Microtron,TL1 and Booster Diagnostics Status Hussein AL-MOHAMMAD RF & DI Group SESAME 12 th TAC.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

A.V. Systems Video Distribution And I.R. Integration.
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Automatic Conditioning J. Alberto Rodriguez. Outline Purpose of an automatic conditioning system General overview Fast signals Long term access to data:
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Status & operational experience of Liberas at SSRF Leng Yongbin, Yan Yingbing, Zhou Weimin, Chen Yongzhong Ye Kairong, Yuan Renxian, Zou Yi, Yu Luyang,
ERL Differential Current System Status Peter Cameron with contributions from Michelle Wilinski and Christophe DeFrance (Bergoz) 17 Sep 07.
AWAKE electron source New Electron Source WP at CERN
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
M. Attal, 10 th Technical Advisory Committee Meeting, May 10-11, 2010, Allan, Jordan Synchrotron-light for Experimental Science and Applications in the.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Basic Camera Function G The camera converts an optical image into electrical signals that are reconverted by a television receiver into visible screen.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
October, 2009 Internal Review Beam Instrumentation David Gassner.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
LUCX FACILITY INTRODUCTION : PRESENT STATUS AND FUTURE PLANS A. Aryshev On behalf of QB group and THz collaboration Mini-workshop for advanced THz and.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
D. Lipka DESY Hamburg Dark current Monitor for the European XFEL, tests at PITZ and FLASH.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
LEReC Instrumentation Gun Test Beam Line Summary Toby Miller
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
SESAME TL2 and SR Diagnostics
Report Technical Director Storage-Ring-Installation Completed
Dmitry Kayran on behalf of LEReC team Brookhaven National Laboratory
Beam diagnostics at the NICA
NICA injection complex status
SESAME Control System Status
The ELENA BPM System. Status and Plans.
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
Basic Camera Function The camera converts an optical image into electrical signals that are reconverted by a television receiver into visible screen images.
Electron Source Configuration
Beam Current Monitoring with ICT and BPM Electronics
Linac/BC1 Commissioning P
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Basic Camera Function The camera converts an optical image into electrical signals that are reconverted by a television receiver into visible screen images.
Status of the ASTRID2 RF systems
Breakout Session SC3 – Undulator
Presentation transcript:

Microtron,TL1 and Booster Diagnostics Status Hussein AL-MOHAMMAD RF & DI Group SESAME 12 th TAC

Beam Diagnostic Systems Mirotron DI Transfer Line 1 DI Booster DI 2

Beam Diagnostic Systems Mirotron DI Mirotron DI Deflection Tube, Gun Current, Magnetron : Forward & Reflected Power signals Deflection Tube, Gun Current, Magnetron : Forward & Reflected Power signals Transfer Line 1 DI Booster DI 3

Microtron DI / Signals 4

Microtron DI / Def. Tube 5

Beam Diagnostic Systems Mirotron DI Deflection Tube, Gun Current, Magnetron, Forward & Reflected Power signals Transfer Line 1 DI Transfer Line 1 DI Beam Current Monitor (BCM) Beam Current Monitor (BCM) Beam Foil Monitor (FOM) Beam Foil Monitor (FOM) Fast Current Transformer (FCT) Fast Current Transformer (FCT) Faraday Cup (FC) Faraday Cup (FC) Booster DI 6

Transfer Line1 Diagnostic 7

BCM is installed in the TL1 with RF DC blocker. The BCM not calibrated so it’s needs calibration in the Lab. The signal from this cavity is mainly used to give us an indication for the beam passage. Better solution for measuring the beam current is FCT ( Fast Current Transformer). The new FCT will be used to calibrate BCM. TL1 Diagnostic / BCM 8

Recently we received an FCT from ANKA for temporary period to be used in SESAME TL1 to measure the current, and solve the problems with BCM. The FCT is from Bergoz Instrumentation with BW 2GHz and 20 Turns. RF shield for it were made in the lab. The FCT is tested in the Lab and it’s already installed in TL1. FCT was installed in TL1 between FOM and FC and this temporary till purchasing new in-air FCT TL1 Diagnostic / FCT FCT with ShieldWhile testing in the Lab 9

The FOM is already installed in TL1. We use florescent screen AF995R. The problem with this type of materials is the long brightness time. Right now we use old BESSY video camera and take the signal directly to TV monitor in control room. TL1 Diagnostic / FOM 10

The Faraday Cup is already installed in TL1. This FC can handle 35Mev up to 7.6 cm stop range. The stopping is 4.71cm TL1 Diagnostic / FC FC 11

Beam Diagnostic Systems Mirotron DI Deflection Tube, Gun Current, Magnetron, Forward & Reflected Power signals Transfer Line 1 DI Beam Current Monitor (BCM) Beam Foil Monitor (FOM) Fast Current Transformer (FCT) Faraday Cup (FC) Booster DI Booster DI Beam Foil Monitor (FOM) Beam Foil Monitor (FOM) Beam Position Monitor(BPM) Beam Position Monitor(BPM) Fast Current Transformer (FCT) Fast Current Transformer (FCT) New Parametric Current Transformer (NPCT or DCCT) New Parametric Current Transformer (NPCT or DCCT) Visible Beam Light Visible Beam Light Tune Measurement Tune Measurement 12

Booster Diagnostic BPM FOM BPM DCCT FCT 13

3 FOMs in the booster One at injection septum One in section 1 and the third one in section 2 Pneumatic system will be used for all FOMs. Pneumatic system is tested and ready. Most of the screens are good but the septum FOM must be replaced. The cameras will be used good quality TV video camera.????? Booster Diagnostic/FOM 14

Old CT’s are available from BESSY. New devices are purchased: FCT from Bergoz NPCT (DCCT) from Bergoz Booster Diagnostic/ CT 15

These new FCT and NPCT can give us the exact and accurate current. There is enough space in booster sections 3 & 6, FCT will be installed in booster section 3 and the NPCT in booster section 6, we can swap between them. These CT’s are in-air type. The electronics for NPCT(DCCT) and cables provided from Bergoz. Booster Diagnostic/ FCT,NPCT 16

6-BPM blocks are available. 1.4-SLM. 2.2-BP. Phase matched cables are used. All of these BPMs will be tested in the Lab using the instruments :Spectrum Analyzer,Network Analyzer, Oscilloscope and design test bench. Booster Diagnostic/BPM 17

Libera electron had arrived to SESAME from Instrumentation technologies (Slovenia) We have 7 Libera electron for the booster and 1 clock splitter. Cable lengths are as follows: 1.BPM1,3 is 23m. 2.BPM4,6 is 29m. 3.BPM2 is 17m. 4.BPM5 is 35m. Booster Diagnostic/Libera Libera electronLibera clock splitter 18

Booster Diagnostic / Libera 19

Booster Diagnostic/Libera 20

Booster Diagnostic/Libera 21

Booster Diagnostic/Libera 22

Booster Diagnostic/Libera 23

Booster Diagnostic/Libera Rack 24

Booster Diagnostic/Tune Measurement From last TAC no change in plan for tuning measurement. Two 10W Amplifier will be purchased with frequency ( )MHz. Libera Detector Data Control System Amp NGx Shaker BPM4 Booster Amp NGy 25

26