Booster Main Bending Magnet Test in SM18. Why The energy upgrade of the PS Booster main bending magnet requires endurance tests at high current (≈12 kA)

Slides:



Advertisements
Similar presentations
Chapter 4 Transformer Connections
Advertisements

1. 2 LHC consolidation: tests completed in 2010 Projects completed in 2010 Test facility consolidation Where are we now? Planning Foreseen Activities.
. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
SURATGARH SUPER THERMAL POWER STATION
December, 2010 Vmax – Indoor vacuum circuit-breakers for Primary Distribution Product presentation 1VCP – Rev. D, en – Presentation –
E951 POWER SUPPLY SAFETY REVIEW 9/06/02 IOANNIS MARNERIS Brookhaven National Labs.
Electrical Power Systems
Battery Principles.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
REQD FUTURE POWER SYSTEM CHANGES  Following additional work is required to be performed to restore full capability of the machine: 1. Provide power feed.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
GENPRO Electrics & Electronics. . Switch Mode Power Supply-Output : 100A / 60 V-6KW GENPRO Electrics & Electronics.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
So… How does Smartcool achieve savings??.  Compressors use 70% of the energy in refrigeration and air conditioning systems.  The cooling cycle is dynamic.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Lesson 9: Discovering electricity. What happened?
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
Readiness of test stations for design validation Marta Bajko on behalf of the TE-MSC TF team CERN, 11 th December 2014 QXF design review, CERN.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
Cold powering test results of MBHSP102 Gerard Willering, TE-MSC-TF With thanks to Jerome and Vincent and all others from TF for their contribution.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Esbe Rotary Motorized valves The ESBE Rotary Motorized valves (mixing valves and actuators) are used to control heating and cooling in buildings. We offer.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
The power supply for magnetic elements at CR D.Senkov IWAPT 2015, BINP, Novosibirsk The power supply for magnetic elements at CR D. Senkov/
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
Control Systems: Circuitry Electricity for Refrigeration, Heating and Air Conditioning 7th Edition Chapter 16 Control Systems: Circuitry and Troubleshooting.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S A Griffiths CM42 June 2015 Electrical & Control.
CC LLRF SM18 test plan and BA6 infrastructure
ABT-EC EYETS Activities 2nd reports
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
HL-LHC IT STRING and Series test of SC link
Experience: past events and accidents
Powering the LHC Magnets
Hollow e- lens, Cryogenic aspects
SUMPNER’S TEST OF TRANSFORMERS
TE-MSC activities in SPS during YETS
3 issues identified in review
ROD assembly and test in US
TEST PLANS for HL LHC IT STRING
Batteries: the Chemistry
Magnets and Electricity
Hilumi WP3 meeting, 1 October 2014
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
November technical stop activities:
Hardware Commissioning
Review of hardware commissioning
Review Bloc 4 and SM18 facilities and upgrade
SPS Injection BIS - Draft requirements
Presentation transcript:

Booster Main Bending Magnet Test in SM18

Why The energy upgrade of the PS Booster main bending magnet requires endurance tests at high current (≈12 kA) and high ramp rates High currents and high ramp rates require powerful converters The cluster A of the SM18 test benches is actually equipped with a 14kA/61V capacity power converter that fulfills the requirements

How The magnet will be installed in-between the A1 and A2 benches, close to the platform (action: TE/MSC-TF) The main water-cooled current leads will be disconnected from A1 CFB leads (action: TE/MSC-TF)

How (2) Extra cables will be used to connect those leads to the magnet lying beneath (action: TE/MSC-MNC) Cooling water for the magnet will be drawn from the main water supply distribution of the test facility and connected to a pressure booster in order to reached the required ΔP (action: CERN water support team under request of TE/MSC-MNC) INOUT

Powering RM.A converter will be switched to 18kV mode, in order to get the required 61V/14kA capacity (action: CERN electrical support under request of TE/EPC-MPC) The usual interlocks from test benches will be removed from the converter (action: TE/EPC-MPC) The only left interlocks will be the magnet water flow and the coils temperature, connected in series and brought directly to the converter (action: TE/MSC- MNC) The regulation loop parameters will be adapted to the magnet and cables impedance (action: TE/EPC-MPC)

Current cycles control The usual power application, running on Sunmta32, will be used through the gateway (action: TE/MSC-TF) Possibility of creating any required current cycle within the limits of the PC range (action: TE/MSC- TF following TE/MSC-MNC specifications ) Usual cold benches interlocks will be shorted in order to use the software (action: TE/MSC-TF)