ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
First Results from the ERL Prototype (ALICE) at Daresbury David Holder, on behalf of the ALICE team. LINAC'08 Victoria, BC.
Advertisements

ERLP / ALICE: a bit of history Yuri Saveliev. ... how all this started SRS DIAMOND ERLP 4GLS... to greener pastures.... Oh yes ! We get there Hmmmm.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Modelling of the ALICE Injector Julian McKenzie ASTeC STFC Daresbury Laboratory IOP Particle Accelerators and Beams Group Status and Challenges of Simulation.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
Low Emittance RF Gun Developments for PAL-XFEL
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Lee Jones Accelerator Physics Group ASTeC STFC Daresbury Laboratory
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
1 ALICE and EMMA Yuri Saveliev … and many others at DL and beyond ASTeC, STFC Daresbury Laboratory IOP Particle Accelerators and Beams Annual Conference.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Christopher Gerth DL/RAL Joint Workshop 28-29/4/04 Modelling of the ERLP injector system Christopher Gerth ASTeC, Daresbury Laboratory.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
Photocathode based Electron Sources for Particle Accelerators – Yesterday, Today and Tomorrow B.L. Militsyn STFC ASTeC, UK European Workshop on Photocathodes.
MAX IV linac overview and scope of automation Sara Thorin.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Photo injector dark current at FLASH and efforts for reduction at FLASH and XFEL Svem Lederer Unwanted Beam Workshop 2012 Berlin, Dec 18, 2012.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
Development of High Brightness Electron Photoinjectors at ASTeC B.L. Militsyn Accelerator Science and Technology Centre Science & Technology Facility Council,
An Electron source for PERLE
ALICE Commissioning Successes
Phil Oxford , june 18 Photoinjector at.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
UK-XFEL WP1 – Electron Injector Development
E-XFEL Status and First Beam Results
Plans of XFELO in Future ERL Facilities
Status of the CLIC main beam injectors
Tango status at Elettra
WP11: electron and proton beam testing
DC Injector and Space Charge Simulation Status
Joint Accelerator Research JGU & HZB
MIT Compact X-ray Source
ERL Main-Linac Cryomodule
LCLS Commissioning Parameters
ERL accelerator review. Parameters for a Compton source
CEPC Injector Damping Ring
Advanced Research Electron Accelerator Laboratory
Jim Clarke ASTeC Daresbury Laboratory March 2006
Compact linear accelerator FLUTE: status update
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Presentation transcript:

ERLP Overview Hywel Owen ASTeC Daresbury Laboratory

Light Source Hierarchy First generation - parasitic SR beamlines on high-energy physics accelerators; e.g. the SRF on NINA. Second generation - dedicated particle accelerators providing synchrotron radiation from bending (dipole) magnets. Third generation - dedicated particle accelerators providing synchrotron radiation from special magnets (insertion devices) placed between the dipole magnets. Fourth generation - FEL-based (could be linac, storage ring)

The Solution - a Linac-Based Light Source Linac can deliver a very high quality electron beam (now) Electrons are required only once then dumped. Temporal pulse pattern flexibility. Features: High average brightness gun. Normal or superconducting linear accelerator. One or more FELs. Energy Recovery required for economy (55 MW power in 4GLS CW branch).

ERLP - A Prototype Accelerator for 4GLS EMMA For more information, and Conceptual Report, See

electrons anode ERLP DC Electron Gun Electrons XHV Ceramic Cathode SF6 Vessel removed Cathode ball Stem laser Anode Plate

Text Glassman PK500N008GD5 Voltage-500 kV Current8 mA Cockcroft-Walton based multiplier Delivered December 2003 Gun Power Supply

Superconducting Modules Delivery April/July 2006 JLab HOM coupler design adopted for the LINAC module 2 x Stanford/Rossendorf cryomodules – 1 Booster and 1 Main LINAC. Booster module: 4 MV/m gradient 32 kW RF power Main LINAC module: 14 MV/m gradient 16 kW RF power

ERLP Cavity Test Results Booster Cavity1Linac Cavity1 Booster Cavity2Linac Cavity2 Specification of > 15MV/m at Q o > 5 x 10 9 Goal

ERLP as an Injector for EMMA 2 x 1.3 GHz Superconducting Modules

ERLP Parameters ParameterValue Nominal Gun Energy350 keV Max. Booster Volts8 MV TL 2 Energy8.33 MeV Max. Linac Volts26.67 MV Max. Energy35 MeV Linac RF Frequency1.300 GHz (+/- 1 MHz) Bunch Repetition Rate81.25 MHz Bunch Spacing12.3 ns Max Bunch Charge80 pC (risk variable) Particles per Bunch5 x 10 8 Bunches per Extraction Energy10 to 20 MeV (need to check lower limit) Extraction Emittance5-20 mm mrad (various issues)

