Blasting Economics ©Dr. B. C. Paul 2009 Note – The example contained in these slides was prepared by the author for use in the courses he instructs. It.

Slides:



Advertisements
Similar presentations
Take Charge of Your Finances Course Introduction Trivia “Take Charge of Your Finances” Advanced Level.
Advertisements

Construction Engineering 221 Cost Estimating and Bidding II.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 2 Fundamental Concepts of Equipment Economics.
Front End Loader Costs ©Dr. B. C. Paul 2000 Start Detailed Economic Comparison of 3 machines l Strategy Go Through Each Machine and Figure the Cost Compare.
ANALYZING YOUR ROUTE Daniel S.Gordon, CPA OPTIMIZATION EFFORTS.
Job choices.
09 Payroll Accounting. It's a fact of business–if a company has employees, it has to account for payroll and fringe benefits.
Chapter 8 Income and Taxes.
10 Current Liabilities and Payroll Liabilities that are to be paid out of current assets and are due within a short time, usually within one year,
Appendix on Payroll Accounting
Cash Flow Problems are 5 Types Invest and Earn –solve with NPV, maybe IRR or tweeked IRR or ERR All Cost Investment Alternatives –develop cash flows for.
Factored Cost Estimates (With Inflation Indexing) ©2002 Dr. Bradley C Paul.
Controlling Labor Costs
Financial Projections (1) – Assumptions and Cash Flow MHR 308 Summer 2002.
Chapter 11 Payroll Liabilities
Blasting Fundamentals ©Dr. B. C. Paul 2000 Note – The slides that follow present the author’s summary of knowledge commonly held by people well studied.
Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008, 2009 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Tire Heating – The TMPH Rating ©Dr. B. C. Paul 2000 revised 2008 Note- These slides demonstrate the use of the FPC computer program developed by the Caterpillar.
My New Obligations 1. Decision to Hire an employee (s) has been made Is this THE right time to hire?  Why … what is the benefit:  More sales  Less.
EM15 – Contractors COST MANAGEMENT
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
Business Math Assignment Press F5 to begin to playing this slide show.
Decision Making in Finance: Future Value of an Investment
Time & Labor & Absence Management Entering Time Worked Classified Employee Timesheet.
Loading Considerations © 2000 Dr. B. C. Paul revisions 2009 Note These slides include screen shots from the Caterpillar Performance Manual Edition 29.
Business Accounting Chapter 12. Importance of Payroll Records Required by law – keep accurate payroll records – report employee earnings – pay payroll.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Step 5 Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Click to begin Click to begin Mr. Thomas Chapter 12.
OH 9-1 Controlling Labor and Other Costs 9 OH 9-1.
Click here to advance to the next slide.
Compound Interest ©Dr. B. C. Paul 2001 revisions 2008, 2011 Note – The subject covered in these slides is considered to be “common knowledge” to those.
 Financial snapshot of what company owns and owes at any point in time  Start-ups usually project for opening day and at the end of the first year 
Equipment Costing: What You Don’t Track Can Hurt You (The Devil is in the Details)
Financial Accounting. What accounting is Monetary unit & economic entity assumptions Uses and users of accounting The accounting equation Ethics as a.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
Compound Interest ©Dr. B. C. Paul 2001 revisions 2008 Note – The subject covered in these slides is considered to be “common knowledge” to those familiar.
How Do I Purchase Mutual Funds? Investment and Finance 12 Ms. Stewart.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
I2B1 – Final Units 1,8,9, 10,11,12 You are responsible for YOU.
Title 5 Emissions Quantification © Dr. B. C. Paul.
Steps in Fleet Selection ©Dr. B. C. Paul 2000, revised 2008 Note- General steps and methodologies found in these slides roughly follow material found.
Feasibility Study Cost Estimates ©2002 Dr. Bradley C Paul.
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
4.01 FORMS OF COMPENSATION / PAY. MONETARY COMPENSATION Wage - The amount of money paid for a specified quantity of labor. Salary - A set amount of money.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Cable Shovel Costs ©Dr. B. C. Paul 2000 Do the Cable Shovel l Have a 12 yard P+H Examine Cable Shovel Cycle Time Chart Predicted 26 seconds.
Basic Blasting Patterns ©Dr. B. C. Paul 2000 Note – The concepts contained in these slides represent the author’s view of information commonly held among.
THE COST OF MANUFACTURING How much does manufacturing cost?
Entrepreneurship Business Plan Utilizing Financial Documents.
 Explain what it means to budget, and identify reasons to maintain a budget.  Create and maintain a budget that supports personal and financial goals.
LESSONS ENTREPRENEURSHIP: Ideas in Action© SOUTH-WESTERN PUBLISHING Chapter 10 HIRE AND MANAGE A STAFF Hire Employees Create a Compensation.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
CHAPTER 12 FINANCIAL MANAGEMENT Financial Planning FINANCIAL PLANNING Ongoing Operations Revenue – all income that a business receives over a period.
Payroll Unit Terms Write down as many payroll terms or payroll taxes that you can think of in 2 minutes. Ready, Set, Go!
Chapter Saving 2. Commercial Bank 3. Savings Bank 4. Credit Union 5. Savings Account 6. Certificate of Deposit 7. Money Market Account 8. Annual.
GLENCOE / McGraw-Hill. Payroll Taxes, Deposits, and Reports.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Personal Finance Employee Pay & Benefits Chapter Six Notes.
Lesson 1: Reading a Pay Stub. Objectives: Identify sections of a pay stub Determine how to calculate net pay Recognize various paycheck deductions.
My Paycheck Chapter 3. Types of Income Earned Income – Money received from working. Six types: wages, tips, salaries, bonuses, commissions, royalties,
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
DEFINED BENEFIT VS DEFINED CONTRIBUTION.
2 Job Order Costing Learning Objectives
Cost of benefits to an employer
Presentation transcript:

