveform capability) EPICS IOC ADLINK cPCI CPU ADLINK 128 Bits DI/DO TEWS TCP201 IP Carrier Hytec IP DAC 16 bits, 16 channes IP-DAC-8404 Control Network Hytec IP ADC 16 bits, 16 channels IP-ADC cPCI crates for the TPS booster synchrotron, One cPCI for one period of the booster lattice Booster Repetition Rate: 3 Hz Miscellaneous Control (Vacuum, ambient parameters, …) Trigger Remote I/O solution: MODBUS/TCP Galil RIO Pocket PLCs register mode or waveform mode Dipole PS Interlock PLC IOC QF PS Q1 PS Q2 PS QM PS Ethernet Switch Protocol: MODBUS/TCP or ?

13 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Miscellaneous System Interface  Vacuum system  BI, BO, AI, AO, serial links,..etc.  Diagnostics  BPM electronics: Ethernet.  BI, BO, AI, AO, counter  Machine protection  Dedicated PLC system with fast link  Ethernet to control system.  Personnel protection  Dedicated PLC system with fast link  Ethernet to control system.  Feedback system interface  …

14 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Post-mortem Diagnostic Supports  BPM electronics:  Post-mortem buffer (turn-by-turn)  Dedicated fast data capture nodes to capture for more than 5 seconds at 10 kHz rate.  cPCI ADC module with post-mortem buffer:  Up to 10  sec time resolution for more than 5 seconds.  Transient and waveform diagnostic:  High timing resolution (~ nsec) with segmented sweep  multiple-trigger capability  Beam trip trigger is planned to distribute via event system.

15 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 Software Environment  Control system framework:  EPICS toolkits  High level physics applications:  Matlab/Accelerator Toolkit/Matlab Middle Layer  Setup virtual accelerator to support high level application development is underway  Many items are still in study  Relation database  Technical system interface  Documentation, E-log  Machine status broadcasting: web, IPTV  …etc.

16 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 High Level Applications Interface High Level Matlab Applications (scripts and functions) Matlab Middle Layer Accelerator Toolbox (AT) (Model) Matlab to EPICS (LabCA) Channel Access to Accelerator Hardware MML switch2hw switch2physics AT VA EPICS IOC Lattice File EPICS Client Virtual TPS Storage Ring IOC Dipole QuadSext.Corr.BPM RF EPICS Process Database Dipole Quad Sext.Corr. BPM RF EPICS Process Database Thanks help form G. Rhem and J. Roland (DLS), G. Portmann (ALS)

17 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009  To enable early testing of applications through the control system, a virtual accelerator has been implemented to give simulation of the accelerators though the intended EPICS PV interface. Prototype was set up by the help from DLS.  Current version is AT/MML version.  Virtual booster and linac are also possible near future!  Many facility have such kinds activities: SNS, KEK, J-PARC, DLS, … many others! Virtual Accelerator for Applications Development and Training TPS Storage Ring (Lattice designed by BD Group) Virtual TPS Storage Ring

18 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 EPICS Practices at the TLS SA Ethernet Switch TPS Control System Development Network Gateway ILC10 to TLS ILC database TLS Control Network xx ILC Data Acq Node #1 Hor FOFB Corrector Control RM Network ILC12 VME RM Slow Corrector Control Node EPICS OPIs and Clients R1 BPM (10)R2 BPM (10)R3 BPM (11)R4 BPM (10)R5 BPM (10)R6 BPM (8) Diagnostic Node Control Console Vert FOFB Corrector Control Libera Brilliance X 59 EPICS broadcast xx (Multi-Gigabit Link) CSPI Interface Router Matlab LabCA GigE Link Superconducting IDs post-mortem digitizer (EPICS) iGP EPICS interface +

19 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009  Cultivate EPICS peoples.  Define standard hardware, work out on EPICS Device/driver supports.  Define software standard (EPICS toolkit).  Planning for various issues (name convention, networking, …).  Setup testbed in 2009: Training system BPM system for TLS (gateway to TLS control system) Transient and waveform IOC Scope IOC GigE vision supports Various EPICS clients applications RDBMS OPI  Work out a solid plans for the TPS control system: Procurement schdeule Development schedule Priority Limited budget, limited manpower, … Works in Proceed

20 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009 EVG Configuration EDM page EVR Configuration EDM page cPCI IOC DAC Waveform Supports EPICS Oscilloscope EDM page Works in Proceed

21 The Spring 2009 EPICS Meeting, Vancouver, B.C., Canada, April 30-May 2, 2009  The design of the TPS control system is on going.  All major components for control system are in intensive study.  Standardization hardware and software are the current focus.  EPICS toolkit training - a series training activities will be arranged.  Set up EPICS test-bed  Single kind of operating system solution for IOCs and consoles are preferred => Linux.  Economic design without scarify performances and reliability are the goals.  Select possible outsourcing items  Learn experiences from other labs Summary Thank you for helps from EPICS community!