ERLP Operating as an Injector for EMMA 8.00 MV (2x4 MV) (standard) 8.35 MeV (standard) 0.35 MeV (fixed) MeV (variable) MV (variable) Later we will need to consider adapted injector (post-4GLS construction)

Bunch Shapes in ERLP (B.Muratori presentation) Sextupoles also needed in return arc Optimise energy spread after deceleration Allow clean extraction of beam to dump

ERLP Laser Paths – Injector, FEL, THz, EO

ERLP Photoinjector and Laser LASER ROOM ACCELERATOR HALL Shield wall Optical Table DC Gun Based on Jlab design Commercial 500kV (350kV) 8mA DC Power Supply (Glassman Europe) Power supply and gun enveloped by 0.8 Bar SF6 environment Booster Cavity Laser Beam Transport System

ERLP Laser Pulse Output Characteristics Cathode materialCs:GaAs Electron bunch charge80 pC Bunch length20 ps Bunch repetition rate81.25 MHz Pulse train length 1 bunch and  s Pulse train repetition rateSingle shot and 1-20 Hz Cathode efficiency1 %1 % Laser wavelength532 nm Laser pulse energy at cathode20 nJ Average power at cathode<4 mW Pulse length<20 ps Beam diameter at cathode2-6 mm (FWHM) Nd:VanadateLaser material MHz Pulse repetition rate - - Cw mode-locked Pulse train rep. rate / 532 nm Laser wavelength 61.5 nJ 532nm output energy per pulse 5 W Average power 7 ps Pulse length (FWHM) 0.6 mm Beam diameter output The commercial solutionRequirements

ERLP Laser

Injection and Extraction Timing Structure Standard ERLP injector 12.3 ns bunch spacing Up to ~160 pC per bunch Up to 2 bunches Total charge <0.32 nC Spec is 1 bunch, 80 pC Pulse-stacking (adapted injector) Down to 0.77 ns spacing Up to ~80 pC per bunch Up to 18 bunches Total charge? Costs more! Revolution time 55 ns (16.5 m) rise time fall time Injection flat-top time (top is not really flat) 12.3 ns (81.25 MHz) ~15 ns ~20 ns Revolution time 55 ns (16.5 m) 0.77 ns (1.3 GHz) max. 18 bunches RF frequency in injector can be changed by ~1 MHz – not enough! ~20 ns rise time fall time Injection flat-top time ~15 ns ~20 ns

Faro Laser Tracker Repeatability 1  m +1  m /m Accuracy 10  m  m /m Uncertainty ≈ 10  m /m Portable Robust Spatial Analyzer Metrology Software Error Simulations Multiple instruments/types Automation ERLP and EMMA Survey – see talk by John Strachan

Simulation of reference grid in SA 76 Grid reference points 40 Instrument positions Each point measured by a minimum of 3 instrument locations Faro Tracker Grid reference points ERLP Hall Survey and Alignment

Installation Progress Photoinjector laser operating since April ’06 Gun installed with a dedicated gun diagnostic beamline Both superconducting modules delivered from Accel Cryosystem installed and used to cool accelerating modules down to 2K All beam transport modules now installed – one area under vacuum Most hardware components now installed

Performance Achieved So Far Gun operating voltage 350 kV (spec value) Output bunch charge 5 pC (target 80 pC) Cathode quantum efficiency In gun: 0.4% In the lab: 3.5% (spec is ~few percent) Bunch train length 100 µs (spec value) Train repetition rate 20 Hz (spec value) ParameterValue Nominal Gun Energy350 keV Max. Booster Volts8 MV TL 2 Energy8.33 MeV Max. Linac Volts26.67 MV Max. Energy35 MeV Linac RF Frequency1.300 GHz Bunch Repetition Rate81.25 MHz Bunch Spacing12.3 ns Max Bunch Charge80 pC Particles per Bunch5 x 10^8 Bunches per Extraction Energy10 to 20 MeV Extraction Emittance5-20 mm mrad 350 keV Test line screen

Ongoing Work Cleaning and re-assembly of the gun Understanding and testing the cryogenic system Installation and testing of all RF systems Commissioning of the booster and linac modules BTS Installation/Commissioning Laser room modification to accept the terawatt laser

2007 Schedule Gun & diag line studies finished3 rd April Re-configure booster 16 th April Full BTS Pumpdown25 th April RF Systems ready25 th May Beam through Module 1 (8.35 MeV) June Beam through Module 2 (35 MeV) June onwards Energy recovery demonstrated October Install wiggler Energy recovery from FEL-disrupted beam Produce output from the FEL