Blasting Economics ©Dr. B. C. Paul 2009 Note – The example contained in these slides was prepared by the author for use in the courses he instructs. It represents ideas and concepts believed by the author to be commonly understood by those well studied in the subject. Cost figures were taken from a variety of published and unpublished discussion sources, though contributions from Western Mine Cost Service and the U.S. Bureau of Mines are specifically recognized.

We Will Utilize A Standard Blast Design Cost Calculation Spreadsheet The Spreadsheet will consider –The Ownership Cost of Your Drills –The Operating Cost of Your Drills –The Labor Cost for Drill Operations –The Ownership Cost of Explosives Trucks –The Explosives Supplies Cost –The Explosives Labor Cost –Management and Engineering Support Cost –Penalty Costs Wear and Tear Secondary Breakage Pit evacuations for Blasting

Why A Spreadsheet? Cost Estimating Calculations are generally simple math Just a tedious matter of estimating each thing and adding up totals –Spreadsheet avoids calculation errors and differences in assumptions

The Basic Input Pick your drill type Use the table to enter your drill penetration Rate.

Get Other Parameters from your Have a Blast Spreadsheet

Plug Into Sheet

First Task Is To Get Ownership Cost of Drill Approach –Figure out how much time it will take to drill the holes each year –Figure out how many drills you need and how many hours they will work –Figure out how long the drill will last –Now you have Capital Cost for drills and the life of the drills you can get an annual cost to own the drills

Our Spreadsheet Here is the bottom line cost per year $294,606

Deciding How Much Drill Time Number of feet drilled –Required tonnage * specific drilling (specific drilling is ft of drilling per ton) Number of Holes Drilled –Number feet drilled / length of a hole You know how long it takes to set up to drill a hole You know how long it takes to drill a foot of hole Add the two and you have the drilling time needed (We had the time for each type of drill to set up Over 1 hole) (We know how many feet of hole the drill can go An hour when it is drilling)

Crunching Toward an Answer Drill crews don’t work 60 minutes an hour Drills are not in working order 100% of the time Drills are not assigned to work 100% of the time they are available Use these factors to find out how many hours you will have to plan for a drill to get what you really need Compare that to hours one drill can be available Now you know how many drills you need

And Getting There Divide up the hours between the drills needed Divide the hours of drill life by the hours worked per year to get the drill life A/P converts the capital cost of the drills into equal payments (with interest) over the life of the drill –We how have the drill Capital Cost broken down on an annual basis.

Finding Out How Many Hours and Drills With 8 months, 5 days a week and 10 hour shifts I have 1714 hours Max available on one drill.

Other Ownership Costs Taxes and Insurance –These are commonly approximated as a percentage of the value of the equipment –Most mining equipment tends to be 4 to 7% of value depending on what it is. –Problem is that the value varies with time as the asset grows old and wears out –Idea is to get the average value at the start of each tax or insurance year Industry term is average annual investment.

Spreadsheet Gets Taxes as a Function of Average Annual Investment Now we have our first cost – What is the Annual Ownership Cost of the drills we must have to meet production? $294,606 per year

Drill Operations Cost Energy Cost = Fuel Units/hr * #hours worked * Cost/Energy Unit

More Drill Operating Costs Repair Cost = Cost/hr * # Hours Worked

The Stabilizer and Recorder Costs Misc Parts Cost = Stabilizer+Recorder Cost/hr * # Hours

Bit and Steel Costs Bit and Steel Cost = Cost Per Foot Drilled * # of feet of drilling

Total Up the Non-Labor Direct Drill Operating Costs

Getting Drill Labor Cost Drill crew is assumed to consist of a head driller and helper. Drill Labor Cost = (Head Driller/hr + Helper/hr) * # hours for crew

What Is Burden? In this case its not the amount of rock to blast Employer pays –Wage for hours worked –Also pay Social Security Match Workmans Comp Insurance Unemployment Insurance Health Insurance Vacation and Sick Leave Other Benefits Company Pays –Costs for employees that are not paid as a wage/hr are called Burden Commonly estimated as a % of work payroll

Getting The Capital Cost of Explosives Equipment If you are bulk loading explosives you need an Explosives Truck If using bagged explosive gels a heavy pick-up can be used If doing electric blasting need sequential blasting machine. Calculation method is the same as was used in getting capital cost Of drills.

Next You Choose Your Initiation System Electric – current passing through wire electric circuits ignite timing elements in caps that set off boosters that set off charge –Quite –Circuits can be tested from the initiation point –Delay Elements are down the hole in caps or from delayed pulses sent out to circuits from blasting machine. –Need to practice electrical design to make sure circuits are balanced –Risk – large wire loops convert Electro-Magnetic waves into electricity which could set off some of the caps

Detonating Cord Cord is filled with high explosive Shot is physically connected with cord and initiation spreads by blast propagation through the cord. Just tying the cord around a booster can set-off the booster as the cord explodes – no caps needed Delays are usually fuse sections put into the lines on the surface

Det Cord Dark Sides It is very noisy – if you burry it you could break a connection Only way to check the system is to check every connection Usually have to top prime because det cord will burn powder around it as detonation wave goes through powder Pretty much need a direct lighting strike hit to set it off accidentally.

Non-El Uses caps in booster like electric Network is connected by hollow cord with explosive on the edges –Result is a lot less noise –Won’t burn surrounding powder so you can bottom prime –Also can use air pressure to check connections from one point Put delay fused in lines on the surface or down the holes. Lines don’t generate stray electric currents from EM pulses

Choosing on the Spreadsheet Enter 1 for What Ever System you use. Indicate the Number of Booster per hole Indicate the Number of Initiation points Identify the number of surface or down hole delays used in your Pattern (needed for non-el and det cord)

Spread Sheet Calculations Boosters = #boosters/hole*# of holes*cost/booster Caps = #initiation points/hole*#holes*cost/cap (det cord systems have no caps) Delays = #of delays/pattern*#of patterns*cost/delay

Final Explosives Cost Calculations There is also a cost for connecting Wires and cords. Spreadsheet uses a % of total Cost approach to estimate Takes subtotal for powder, Caps, boosters, delays and adds A percentage for cord. It totals up everything to get the annual explosives cost.

We Need Workers to Load the Explosives and Hook-Up the Shot We know the number of holes The value of holes loaded per shift is from a number of published articles A crew is expected to consist of a Blast Supervisor and two helpers # Shifts needed = # of holes / holes per shift Cost per Shift = (Sum of Labors cost/hour)*hours per shift Labor Cost Per Year is = # Shifts needed * Cost per Shift

Engineering and Management Costs Are Estimated as a Percentage of Other Labor Costs

Spreadsheet Charges Penalties for Impact on Other Operations Secondary breakage on top of grizzly screen costs money. Take a cost/ton for Secondary breakage * tons needing breakage. (The percentage of your tonnage Needing secondary breakage comes from Havablast Spreadsheet). Note – Even if 2ndary breakage is within acceptable limits it still does not happen For free.

Excess Wear Penalty When rocks are too big it puts extra wear on trucks, bed-liners, suspensions, loader Teeth and hydraulics and other things. Spreadsheet uses D50 from the Havablast Spreadsheet and a cost per inch for excess size to estimate. (Note that you could Change values to tune a sheet like this to a specific operation).

Cost of Suspended Operations When blasting is to be done, equipment is pulled back and workers not needed for The blasting work are evacuated from the pit. Equipment not in service still has An ownership cost and workers still are paid. Even if the blast may be done in less Than 10 minutes people slowing down before the blast and then getting “in the groove” After takes time. (Note – this spreadsheet does not charge a lost production penalty)

Spreadsheet Totals the Annual Costs and Then Divides By the Annual Tons Result is the Cost Per Ton for Rock Blasting (The name of the game for your assignment #5 is to have the lowest cost And a design that still works)

Assignment #5 is now issued